Loading...

Mesyuarat Jawatankuasa OSC

Majlis Bandaraya Subang Jaya


Mesyuarat Jawatankuasa OSC, Majlis Bandaraya Subang Jaya

 

TAJUK MESYUARAT

:

MESYUARAT JAWATANKUASA PUSAT SETEMPAT (OSC) PERANCANGAN DAN PEMBANGUNAN MAJLIS BANDARAYA SUBANG JAYA BIL. 18/2025

TARIKH

:

23 SEPTEMBER 2025 (SELASA)

MASA

:

2:30 PM

TEMPAT

:

BILIK MESYUARAT KENANGA, ARAS 2, BANGUNAN MAJLIS BANDARAYA SUBANG JAYA, PERSIARAN PERPADUAN, USJ 5, 47610 SUBANG JAYA, SELANGOR DARUL EHSAN.

PENGERUSI

:

DATO’ AMIRUL AZIZAN BIN DATO’ SRI ABD. RAHIM

 

AGENDA MESYUARAT

 

1

PERUTUSAN PENGERUSI MESYUARAT OSC

2

PENGESAHAN MINIT MESYUARAT MESYUARAT JAWATANKUASA PUSAT SETEMPAT (OSC) PERANCANGAN DAN PEMBANGUNAN MAJLIS BANDARAYA SUBANG JAYA BIL. 17/2025 PADA 03-09-2025

3

PERKARA-PERKARA BERBANGKIT

4

PEMBENTANGAN PERMOHONAN PEMAJUAN KELULUSAN

5

PEMBENTANGAN DAN PERTIMBANGAN KERTAS DASAR

6

PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN

7

PEMBENTANGAN KERTAS PEMAKLUMAN

8

PEMBENTANGAN STATUS DAN ISU PEMANTAUAN TAPAK

9

HAL-HAL LAIN BERKAITAN PERMOHONAN I

10

HAL-HAL LAIN BERKAITAN PERMOHONAN II

11

HAL-HAL LAIN

 

Kertas Pembentangan

A. 1.0 AGENDA MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 18_2025

 
AGENDA MESYUARAT
 
 

B. 2.0 MINIT MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 17_2025

 
MINIT MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 17
 
 

C. 3.0 MAKLUMBALAS KEPUTUSAN MESYUARAT JAWATANKUASA OSC PERANCANGAN DAN PEMBANGUNAN BIL.18_2025

 
MAKLUMBALAS KEPUTUSAN MESYUARAT JAWATANKUASA OSC PERANCANGAN DAN PEMBANGUNAN BIL.18
 
 

D. PEMBENTANGAN PERMOHONAN SERENTAK

 

1. 4.1 KERTAS KERJA : 116/86/18/2025

 
4.1 KERTAS KERJA : 116/86/18/2025
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN
CADANGAN TAMBAHAN DAN UBAHSUAI BANGUNAN KE ATAS 1 UNIT KILANG TERES 1 ½ TINGKAT YANG SEDIA ADA KEPADA 2 TINGKAT DI ATAS PT 1718, NO. 21, JALAN PJS 11/9, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250825-005
MBSJ-PB20250826-005
4.1 P. PURAVIAPPAN AL S.P PERIYANNAN.PDF
 
Oleh
UNTUK: P. PURAVIAPPAN A/L S.P PERIYANNAN
 
 

 

2. 4.2 KERTAS KERJA : 117/86/18/2025

 
4.2 KERTAS KERJA : 117/86/18/2025
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN
CADANGAN MEROBOH DAN MEMBINA SEMULA KE ATAS SATU (1) UNIT RUMAH SESEBUAH 2 1/2 TINGKAT SEDIA ADA KEPADA SATU (1) UNIT RUMAH SESEBUAH 2 TINGKAT, 1 TINGKAT BESMEN BERSERTA RUANG UTILITI DI TINGKAT BUMBUNG DI ATAS PT 753, DI ALAMAT NO. 100 (DI TAPAK NO. 168), JALAN TIMAH 2, THE MINES RESORT CITY, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250825-003
MBSJ-PB20240727-003-A01
4.2 TAN YU WEI.PDF
 
Oleh
UNTUK : TAN YU WEI
 
 

 

3. 4.3 KERTAS KERJA : 118/86/18/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNANCADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS 1 UNIT KEDAI TERES 1 TINGKAT SEDIA ADA KEPADA 2 TINGKAT DI ATAS PT. 27390 (HSM 26441), NO. 21, JALAN USJ 1/4B, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250828-001
MBSJ-PB20250902-005
4.3 LOW SHUN KANG.PDF
 
Oleh
LOW SHUN KANG
 
 

 

4. 4.4 KERTAS KERJA : 119/86/18/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG + PELAN JALAN DAN PERPARITAN + PELAN BANGUNAN + PELAN LANDSKAP
CADANGAN MENDIRIKAN 1 UNIT SURAU DI ATAS LOT 87405, JALAN TPT 1, TAMAN PUCHONG TEKALI, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250903-001
MBSJ-JP20250903-001
MBSJ-PB20250903-010
MBSJ-PL20250903-001
4.4 PACIFIC GRANDLAND SDN BHD- JABATAN AGAMA ISLAM SELANGOR.PDF
 
Oleh
UNTUK: PACIFIC GRANDLAND SDN. BHD. /JABATAN AGAMA ISLAM SELANGOR
 
 

 

5. 4.5 KERTAS KERJA : 120/86/18/2025

 
PERMOHONAN SERENTAK : KEBENARAN MERANCANG + PELAN LANDSKAP
CADANGAN MEROBOH 2 UNIT GUDANG DAN MEMBINA SEMULA 1 UNIT GUDANG SESEBUAH 1 TINGKAT DAN 1 UNIT PEJABAT SESEBUAH 2 TINGKAT DI ATAS PT 43321 DAN PT 43322, JALAN BP 4/1, BANDAR BUKIT PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250821-002
MBSJ-PL20250821-001
4.5 DANAU ALLIANCE SDN. BHD.PDF
 
Oleh
UNTUK : DANAU ALLIANCE SDN BHD
 
 

 

6. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 19/2025 PADA 19 OGOS 2025)

 
PERMOHONAN SERENTAK : KEBENARAN MERANCANG + PELAN KERJA TANAH + PELAN LANDSKAP + PELAN ALAMAT

CADANGAN PEMBANGUNAN PERUMAHAN (2,476 UNIT) YANG MENGANDUNGI:
1. FASA 1
A. MENARA A – 37 TINGKAT PANGSAPURI HARGA BEBAS (1,380 UNIT) DARI TINGKAT 9 HINGGA TINGKAT 45
B. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI KEBUK SAMPAH, BILIK PETI SURAT, PONDOK PENGAWAL DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 1
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI BILIK PETI SURAT, PEJABAT PENGURUSAN, TAMAN PERMAINAN, GELANGGANG SUKAN, TADIKA, RUANG MEDITASI, RUANG WARGA EMAS, SURAU (LELAKI DAN PEREMPUAN), BILIK PENGURUSAN JENAZAH DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 2
D. 6 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 3 HINGGA TINGKAT 8
E. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI GELANGGANG SUKAN DAN KOLAM RENANG DI TINGKAT 9

2. FASA 2
A. MENARA C – 26 TINGKAT PANGSAPURI HARGA BEBAS (416 UNIT) DARI TINGKAT 9 HINGGA TINGKAT 34
B. 3 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 6 HINGGA TINGKAT 8
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI KOLAM SPA DI TINGKAT 9

3. FASA 3
A. MENARA B – 37 TINGKAT PANGSAPURI HARGA BEBAS (680 UNIT) DARI TINGKAT 9 HINGGA TINGKAT 45
B. 4 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 5 HINGGA TINGKAT 8
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI DEWAN SERBAGUNA, GIMNASIUM DAN KOLAM RENANG DI TINGKAT 9

DI ATAS LOT 65797 SELUAS 8.707 EKAR, JALAN BUKIT JALIL INDAH, MUKIM PEKAN KINRARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : PACIFIC GREENVIEW SDN BHD
 
Oleh
SHAMSOL JEFFRI BIN ZAINAL ABIDIN
 
 

