Loading...

Mesyuarat Jawatankuasa OSC

Majlis Bandaraya Iskandar Puteri


Mesyuarat Jawatankuasa OSC, Majlis Bandaraya Iskandar Puteri

 

TAJUK MESYUARAT

:

MESYUARAT JAWATAN KUASA PUSAT SEHENTI BIL 01/2023 (1)

TARIKH

:

9 JANUARI 2023 (ISNIN)

MASA

:

2:30 PM

TEMPAT

:

BILIK MESYUARAT TOPEZ, ARAS 2, MBIP MEDINI

PENGERUSI

:

YB DATO' HAJI MOHD HAFFIZ BIN HAJI AHMAD, DATUK BANDAR MBIP

 

AGENDA MESYUARAT

 

1

PERUTUSAN PENGERUSI MESYUARAT OSC

2

PENGESAHAN MINIT MESYUARAT MESYUARAT JAWATAN KUASA PUSAT SEHENTI BIL 12/2022(2) PADA 22-12-2022

3

PERKARA-PERKARA BERBANGKIT

4

PEMBENTANGAN PERMOHONAN PEMAJUAN KELULUSAN

5

PEMBENTANGAN DAN PERTIMBANGAN KERTAS DASAR

6

PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN

7

PEMBENTANGAN KERTAS PEMAKLUMAN

8

PEMBENTANGAN STATUS DAN ISU PEMANTAUAN TAPAK

9

HAL-HAL LAIN BERKAITAN PERMOHONAN I

10

HAL-HAL LAIN BERKAITAN PERMOHONAN II

11

HAL-HAL LAIN

 

Kertas Pembentangan

A. PERKARA-PERKARA BERBANGKIT

 
SLIDE PELAPORAN OSC_PERKARA BERBANGKIT
 
 

B. PEMBENTANGAN LAPORAN PELAN-PELAN PEMAJUAN

 
SLIDE PELAPORAN OSC_FI PEMBANGUNAN
 
 

C. PEMBENTANGAN DAN PERTIMBANGAN KERTAS DASAR

 
 
 

D. PEMBENTANGAN PERMOHONAN SERENTAK

 

1. KERTAS MESYUARAT

 
CADANGAN PENYEDIAAN KEMUDAHAN AKTIVITI PEMBANGUNAN BELIA DI TAMAN BELIA WILAYAH, ISKANDAR MALAYSIA YANG MENGANDUNGI: I. PUSAT BELIA YANG MELIBATKAN: A. 1 BLOK PEJABAT PENTADBIRAN BELIA - 1 TINGKAT B. 1 BLOK PUSAT AKTIVITI BELIA (BLOK 1) - 1 TINGKAT C. 1 BLOK KEMUDAHAN - 1 TINGKAT D. 1 BLOK PUSAT AKTIVITI BELIA (BLOK 2) - 1 TINGKAT BERSERTA ARAS TERES TERBUKA E. 1 BLOK PUSAT AKTIVITI BELIA (BLOK 3) - 1 TINGKAT BERSERTA ARAS TERES TERBUKA II. BLOK KEMUDAHAN YANG MELIBATKAN: A. 1 BLOK RESTORAN - 1 TINGKAT B. 1 BLOK RUANG SERBAGUNA - 3 UNIT RUANG BERSERTA KEMUDAHAN 1 TINGKAT C. 1 BLOK MENARA IKONIK BELIA - 5 TINGKAT III. 1 BLOK PUSAT KECERGASAN - GIMNASIUM RAKYAT 1 TINGKAT BERSERTA ARAS TERES TERBUKA IV. 3 UNIT RUMAH SAMPAH BERSERTA RUANG KITAR SEMULA V. 3 UNIT PENCAWANG PADAT (COMPACT SUB) DI ATAS SEBAHAGIAN PTD 215477, ISKANDAR PUTERI, MUKIM PULAI, JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK PIHAK BERKUASA WILAYAH PEMBANGUNAN ISKANDAR (IRDA).
SLIDE SERENTAK_K1_PIHAK BERKUASA WILAYAH PEMBANGUNAN ISKANDAR (IRDA)
 
 

 