 

7. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 19/2025 PADA 19 OGOS 2025)

 
PERMOHONAN SERENTAK: PINDAAN KEBENARAN MERANCANG + PINDAAN PELAN LANDSKAP + PINDAAN PELAN ALAMAT

CADANGAN PEMBANGUNAN PANGSAPURI (988 UNIT) YANG MENGANDUNGI: -
A. 1 MENARA PANGSAPURI (288 UNIT) 34 TINGKAT DARI TINGKAT 3 HINGGA TINGKAT 36
B. 1 MENARA PANGSAPURI (349 UNIT) 33 TINGKAT DARI TINGKAT 5 HINGGA TINGKAT 37
C. 1 MENARA PANGSAPURI (351 UNIT) 33 TINGKAT DARI TINGKAT 5 HINGGA TINGKAT 37
D. TEMPAT LETAK KENDERAAN 1 TINGKAT DAN RUANG MEKANIKAL DAN ELEKTRIKAL DI TINGKAT SEPARA BAWAH TANAH DENGAN KEMUDAHAN PONDOK PENGAWAL, TEMPAT PEMBUANGAN SAMPAH, PETI SURAT, BILIK BACAAN DAN SURAU
E. PODIUM TEMPAT LETAK KENDERAAN 6 TINGKAT DARI TINGKAT 1 HINGGA TINGKAT 6
F. KEMUDAHAN-KEMUDAHAN LAIN: -
I) PEJABAT PENGURUSAN, TADIKA DAN PETI SURAT DI TINGKAT 1
II) RUANG AKTIVITI WARGA EMAS DI TINGKAT 2
III) DEWAN DAN LANDSKAP DI TINGKAT 7

PINDAAN MELIBATKAN PERKARA SEPERTI YANG BERIKUT:
A) PERTAMBAHAN RUANG LANTAI BERSIH DARI 880,497 KP KEPADA 881,211 KP
B) PENGURANGAN 1 UNIT KEDIAMAN IAITU DARIPADA 350 UNIT KEPADA 349 UNIT DARI TINGKAT 5 HINGGA TINGKAT 37 (MENARA B)
C) PERTAMBAHAN 1 UNIT KEDIAMAN IAITU DARIPADA 350 UNIT KEPADA 351 UNIT DARI TINGKAT 5 HINGGA TINGKAT 37 (MENARA C)
D) PERTAMBAHAN KELUASAN KAWASAN LAPANG DARIPADA 73,367 MP KEPADA 82,837 MP

SELUAS 8.06 EKAR, DI ATAS PT 7391 (LOT 102339), JALAN PUCHONG UTAMA 1, TAMAN PUCHONG UTAMA, 47140, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN

UNTUK: HILLCREST GARDENS SDN. BHD. (14015-T)
 
Oleh
MAK CHEE SENG
 
 

 

8. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 19/2025 PADA 19 OGOS 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI 1 UNIT KEDAI PEJABAT 2 1/2 TINGKAT SEDIA ADA KEPADA 3 TINGKAT DI ATAS PT 60864 (HSD 246206), NO.1, JALAN PUJ 3/10, TAMAN PUNCAK JALIL, BANDAR PUTRA PERMAI, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK: INTRA DESIGN SDN BHD (163284-W)
 
Oleh
AHMAD AZAM BIN ARSHAD
 
 

 

9. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
4.1 KERTAS KERJA : 111/81/17/2025

PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN MEROBOH DAN MEMBINA SEMULA KE ATAS SEBUAH RUMAH TERES 1 TINGKAT YANG SEDIA ADA DI ATAS LOT 5107, NO. 40, JALAN SS14/2D, SS14, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK: GOH SUE SENG & THONG YAN YEE
MBSJ-KM20250806-005
MBSJ-PB20250806-009
 
Oleh
TAN ZHE WEI
 
 

 

10. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
4.2 KERTAS KERJA : 112/81/17/2025

PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS SATU (1) UNIT KILANG TERES 1 ½ TINGKAT SEDIA ADA KEPADA 2 TINGKAT DI ATAS PT 1723, NO. 31, JALAN PJS 11/9, BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK: WOON YOKE MOOI
MBSJ-KM20250805-001
MBSJ-PB20250811-006
 
Oleh
CHONG CHIN MEOW
 
 

 

11. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
4.3 KERTAS KERJA : 113/81/17/2025

PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI PADA BANGUNAN KILANG BERKEMBAR 3 TINGKAT SEDIADA BESERTA 1 TINGKAT MEZZANINE (JENIS KEKAL BERSAIZ 45’ X 75’) DI ATAS PT 3292, JALAN BS 7/1C, TAMAN PERINDUSTRIAN BUKIT SERDANG, SEKSYEN 7, TAMAN BUKIT SERDANG, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK: H&H PRODUCTION SDN. BHD.
MBSJ-KM20250805-003
MBSJ-PB20250808-002
 
Oleh
NAZARUDIN BIN MASAT
 
 

 

12. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
4.4 KERTAS KERJA : 114/81/17/2025

PERMOHONAN SERENTAK: KEBENARAN MERANCANG + PELAN KERJA TANAH + PELAN JALAN DAN PERPARITAN + PELAN LANDSKAP + PELAN ALAMAT

CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN (998 UNIT) 40 TINGKAT YANG MENGANDUNGI:
A. MENARA A - 33 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (275 UNIT) DAN PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (250 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 39
B. MENARA B - 34 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (473 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 40
C. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI KOLAM RENANG, DEWAN SERBAGUNA, GIMNASIUM, BILIK SERBAGUNA, BILIK BACAAN, DOBI DAN TAMAN PERMAINAN DI TINGKAT 7
D. 6 TINGKAT PODIUM TEMPAT LETAK KERETA DARI TINGKAT 1 HINGGA TINGKAT 6
E. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI PEJABAT PENGURUSAN, TADIKA, SURAU (LELAKI DAN PEREMPUAN), KEDAI, BILIK PETI SURAT DAN KEBUK SAMPAH BERPUSAT DI TINGKAT 1
F. 1 TINGKAT BESMEN YANG MENGANDUNGI RUANG MEKANIKAL DI TINGKAT B1
DI ATAS LOT 92196 SELUAS 3.378 EKAR, PERSIARAN SUBANG, USJ 7, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK: SIME DARBY PROPERTY (SJ7) SDN. BHD.
MBSJ-KM20250317-002
MBSJ-TJB20250814-001
MBSJ-KT20250813-001
MBSJ-JP20250814-001
MBSJ-PL20250812-001
 
Oleh
RENO LEE TEIK CHUAN
 
 

E. PEMBENTANGAN PERMOHONAN KEBENARAN MERANCANG

 

13. 5.1 KERTAS KERJA BIL. : 249/87/18/2025

 
PERMOHONAN KM SAHAJA
PERMOHONAN PINDAAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN (PELAN SUSUN ATUR TELAH DILULUSKAN BIL. MBSJ.JPB.BP1.600-1/1/41/PS(E) BERTARIKH 11 MAY 2023) BAGI CADANGAN MEMBINA SATU (1) BLOK BANGUNAN PERNIAGAAN YANG MENGANDUNGI:

DI ATAS LOT 74746, SELUAS 3.769 EKAR, PERSIARAN SUBANG PERMAI USJ 1, SUBANG JAYA, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN HCK BUILDERS SDN. BHD. (1251331-U).
 
 

 

14. 5.2 KERTAS KERJA BIL. : 250/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MEMBUAT PERUBAHAN MATERIAL KEGUNAAN TANAH DARIPADA INSTITUSI KEMUDAHAN MASYARAKAT (SIMPANAN SEKOLAH USJ 1) KEPADA TAPAK SEMAIAN YANG MENGANDUNGI: -
I) 4 UNIT STRUKTUR BANGUNAN TERBUKA TAPAK SEMAIAN DAN JUALAN POKOK HIASAN (NURSERI)
II) 1 UNIT PONDOK PENGAWAL
III) 1 UNIT KEBUK SAMPAH
DI ATAS SEBAHAGIAN LOT 92240 (PLOT A), SELUAS 4.741 EKAR, JALAN SUBANG 4, USJ 1, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN

(MBSJ-KM20250825-007)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK TETUAN JEWEL STARLIGHT (M) SDN. BHD.
 
 

 

15. 5.4 KERTAS KERJA BIL. : 252/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERINDUSTRIAN (KILANG SESEBUAH) KEPADA PUSAT SUKAN (PICKLEBALL), KAFE DAN PUSAT JUALAN BARANGAN SUKAN DI ATAS PT. 9419 (HSD 23907), NO. 2, JALAN SS 13/3F, 47500 SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : ULTIMATE PREMIER PICKLE SDN. BHD. (1597189-M)
(MBSJ.JPB.BP1.600-1/4/454)
(MBSJ-KM20250821-005)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : ULTIMATE PREMIER PICKLE SDN. BHD. (1597189-M)
 
 

 

16. 5.5 KERTAS KERJA BIL. : 253/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERINDUSTRIAN KILANG TERES 1 ½ TINGKAT SEDIA ADA KEPADA PUSAT MAKANAN (RESTORAN) DI ATAS PT 1877, NO. 59, JALAN PJS 11/7, PJS 11, BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : ZAP FAN FACTORY SDN. BHD. (1607408-D)
(MBSJ.JPB.BP1.600-1/4/469)
(MBSJ-KM20250825-001)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : ZAP FAN FACTORY SDN. BHD. (1607408-D)
 
 

 

17. 5.6 KERTAS KERJA BIL. : 254/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN ''MINIPOLE' JENIS LED DIGITAL SATU (1) MUKAAN BERUKURAN 30' (P) X 20' (L) SECARA MENEGAK DI ATAS SEBAHAGIAN RIZAB JALAN, PERSIMPANGAN PERSIARAN BAKTI / PERPADUAN (BERHAMPIRAN STESEN MINYAK SHELL, JALAN USJ 6/2), USJ 6, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK LEDWORKZ SDN. BHD. (1427954-W)
 
 

 

18. 5.8 KERTAS KERJA BIL. : 256/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG CADANGAN PENDIRIAN SATU (1) UNIT STRUKTUR PAPAN IKLAN LUARAN JENIS STATIK DAN LED BERUKURAN '40' (P) X 30' (L) X 80' (T) (2 MUKAAN) SECARA MENEGAK DI ATAS SEBAHAGIAN LOT 1704, JALAN KENARI 12, PUCHONG JAYA, 43300 PUCHONG, SELANGOR DARUL EHSAN

UNTUK : EURO ADVERTISING SDN. BHD. (897981-A)
(MBSJ.JPB.BP4.600-1/11/41)
(MBSJ.-KM20250814-009)
- PERMOHONAN BARU KEBENARAN MERANCANG PAPAN IKLAN
 
Oleh
UNTUK EURO ADVERTISING SDN. BHD.
 
 

 

19. 5.9 KERTAS KERJA BIL. : 257/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN 'BILLBOARD' JENIS STATIK SATU (1) MUKAAN BERUKURAN 10' (P) X 40' (L) SECARA MELINTANG DI ATAS TANAH RIZAB KERAJAAN DI JALAN KINRARA 5, MUKIM PEKAN KINRARA, DAERAH PETALING, SELANGOR DARUL EHSAN


(MBSJ.JPB.BP4.600-1/11/41)
(MBSJ.-KM20250814-009)
- PERMOHONAN BARU KEBENARAN MERANCANG PAPAN IKLAN
 
Oleh
UNTUK : EDSB OUTDOOR SDN. BHD. (420387-M)
 
 

 

20. 5.10 KERTAS KERJA BIL. : 258/87/18/2025

 
PERMOHONAN PINDAAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN (PELAN LULUS BIL.MPSJ.JPB.BP5.600-1/1/62/PB-L1 BERTARIKH 28 SEPTEMBER 2022) SEBUAH KILANG PERUSAHAAN BESI/LOGAM DAN PEJABAT 4 TINGKAT SELUAS 3.80 EKAR, DI ATAS LOT 13 (GRN 57169), JALAN PPU 3, TAMAN PERINDUSTRIAN PUCHONG UTAMA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
PINDAAN MELIBATKAN PERKARA SEPERTI BERIKUT :
A. PERTAMBAHAN PENCAWANG ELEKTRIK DARIPADA 1 UNIT KEPADA 2 UNIT.
B. PENGURANGAN KELUASAN BILIK PAM DARIPADA 12.56 MP KEPADA 9.00 MP.
C. PENGURANGAN KELUASAN TANGKI AIR DARIPADA 39.18 MP KEPADA 5.48 MP.
D. PERTAMBAHAN TERES BERKELUASAN 39.69 MP.
E. MEMANSUHKAN PONDOK PENGAWAL.

(MBSJ.JPB.BP5.600-1/1/62 JLD. 3)
(MBSJ.OSC.600-1/1651/KM1)
 
Oleh
UNTUK : PHH REALTY SDN. BHD. (501861-H)
 
 

 

21. 5.12 KERTAS KERJA BIL. : 260/87/18/2025

 
PERMOHONAN PINDAAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN KE ATAS PELAN SUSUN ATUR YANG TELAH DILULUSKAN (MBSJ.JPB.BP7.600-1/1/55/PB (A) BERTARIKH 17 OKT 2024) BAGI CADANGAN MENDIRIKAN SATU (1) BLOK PEMBANGUNAN PANGSAPURI PERKHIDMATAN PERNIAGAAN 40 TINGKAT
(376 UNIT) YANG MENGANDUNGI:
FASA 1:
A. 1 TINGKAT KEMUDAHAN AWAM YANG MENGANDUNGI RUANG PETI SURAT,PEJABAT PENGURUSAN, KAUNTER PENGAWAL, RUANG PEMUNGGAHAN, KEBUK SAMPAH DAN RUANG E-HAILING DI SEBAHAGIAN TINGKAT 1.
B. 1 UNIT KEMUDAHAN AWAM TADIKA DI SEBAHAGIAN TINGKAT 2.
C. 8 UNIT RUANG PERNIAGAAN DI TINGKAT 1 DAN 7 UNIT RUANG PERNIAGAAN DI SEBAHAGIAN TINGKAT 2
D. 2 TINGKAT PODIUM TEMPAT LETAK KENDERAAN DI SEBAHAGIAN TINGKAT 1 DAN 2
FASA 2:
A. 32 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (301 UNIT) DAN PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (75 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 38 SERTA “ROOF GARDEN” DISEBAHAGIAN TINGKAT 22
B. TANGKI AIR DAN “ROOF GARDEN” DI TINGKAT 39
C. 3 TINGKAT PODIUM TEMPAT LETAK KENDERAAN DARI TINGKAT 3 HINGGA TINGKAT 5
D. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI TEATER MINI, BILIK CO-WORKING, RUANG SOLAT (LELAKI & PEREMPUAN), DEWAN SERBAGUNA, GIMNASIUM, KOLAM RENANG, BILIK BACAAN, SPORT LOUNGE DAN BILIK PERSALINAN DI SEBAHAGIAN TINGKAT 6
E. 1 UNIT RUANG PERNIAGAAN DI SEBAHAGIAN TINGKAT 6
DI ATAS LOT 172, SELUAS 1.279 EKAR, JALAN SP 2/9, TAMAN SERDANG PERDANA, SEKSYEN 2, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK: JRK (SERI KEMBANGAN) SDN. BHD. (1565446-K)
PINDAAN MELIBATKAN PERKARA SEPERTI BERIKUT :
A) PEMBANGUNAN 1 FASA KEPADA 2 FASA
B) PERTUKARAN HAKPEMILIKAN DARIPADA SYARIKAT CAHAYA MANIS SDN. BHD. (63754 - U) KEPADA JRK (SERI KEMBANGAN) SDN BHD. (1565446-K)
 
Oleh
UNTUK: JRK (SERI KEMBANGAN) SDN. BHD. (1565446-K)
(MBSJ.JPB.BP7.600-1/1/55 JLD.3)
(MBSJ-KM20250908-003)
 
 

 

22. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN PERMIT MEROBOH SEBUAH BANGUNAN RUMAH SESEBUAH 2 TINGKAT SEDIA ADA DI ATAS SEBAHAGIAN RIZAB JALAN 50’, LOT PT 1384, PT 1385, PT 1386, PT 1387, PT 1388 & PT 1389, PERSIARAN WANGSA BAIDURI 7, TAMAN WANGSA BAIDURI, SS 12, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK: SHAREEN BINTI DATUK SERI MOHAMED IQBAL
 
 

 

23. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU UNIT STRUKTUR PAPAN IKLAN "UNIPOLE"3 MUKAAN YANG BERUKURAN 30 KAKI (P) X 80 KAKI (L) DI ATAS SEBAHAGIAN TANAH KERAJAAN LOT 6757, (RIZAB KAWASAN LAPANG), DI ANTARA PERSIMPANGAN JALAN SUBANG UTAMA DAN PERSIARAN TUJUAN, SS 18, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK TETUAN : KEYSPAN EXPRESS SDN BHD
 
Oleh
TETUAN : KEYSPAN EXPRESS SDN
 
 

 

24. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN "MINIPOLE" BERUKURAN 30'(P) X 20'(L) (1 MUKAAN)
SECARA MENEGAK DI ATAS SEBAHAGIAN RIZAB JALAN, DI PERSIARAN JALAN JENGKA / JALAN KEMAJUAN SUBANG (BERSEBELAHAN JALAN SS 15/1 A), SS15, SUBANG JAYA,
MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
GPS: 3.08228,101.584905
UNTUK: BESTARI MEDIA SDN. BHD.
 
 

 

25. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN JENIS DIGITAL LED 1 MUKAAN SECARA MELINTANG YANG BERUKURAN 75.6 KAKI (P) X 31.5 KAKI (L), PADA DINDING BANGUNAN CASA SQUARE DI ATAS LOT 1716 (PT 17400), LEBUHRAYA DAMANSARA PUCHONG (LDP), BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK TETUAN : KEYSPAN EXPRESS SDN BHD
 
Oleh
JABERI BIN AMI
 
 

 

26. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG ROBOH BANGUNAN BAGI GUDANG SESEBUAH SATU TINGKAT DI ATAS LOT 541, JALAN SUBANG 2, TAMAN PERINDUSTRIAN SUBANG USJ 1, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK SDB SUBANG DEVELOPMENT SDN. BHD. (1335702 - V)
 
Oleh
TPR A LOKMAN BIN AB GHANI
 
 

 

27. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERINDUSTRIAN (KILANG TERES) KEPADA RESTORAN DI ATAS PT 1637, NO. 21, JALAN PJS 11/16, BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
UNTUK : LOYAL 7 ASIA SDN. BHD. (1282994-X)
 
Oleh
MOHD ARIF BIN RAHMAT
 
 

 

28. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERNIAGAAN KEPADA ASRAMA PEKERJA KE ATAS KEDAI PEJABAT 3 TINGKAT SEDIA ADA (UNIT NO. 34 TINGKAT 2 DAN UNIT NO. 36 TINGKAT 1 DAN 2) DI ATAS LOT 8093 (GN 298192) & LOT 8094 (GN 298193), DI ALAMAT NO. 34 & 36, JALAN SS15/4, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK : DATUK TOH YU HUAT
 
Oleh
IRENE TAN SIEW KEE
 
 

 

29. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN LELANGIT 4 MUKAAN BERUKURAN 9M (T) X 9.81M (L) (29.52’ X 32.18’) YANG DIDIRIKAN DI ATAS BUMBUNG BANGUNAN KOMPLEKS PERNIAGAAN (AEON) DI ATAS SEBAHAGIAN LOT 95272 (PN 79952), PERSIARAN LESTARI PERDANA 1, TAMAN EQUINE, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
UNTUK : AEON CO. (M) BERHAD.
 
Oleh
MOHD FAHARUDDIN BIN AMRAN
 
 

 

30. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN PELAN ALAMAT UNTUK CADANGAN MEMBINA BALAI RAYA (AWAM) 1 TINGKAT DI ATAS LOT 86251, JALAN MUTIARA 2/20, TAMAN MUTIARA INDAH, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

PEMBINAAN OLEH PIHAK PEMAJU: DARUL OMNI SDN BHD
 
Oleh
MAH CHAN NAM
 
 

F. PEMBENTANGAN PERMOHONAN PELAN KERJA TANAH

 

31. 6.1.2 KERTAS MESYUARAT. : 77/88/18/2025

 
CADANGAN KELULUSAN PELAN KERJA TANAH BAGI CADANGAN MEMBINA SEBUAH RUMAH KEDIAMAN BANGLO 3 TINGKAT DI ATAS LOT 76448, JALAN SHT 3, SUBANG HEIGHT EAST, 47500, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
6.1.1 TAN SEE SAIP.PDF
 
Oleh
TAN SEE SAIP
 
 

 

32. 6.1.3 KERTAS MESYUARAT. : 78/88/18/2025

 
CADANGAN PINDAAN PELAN KERJA TANAH BAGI PELAN YANG TELAH DILULUSKAN DENGAN RUJ. MBSJ.KEJ.600-1/19/39(17) BAGI MEMBINA 386 UNIT PANGSAPURI HARGA BEBAS YANG MENGANDUNGI:

A. MENARA A - 25 TINGKAT PANGSAPURI (193 UNIT) DARI TINGKAT ARAS TANAH HINGGA TINGKAT 24
B. MENARA B - 25 TINGKAT PANGSAPURI (193 UNIT) DARI TINGKAT ARAS TANAH HINGGA TINGKAT 24
C. KEMUDAHAN PENDUDUK YANG MENGANDUNGI DEWAN SERBAGUNA, BILIK PETI SURAT, TADIKA, SURAU / RUANG SOLAT (LELAKI & PEREMPUAN), PEJABAT PENGURUSAN, KOLAM RENANG, GIMNASIUM, RUANG WARGA EMAS, BILIK MEDITASI DAN BILIK BACAAN DI TINGKAT FASILITI
D. TEMPAT LETAK KENDERAAN DI SEBAHAGIAN TINGKAT ARAS TANAH
E. 2 TINGKAT SUB BESMEN TEMPAT LETAK KENDERAAN DI TINGKAT B1 DAN B2
F. 1 UNIT PONDOK PENGAWAL
G. 1 UNIT KEBUK SAMPAH

DI ATAS HAK MILIK GM 257 (LOT 585), JALAN PUTRA PERMAI 10/4J, PUTRA HEIGHTS, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN

UNTUK: PP SOUTH DEVELOPMENT SDN. BHD.

PERMOHONAN: PINDAAN KERJA TANAH
1. PINDAAN KEDUDUKAN LALUAN KELUAR MASUK KERJA TANAH, WASH THROUGH DAN SILT TRAP
6.1.2 PP SOUTH DEVELOPMENT SDN. BHD..PDF
 
Oleh
PP SOUTH DEVELOPMENT SDN. BHD.
 
 

 

33. 6.1.3 KERTAS MESYUARAT. : 79/88/18/2025

 
CADANGAN KELULUSAN PELAN KERJA TANAH BAGI KERJA-KERJA DI FASA 1, FASA 2 (GROUND ZERO, ML260 & ML260R (BAHARU)) YANG MENGANDUNGI:
I) PEJABAT TAPAK
II) TANDAS MUDAH ALIH
III) PONDOK PENGAWAL
DI ATAS LOT 81038, 81039, PUTRA HEIGHTS, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
UNTUK TETUAN PETRONAS GAS BERHAD
6.1.3 PETRONAS GAS BERHAD.PDF
 
Oleh
PETRONAS GAS BERHAD
 
 

 

34. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN PINDAAN PELAN KELULUSAN KERJA TANAH KEPADA FAIL LULUS MBSJ.KEJ.600-1/19/154(10) BERTARIKH 14 NOVEMBER 2024 BAGI PEMBANGUNAN:
CADANGAN MEMBINA PANGSAPURI YANG MENGANDUNGI:-
A. MENARA A - 28 TINGKAT PANGSAPURI HARGA BEBAS (418 UNIT)
B. MENARA B – 10 TINGKAT PANGSAPURI RUMAH SELANGORKU JENIS TRIO (108 UNIT)
C. 4 TINGKAT PODIUM TEMPAT LETAK KERETA DARI ARAS BAWAH (G) SEHINGGA ARAS 4 DAN 3 TINGKAT TEMPAT LETAK KERETA ARAS SEPARA BAWAH TANAH DARI LG1 SEHINGGA LG3
D. KEMUDAHAN SEPERTI DEWAN SERBAGUNA, PEJABAT PENGURUSAN, GIMNASIUM, KOLAM RENANG, DOBI DAN KEDAI DI ARAS 4, TADIKA DAN SURAU DI ARAS LG3
E. 1 UNIT PONDOK PENGAWAL
F. 1 UNIT RUMAH SAMPAH, PEMBUANGAN SISA PUKAL DAN KITAR SEMULA
DI ATAS LOT 3510 SELUAS 5.000 EKAR, JALAN BS 5/27, SEKSYEN 2, TAMAN BUKIT SERDANG, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK: PREMIEREX SDN BHD
 
Oleh
CHIN HAU YONG
 
 

 

35. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
CADANGAN KELULUSAN PELAN KERJA TANAH BAGI CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT DI ATAS PT80784 (HSD 283755), NO. 28, JALAN LP 2/1, TAMAN LESTARI PERDANA, BANDAR PUTRA PERMAI, 43300 SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK TETUAN
PUAN LIM CHAI HOON DAN ENCIK YUEN YEOW TEAM
 
Oleh
LEE CHING SONG
 
 

G. PEMBENTANGAN PERMOHONAN PELAN JALAN DAN PERPARITAN

 

36. 6.2.1 KERTAS MESYUARAT. : 80/88/18/2025

 
PERMOHONAN PINDAAN PELAN JALAN DAN PERPARITAN: CADANGAN PINDAAN KELULUSAN PELAN JALAN DAN PERPARITAN YANG TELAH DILULUSKAN FAIL RUJUKAN NO: MBSJ.KEJ.600-1/20/122(9) BERTARIKH 27 MEI 2025 BAGI MEMBINA CADANGAN PEMBANGUNAN 32 UNIT RUMAH TERES 2 A 1/2 TINGKAT DI ATAS PT6853-PT6866 DAN PT6868-PT6885, TAMAN PUCHONG INTAN, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
6.2.1 DK-EXCEL AUTO LEATHER SDN. BHD..PDF
 
Oleh
UNTUK TETUAN DK-EXCEL AUTO LEATHER SDN. BHD.
 
 

 

37. 6.2.2 KERTAS MESYUARAT. : 81/88/18/2025

 
CADANGAN KELULUSAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN REJUVENASI DAN PENAMBAHBAIKAN JALAN DI PUSAT PERNIAGAAN JALAN KENARI, BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
6.2.2 PILIHAN MEGAH SDN. BHD..PDF
 
Oleh
UNTUK TETUAN PILIHAN MEGAH SDN. BHD.
 
 

 

38. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
CADANGAN MEMBINA 1 UNIT RUMAH SESEBUAH 2 TINGKAT DAN 3
TINGKAT SERTA PONDOK PENGAWAL DI ATAS PT 925, JALAN
PALONG 1, THE MINES RESORT CITY, SERI KEMBANGAN, MUKIM
PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK
TETUAN LIM SAY SUAN DAN TAN SING YEE.
 
Oleh
CHANG CHENG WAH
 
 

 

39. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN MENDIRIKAN BANGUNAN SEMENTARA PUSAT SUKAN ‘PICKLEBALL’ YANG TERDIRI:
A. 3 UNIT GELANGGANG PADEL BERBUMBUNG
B. 4 UNIT GELANGGANG PICKLEBALL TERBUKA
C. 7 UNIT GELANGGANG PICKLEBALL BERBUMBUNG
DI ATAS SEBAHAGIAN TAMAN TASIK SUBANG RIA, LOT 17394, JALAN SS 12/1, SS12, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK: GAMEON ATHLETICS SDN. BHD.
 
Oleh
ANG HUCK KOON @ ANG HUCK CHAI
 
 

H. PEMBENTANGAN PERMOHONAN PELAN LAMPU JALAN

 

40. 6.3.1 KERTAS MESYUARAT. : 82/88/18/2025

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN PERUBAHAN MATERIAL KEGUNAAN TANAH DARIPADA PERUMAHAN KEPADA PUSAT PAMERAN 1 TINGKAT YANG MENGANDUNGI:
A. GALERI PAMERAN 1 TINGKAT
B. RUMAH CONTOH 1 TINGKAT
C. KAFETERIA 1 TINGKAT
D. TAMAN PERMAINAN KANAK-KANAK
E. GELANGGANG PERMAINAN
F. 1 UNIT PENCAWANG PADAT
G. 1 UNIT RUMAH SAMPAH DAN STOR PENYELENGGARAAN
SELUAS 4.702 EKAR DI ATAS LOT 5226, JALAN PUCHONG UTAMA 3, TAMAN PUCHONG UTAMA, 47140 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
6.3.1 HILLCREST GARDENS SDN. BHD..PDF
 
Oleh
UNTUK TETUAN : HILLCREST GARDENS SDN. BHD.
 
 

 

41. 6.3.1 KERTAS MESYUARAT. : 83/88/18/2025

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN PINDAAN KEPADA PELAN LULUS NO. RUJUKAN MBSJ.BGN.BP4.600 - 1/12 /5/22 BERTARIKH 13 DISEMBER 2023 BAGI

CADANGAN MEMBINA 4 BLOK PERDAGANGAN YANG MENGANDUNGI :
I) 49 UNIT KEDAI PEJABAT 1 1/2 TINGKAT (PT 3897 HINGGA PT 3945)
II) 1 UNIT PENCAWANG ELEKTRIK (DI SEBAHAGIAN PT3896)
DI JALAN METRO 1/1, BANDAR METRO PUCHONG, MUKIM PEKAN DESA PUCHONG, PETALING, SELANGOR DARUL EHSAN
6.3.2 GLOMAC ALLIANCE SDN. BHD..PDF
 
Oleh
UNTUK TETUAN GLOMAC ALLIANCE SDN. BHD.
 
 

 

42. 6.3.3 KERTAS MESYUARAT. : 84/88/18/2025

 
CADANGAN KELULUSAN PELAN LAMPU ISYARAT BAGI MEMBINA CADANGAN PEMBANGUNAN YANG MENGANDUNGI :
FASA 1 :
A) MENARA A 29 TINGKAT (725 UNIT) YANG MENGANDUNGI:
I) 580 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL (JENIS B) [800KP- 203 UNIT] DAN JENIS C (850KP - 377 UNIT) DI ARAS TANAH HIGGA TINGKAT 28
II) 145 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL MAMPU MILIK (JENIS A [600KP]) DI ARAS
II) 1 UNIT TANDAS LELAKI & PEREMPUAN, GYMNASIUM, BILIK YOGA, BILIK PERMAINAN DAN PEJABAT PENGURUSAN DI TINGKAT 1,
D) 1 UNIT GELANGGANG FUTSAL
E) 1 UNIT PONDOK PENGAWAL
F) 1 UNIT PONDOK SAMPAH
FASA 2
A) MENARA B 29 TINGKAT (725 UNIT) YANG MENGANDUNGI :
I) 580 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL (JENIS B ) [800KP-203 UNIT] DAN JENIS C [850KP-377 UNIT]) DI ARAS TANAH HINGGA 28
DI ATAS LOT PT 117118, TAMAN LESTARI PERDANA, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
6.3.3 UTUH ASPIRASI SDN. BHD..PDF
 
Oleh
UNTUK TETUAN: UTUH ASPIRASI SDN. BHD.
 
 

I. PEMBENTANGAN PERMOHONAN PELAN BANGUNAN

 

43. 7.1.1 KERTAS KERJA : 161/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN DI TINGKAT 13 HINGGA 18 PADA BANGUNAN PEJABAT MENARA B (23 TINGKAT) SEDIA ADA, DI BANGUNAN SUNWAY SQUARE CORPORATE TOWER 2, SUNWAY SQUARE, DI ATAS LOT 86704, JALAN LAGOON SELATAN, PJS 11, SUNWAY SOUTH QUAY, BANDAR SUNWAY, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-PB20250827-001
MBSJ.OSC.600-1/10 (BP1-2025/2020)
MBSJ.OSC.600-1/1654/PB
7.1.1 SHELL BUSINESS SERVICE CENTRE SDN. BHD
 
Oleh
UNTUK: SHELL BUSINESS SERVICE CENTRE SDN. BHD.
 
 

 

44. 7.1.2 KERTAS KERJA : 162/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN KE ATAS 1 UNIT RUANG PEJABAT SEDIADA DI ATAS LOT 014200, NO.2,WISMA CONSPLANT 1, UNIT W1104, LEVEL 11, WEST WING, JALAN SS16/4, 47500 SUBANG JAYA, SELANGOR DARUL EHSAN.

MBSJ-PB20250821-006
MBSJ.OSC.600-1/10 (BP1-2025/2021)
MBSJ.OSC.600-1/1655/PB
7.1.2 WINFAST LINES SDN BHD
 
Oleh
UNTUK TETUAN : WINFAST LINES SDN BHD
 
 

 

45. 7.1.3 KERTAS KERJA : 163/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAI KEPADA BANGUNAN KILANG DAN PEJABAT SEDIADA DI ATAS LOT 12 DAN 13, JALAN B/K 1/11, KINRARA INDUSTRIAL PARK, 47180, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN

MBSJ-PB20250827-002
MBSJ.OSC.600-1/10 (BP4-2025/2021)
MBSJ.OSC.600-1/1657/PB
7.1.3 HG SERVICES (M) SDN BHD
 
Oleh
UNTUK HG SERVICES (M) SDN BHD
 
 

 

46. 7.1.4 KERTAS KERJA : 164/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS 1 UNIT KILANG SESEBUAH 1 TINGKAT DENGAN PEJABAT 1 TINGKAT KEPADA PUSAT LATIHAN RENANG DI ATAS LOT .14, (GRN.131853), NO.7, JALAN BK 1/15, KAWASAN PERINDUSTRIAN BANDAR KINRARA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-PB20250903-004
MBSJ.OSC.600-1/10 (BP4-2025/2025)
MBSJ.OSC.600-1/1642/PB
7.1.4 LA SWIMMING CENTER SDN BHD (1046492-W)
 
Oleh
UNTUK : LA SWIMMING CENTER SDN BHD (1046492-W)
 
 

 

47. 7.1.5 KERTAS KERJA : 165/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT KEDAI PEJABAT 4 TINGKAT SEDIA ADA PADA TINGKAT BAWAH, TINGKAT SATU DAN TINGKAT DUA, DI ATAS PT 17355, NO. 7, JALAN KENARI 5, BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN

MBSJ-PB20250815-007
MBSJ.OSC.600-1/10 (BP4-2025/2026)
MBSJ.OSC.600-1/1666/PB
7.1.5 HSBC BANK MALAYSIA BERHAD
 
Oleh
UNTUK : HSBC BANK MALAYSIA BERHAD
 
 

 

48. 7.1.6 KERTAS KERJA : 166/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS KEDAI PEJABAT 4 TINGKAT YANG SEDIADA DI ATAS LOT PT 77634 & 77635, NO. 69 & 71 (TINGKAT G, 1, 2 & 3), JALAN PUTERI 2/3, BANDAR PUTERI PUCHONG, 47100 PUCHONG, SELANGOR DARUL EHSAN.

MBSJ-PB20250903-009
MBSJ.OSC.600-1/10 (BP5-2025/2028)
MBSJ.OSC.600-1/1667/PB
7.1.6 ORIENTAL COFFEE (PUCHONG) SDN BHD
 
Oleh
UNTUK: ORIENTAL COFFEE (PUCHONG) SDN BHD
 
 

 

49. 7.1.7 KERTAS KERJA : 167/89/18/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN KEPADA KEDAI PEJABAT SEDIADA 3 TINGKAT DI:
I) NO.20 (ARAS BAWAH, SATU DAN DUA)
II) NO. 21 (ARAS SATU)
DI ATAS PT 32406 DAN PT 32405, JALAN PUCHONG PERMAI 2, TAMAN PUCHONG PERMAI, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN


MBSJ-PB20250903-005
MBSJ.OSC.600-1/10 (BP5-2025/2029)
MBSJ.OSC.600-1/1668/PB
7.1.7 ECO-SHOP MARKETING BERHAD.
 
Oleh
UNTUK: ECO-SHOP MARKETING BERHAD
 
 

 

50. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
CADANGAN PINDAAN KEPADA PELAN LULUS NO. RUJUKAN MBSJ.BGN.BP4.600-1/12/5/22 BERTARIKH 13 DISEMBER 2023 BAGI :

CADANGAN MEMBINA 4 BLOK PERDAGANGAN YANG MENGANDUNGI :
I) 49 UNIT KEDAI PEJABAT 1 1/2 TINGKAT (PT 3897 HINGGA PT 3945)
II) 1 UNIT PENCAWANG ELEKTRIK (DISEBAHAGIAN PT 3896)

DI JALAN METRO 1/1, BANDAR METRO PUCHONG,
MUKIM PEKAN DESA PUCHONG, PETALING,
SELANGOR DARUL EHSAN

UNTUK GLOMAC ALLIANCE SDN. BHD.

( TAMBAHAN PENCAWANG ELEKTRIK )
 
Oleh
WAN AHMAD TERMIZI BIN HAJI ABDUL AZIZ
 
 

 

51. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN PELAN BANGUNAN BAGI
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI HARGA BEBAS 39 TINGKAT (1,336 UNIT) YANG MENGANDUNGI:
A.MENARA A - 37 TINGKAT PANGSAPURI HARGA BEBAS (668 UNIT) DI TINGKAT 2 HINGGA TINGKAT 38.
B.MENARA B - 37 TINGKAT PANGSAPURI HARGA BEBAS (668 UNIT) DI TINGKAT 2 HINGGA TINGKAT 38.
C.1 TINGKAT KEMUDAHAN PENDUDUK DAN RUANG WARGA EMAS DI SEBAHAGIAN TINGKAT 38.
D.1 TINGKAT TANGKI AIR DAN SKY DEK DI TINGKAT 39.
E.7 TINGKAT PODIUM YANG MENGANDUNGI:
I.6 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 1 HINGGA TINGKAT 6.
II.1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI GIMNASIUM, KOLAM RENANG DEWASA, KOLAM RENANG KANAK-KANAK, TAMAN PERMAINAN, DEWAN SERBAGUNA DAN BILIK SERBAGUNA DI SEBAHAGIAN TINGKAT 7.
III.1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI TADIKA, TASKA, BILIK MEDITASI, PEJABAT PENGURUSAN,DOBI,KEDAI,BILIK SERBAGUNA DAN BILIK PETI SURAT DI TINGKAT 1.
F.1 TINGKAT BANGUNAN KEMUDAHAN PENDUDUK YANG MENGANDUNGI SURAU (LELAKI DAN PEREMPUAN), BILIK PENGURUSAN JENAZAH, DEWAN SUKAN DAN TANDAS (LELAKI DAN PEREMPUAN) DI TINGKAT 1.
G.3 TINGKAT SUB BESMEN YANG MENGANDUNGI TEMPAT LETAK KERETA DAN UTILITI DARI SUB BESMEN 1 HINGGA SUB BESMEN 3.
H. 2 UNIT PONDOK PENGAWAL.

DI ATAS LOT 79670 (PN 115547), SELUAS 5.762 EKAR, PERSIARAN WAWASAN, PUSAT BANDAR PUCHONG, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK: MATRIX CONCEPTS (CENTRAL) SDN. BHD. (404543-A)
 
Oleh
WANG HON CHOON
 
 

 

52. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DINDING SEKATAN (PARTITION) SEDIA ADA DI UNIT G1.103 ARAS BAWAH, BANGUNAN SUNWAY PYRAMID, DI ATAS SEBAHAGIAN LOT 51175, LOT 32, LOT PT 1312 & LOT PT 391, JALAN PJS 11/15, BANDAR SUNWAY, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK PUMA SPORTS GOODS SDN. BHD.
 
Oleh
ABD RAZAK ABDULLAH
 
 

 

53. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KEPADA LOT 9F-1 , TINGKAT 9, MENARA 1, PUSAT PERDAGANGAN PUCHONG (PFCC) SEDIADA DI ATAS LOT 112580 (LOT LAMA : SEBAHAGIAN LOT 5452 & 5454), JALAN PUTERI 1/2, BANDAR PUTERI, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK : A&I MIRACLE PROPERTY SDN.BHD
 
Oleh
CHENG BOON HIN
 
 

 

54. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN BANGUNAN KE ATAS 1 UNIT KEDAI PEJABAT 3 TINGKAT SEDIA ADA DI ATAS PT 19136, NO. 1, 1-1 & 1-2, JALAN SB INDAH1/2A, TAMAN SUNGAI BESI INDAH, SERI KEMBANGAN, DAERAH PETALING, MUKIM PETALING, SELANGOR DARUL EHSAN
UNTUK TETUAN MR D.I.Y. SDN BHD.
 
Oleh
MOHD MANSUR SYAH BIN ABD HASHIM
 
 

 

55. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
CADANGAN PINDAAN KEPADA PELAN LULUS NO RUJUKAN MBSJ.BGN.BP4.600-1/10/4/34 BERTARIKH 24 JANUARI 2025 BAGI
CADANGAN PEMBANGUNAN 91 UNIT RUMAH TERES 2 TINGKAT HINGGA 3 TINGKAT (20- X 70-) FASA 4 (FASA 1B) YANG MENGANDUNGI :
1. 57 UNIT RUMAH TERES 3 TINGKAT (20- X 70-) DI ATAS LOT 64580 HINGGA LOT 64636
2. 34 UNIT RUMAH TERES 2 TINGKAT (20- X 70-) DI ATAS LOT 64637 HINGGA LOT 64670
JALAN PUCHONG LEGENDA, TAMAN PUCHONG LEGENDA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK: HUGES DEVELOPMENT SDN BHD.
KEPADA
CADANGAN PEMBANGUNAN 91 UNIT RUMAH TERES 2 TINGKAT (20- X 70-) FASA 4 (FASA 1B) DI ATAS LOT 64580 HINGGA LOT 64670, JALAN PUCHONG LEGENDA, TAMAN PUCHONG LEGENDA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK: HUGES DEVELOPMENT SDN BHD.
 
Oleh
NG WAI KEONG
 
 

J. PEMBENTANGAN PERMOHONAN PELAN LANDSKAP

 

56. 8.1 KERTAS KERJA : 11/90/18/2025

 
CADANGAN LANDSKAP BAGI CADANGAN PEMBANGUNAN PERNIAGAAN YANG TERDIRI DARIPADA:-
A) 1 MENARA PANGSAPURI PERKHIDMATAN PERNIAGAAN 30 TINGKAT (299 UNIT) DI ARAS 8 - ARAS 37.
B) 1 MENARA PANGSAPURI PERKHIDMATAN PERNIAGAAN 30 TINGKAT (299 UNIT) DI ARAS 8 - ARAS 37.
C) PODIUM TEMPAT LETAK KENDERAAN 7 TINGKAT :-
I) 6 TINGKAT TEMPAT LETAK KERETA DI ARAS 2 - ARAS 7 DENGAN 26 UNIT PEJABAT 1 TINGKAT DI ARAS 2 DAN ARAS 3.
II) 1 TINGKAT TEMPAT LETAK KERETA DENGAN 13 UNIT KEDAI 1 TINGKAT BERSERTA MEZZANINE DI ARAS 1.
D)

DI ATAS PT 82739, SELUAS 3.26 EKAR, JALAN PUTERI 2/7, BANDAR PUTERI, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
8.1 FLORA DEVELOPMENT SDN BHD
 
Oleh
UNTUK TETUAN FLORA DEVELOPMENT SDN BHD.
 
 

 

57. 8.2 KERTAS KERJA : 12/90/18/2025

 
CADANGAN KELULUSAN PELAN LANDSKAP BAGI CADANGAN
REJUVENASI DAN PENAMBAHBAIKAN JALAN DI PUSAT
PERNIAGAAN JALAN KENARI ,BANDAR PUCHONG JAYA, PUCHONG,
MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
8.2 PILIHAN MEGAH SDN.BHD
 
Oleh
UNTUK: PILIHAN MEGAH SDN.BHD (195631-P)
 
 

K. HAL-HAL LAIN

 

58. HAL-HAL LAIN- 5.13 KERTAS KERJA BIL. : 261/87/18/2025

 
PERMOHONAN BAGI PELAKSANAAN SKIM PERUMAHAN BERPENGAWAL (GUARDED COMMUNITY) DI KAWASAN PERUMAHAN KINGSLEY HILLS, PUTRA HEIGHTS, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

(PPM-027-10-18102016)
(MBSJ.JPB.BP3.600-1/13/16)
- PERMOHONAN MEMPERBAHARUI KALI KE-2
 
Oleh
UNTUK : PERSATUAN PENDUDUK DAN PEMILIK KINGSLEY HILLS PUTRA HEIGHTS, SUBANG JAYA
 
 

 

59. 5.3 KERTAS KERJA BIL. : 251/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERINDUSTRIAN (INDUSTRI SESEBUAH) KEPADA RUMAH IBADAT (GEREJA) DI ATAS PT 9451, DI ALAMAT NO. 5, JALAN SS 13/3C, SS 13, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

(832485-M) (MBSJ.JPB.BP1.600-1/4/169 JLD. 2)
(MBSJ.OSC.600-1/1661/KM4)
- PERMOHONAN MEMPERBAHARUI KEBENARAN MERANCANG KALI KEEMPAT
 
Oleh
UNTUK : UPWARD PRAISE SDN. BHD.
 
 

 

60. 5.7 KERTAS KERJA BIL. : 255/87/18/2025

 
PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBANGUNAN PANGSAPURI HARGA BEBAS 37 TINGKAT (2,476 UNIT) YANG MENGANDUNGI :
1. FASA 1
A. MENARA A – 37 TINGKAT PANGSAPURI HARGA BEBAS 1,380 UNIT DARI TINGKAT 9 HINGGA TINGKAT 45;
B. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI KEBUK SAMPAH, BILIK PETI SURAT, PONDOK PENGAWAL DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 1;
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI BILIK PETI SURAT, PEJABAT PENGURUSAN, TAMAN PERMAINAN, GELANGGANG SUKAN, TADIKA, RUANG MEDITASI, RUANG WARGA EMAS, SURAU (LELAKI DAN PEREMPUAN), BILIK PENGURUSAN JENAZAH DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 2;
D. 6 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 3 HINGGA TINGKAT 8;
E. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI GELANGGANG SUKAN DAN KOLAM RENANG DI TINGKAT 9;
2. FASA 2
A. MENARA C- 26 TINGKAT PANGSAPURI HARGA BEBEAS 416 UNIT DARI TINGKAT 9 HINGGA TINGKAT 34;
B. 3 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 6 HINGGA TINGKAT 8;
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI KOLAM SPA DI TINGKAT 9;
3. FASA 3
A. MENARA B- 37 TINGKAT PANGSAPURI HARGA BEBAS 680 UNIT DARI TINGKAT 5 HINGGA TINGKAT 8;
B. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI DEWAN SERBAGUNA, GIMNASIUM DAN KOLAM RENANG DI TINGKAT 9
DI ATAS LOT 65797 SELUAS 8.707 EKAR, JALAN BUKIT JALIL INDAH, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
- JUMLAH NILAIAN CAJ PEMAJUAN BERJUMLAH RM4,605,600.00

(MPSJ.JPB.BP4.600-1/1/75)
(MBSJ-KM20250729-003)
 
Oleh
UNTUK : PACIFIC GREENVIEW SDN. BHD. (1462088-K)
 
 

 

61. PENGECUALIAN PELAN KERJA TANAH

 
6.4.1 ENCIK JAMALUDDIN BIN MADASAH
 
Oleh
6.4.1 ENCIK JAMALUDDIN BIN MADASAH
 
 

 

62. PERMOHONAN PENGECUALIAN PELAN KERJA TANAH

 
6.4.2 SAMHARRIS DEVELOPMENT SDN BHD
 
Oleh
SAMHARRIS DEVELOPMENT SDN BHD
 
 

 

63. PENGECUALIAN PELAN KERJA TANAH

 
6.4.3 ENCIK WILLIAM ONG ENG SAN
 
Oleh
ENCIK WILLIAM ONG ENG SAN
 
 

 

64. PENGECUALIAN PELAN KERJA TANAH

 
6.4.4. SEOW PONG CHEE & SEOW DING YI
 
Oleh
SEOW PONG CHEE & SEOW DING YI
 
 

 

65. PENGECUALIAN PELAN KERJA TANAH

 
6.4.5. CHEONG CHENG WAH DAN LEE SOO SAM
 
Oleh
CHEONG CHENG WAH DAN LEE SOO SAM
 
 

 

66. PERMOHONAN PENGURANGAN BAYARAN CARUMAN KUMPULAN WANG PERKHIDMATAN KEMAJUAN (ISF) (RAYUAN KALI KE-2)

 
6.6.1 PILIHAN MEGAH SDN. BHD. (195631-P)
- PERMOHONAN PENGURANGAN BAYARAN CARUMAN KUMPULAN WANG PERKHIDMATAN KEMAJUAN (ISF) (RAYUAN KALI KE-2)
(RUJUKAN FAIL : MPSJ.KEJ.600-1/19/117)
 
Oleh
PILIHAN MEGAH SDN. BHD
 
 

 

67. - RAYUAN BAYARAN CARUMAN KUMPULAN WANG PERKHIDMATAN KEMAJUAN (ISF) SECARA ANSURAN / BERKALA

 
6.6.2 PACIFIC GREENVIEW SDN BHD
- RAYUAN BAYARAN CARUMAN KUMPULAN WANG PERKHIDMATAN KEMAJUAN (ISF) SECARA ANSURAN / BERKALA
(RUJUKAN FAIL : MPSJ.KEJ.600-1/19/121)
 
Oleh
PACIFIC GREENVIEW SDN BHD
 
 

 

68. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN KEPADA TASKA DI ATAS LOT 20237, DI ALAMAT NO. 1, JALAN USJ 2/2N, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP1.600-1/4/157 JLD. 2)
(MBSJ.OSC.600-1/1629/KM4)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : TASKA ADALAFF (SA0359359-U)
 
 

 

69. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL BANGUNAN DARIPADA PERUMAHAN KEPADA TADIKA DI ALAMAT NO. 1, JALAN INDAH 3/6, TAMAN PUCHONG INDAH, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP5.600-1/4/243)
(MBSJ.OSC.600-1/1620/KM4)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : TADIKA UNIVERSAL PINTAR (003570793 – K)
 
 

 

70. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 17/2025 PADA 03 SEPTEMBER 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN SESEBUAH KEPADA PUSAT JAGAAN ORANG TUA DI ALAMAT NO. 607-B, JALAN AMAN, KAMPUNG BARU SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP7.600-1/4/147)
(MBSJ.OSC.600-1/1614/KM4(BP7-2025/0935)
 
Oleh
UNTUK : DRSM SINCERE SERVICES SDN BHD (1099070-D)
 
 

 

71. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 19/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KEDIAMAN KEPADA TASKA DI ALAMAT NO. 40, JALAN PUJ 7/16, TAMAN PUNCAK JALIL, BANDAR PUTRA PERMAI, 43300 SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP6.600-1/4/15 JLD. 3)
(MBSJ.OSC.600-1/161/1611/KM4)
 
Oleh
UNTUK : TASKA WIDAD (SA02030721 – D)
 
 

 

72. 8.3 HAL-HAL LAIN

 
MEMOHON PENUKARAN TAJUK PROJEK PADA PELAN LANDSKAP YANG TELAH DILULUSKAN NO RUJ.MBSJ.JL.600-1/22/121( ) PADA 10 MARCH 2021 MENGIKUT SEPERTI TAJUK PELAN BANGUNAN (MBSJ.BGN.BP7.600-1/10/4/32 JILID2(18) YANG DILULUSKAN PADA 17 APRIL 2025 SEPERTI BERIKUT : TAJUK BARU
CADANGAN PINDAAN PELAN LANDSKAP YANG TELAH DILULUSKAN NO RUJ.MBSJ.JL.600-1/22/310 PADA 10 MARCH 2021 BAGI CADANGAN PEMBANGUNAN YANG MENGANDUNGI:
FASA 1:
A) MENARA A 29 TINGKAT (725 UNIT) YANG MENGANDUNGI;
I) 580 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL (JENIS B [800KP-203 UNIT] DAN JENIS C [850KP-377 UNIT]) DI ARAS TANAH HINGGA TINGKAT 28,
II) 145 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL MAMPU MILIK (JENIS A [600KP]) DI ARAS TANAH HINGGA TINGKAT 28;
B) 10 TINGKAT TEMPAT LETAK KERETA BERTINGKAT BERTINGKAT YANG MENGANDUNGI;
I) 10 TINGKAT TEMPAT LETAK KERETA BERTINGKAT DI ARAS TANAH HINGGA TINGKAT 9,
II) II) 1 UNIT TADIKA & TASKA, TANDAS LELAKI & PEREMPUAN, BILIK SURAT,
III) DAN KEDAI DI ARAS TANAH,
IV) III) 4 UNIT PENCAWANG ELEKTRIK DUA RUANG DI ARAS TANAH;
C) 1 UNIT RUMAH KELAB 2 TINGKAT YANG MENGANDUNGI;
I) 1 UNIT KOLAM RENANG, TANDAS LELAKI & PEREMPUAN, SURAU, DAN
MBSJ 23 SEPTEMBER 2025
II) DEWAN SERBAGUNA DI ARAS TANAH,
III) II) 1 UNIT TANDAS LELAKI & PEREMPUAN, GIMNASIUM, BILIK YOGA, BILIK
IV) PERMAINAN, DAN
V) PEJABAT PERNGURUSAN DI TINGKAT 1;
D) 1 UNIT GELANGGANG FUTSAL;
E) 1 UNIT PONDOK PENGAWAL;
F) 1 UNIT KEBUK SAMPAH;
DI ATAS LOT 117118, TAMAN LESTARI PERDANA, BANDAR PUTRA PERMAI, MUKIM PETALING,DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN : UTUH ASPIRASI SDN. BHD
 
 

 

73. 8.4 HAL-HAL LAIN

 
MEMOHON PENUKARAN TAJUK PROJEK PADA PELAN LANDSKAP YANG TELAH DILULUSKAN NO RUJ.MBSJ.JL.600-1/22/120( ) PADA 10 MARCH 2021 MENGIKUT SEPERTI TAJUK PELAN BANGUNAN (MBSJ.BGN.BP7.600-1/10/4/33 JILID2(17) YANG DILULUSKAN PADA 24 APRIL 2025 SEPERTI BERIKUT : TAJUK BARU
CADANGAN PINDAAN PELAN LANDSKAP YANG TELAH DILULUSKAN NO RUJ.MBSJ.JL.600-1/22/120 PADA 10 MARCH 2021 BAGI CADANGAN PEMBANGUNAN YANG MENGANDUNGI:
FASA 2:
A) MENARA B 29 TINGKAT (725 UNIT) YANG MENGANDUNGI:
I) 580 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL (JENIS B [800KP- 203 UNIT] DAN JENIS C [850KP-377 UNIT]) DI ARAS TANAH HINGGA TINGKAT 28,
II) 145 UNIT PANGSAPURI PERKHIDMATAN KOMERSIAL MAMPU MILIK (JENIS A [600KP]) DI ARAS TANAH HINGGA TINGKAT 28;
B) 1 UNIT GELANGGANG TAKRAW;
C) 1 UNIT GELANGGANG BOLA KERANJANG (HALF COURT)
DI ATAS LOT 117118, TAMAN LESTARRI PERDANA, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN : UTUH ASPIRASI SDN. BHD.