2. KERTAS MESYUARAT

 
CADANGAN MEMBINA SEBUAH RUMAH IBADAT BUKAN ISLAM YANG MENGANDUNGI:
I) 1 BLOK TOKONG 1 TINGKAT
II) 1 BLOK PEMBELAJARAN DAN PEJABAT 2 TINGKAT
III) 1 UNIT KEBUK SAMPAH BERSERTA RUANG KITAR SEMULA
IV) 1 UNIT PONDOK PENGAWAL
DI ATAS PTD 195072, JALAN PERSIARAN BARAT, HORIZON HILL, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK PERSATUAN PENGANUT DEWA LIAN HUA TANG JOHOR BAHRU, JOHOR
SLIDE SERENTAK_K2_PERSATUAN PENGANUT DEWA LIAN HUA TANG
 
Oleh
CHAN WAI LAI
 
 

 

3. KERTAS MESYUARAT

 
CADANGAN MEMBINA 3 UNIT KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI : LOT 150579 I. 1 UNIT KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT (JENIS D2) II. 1 UNIT PENCAWANG ELEKTRIK (SATU RUANG) III. 1 UNIT PONDOK PENGAWAL BERSERTA RUMAH SAMPAH LOT 150580 I. 1 UNIT KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT (JENIS D3) II. 1 UNIT PONDOK PENGAWAL BERSERTA RUMAH SAMPAH PTD 182005 I. 1 UNIT KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT (JENIS D4) II. 1 UNIT PONDOK PENGAWAL BERSERTA RUMAH SAMPAH LOT 150581 I. 1 UNIT PENCAWANG ELEKTRIK DUA RUANG PINDAAN YANG MELIBATKAN : LOT 150579 I. 1 UNIT KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT (JENIS D2) II. 1 UNIT PENCAWANG ELEKTRIK (SATU RUANG) III. 1 UNIT PONDOK PENGAWAL BERSERTA RUMAH SAMPAH LOT 150580 I. 1 UNIT KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT (JENIS D3) II. 1 UNIT PONDOK PENGAWAL BERSERTA RUMAH SAMPAH PTD 182005 I. 1 UNIT KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT (JENIS D4) II. 1 UNIT PONDOK PENGAWAL BERSERTA RUMAH SAMPAH JALAN MEGA 1/10, TAMAN PERINDUSTRIAN NUSA CEMERLANG, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM. UNTUK PANORAMIC LAND SDN. BHD
SLIDE SERENTAK_K3_PANORAMIC LAND SDN. BHD.
 
Oleh
IR. LEE KING FOOK
 
 

 

4. KERTAS MESYUARAT

 
CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS LOT 632 – LOT 637, LOT 642 – LOT 646, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK OYBINA SDN. BHD.
SLIDE SERENTAK_K4_OYBINA SDN. BHD.
 
Oleh
LEE SONG FATT
 
 

E. PEMBENTANGAN PERMOHONAN KEBENARAN MERANCANG

 

5. KERTAS MESYUARAT

 
PERMOHONAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21, AKTA PERANCANGAN BANDAR DAN DESA 1976 (AKTA 172) BAGI CADANGAN PINDAAN SUSUNATUR LOJI RAWATAN KUMBAHAN DI ATAS PTD 219486 DAN PTD 219508 DI MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK BEST PRIMAX SDN. BHD.
SLIDE KM_K1_BEST PRIMAX SDN. BHD.
 
Oleh
GOH LEI LEI
 
 

 

6. KERTAS MESYUARAT

 
PERMOHONAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21, AKTA PERANCANGAN BANDAR DAN DESA 1976 (AKTA 172)
BAGI TUJUAN PINDAAN SUSUNATUR YANG MELIBATKAN TAMBAHAN 2 UNIT PENCAWANG PADAT DAN
PINDAAN 1 UNIT PENCAWANG PADAT DI ATAS JALAN SUTERA TANJUNG 8/4,TAMAN SUTERA UTAMA,
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK TANAH SUTERA DEVELOPMENT SDN. BHD.
[PINDAAN KE ATAS PELAN LULUS NO.FAIL:MDJBT(PL)22/90]
SLIDE KM_K2_TANAH SUTERA DEVELOPMENT SDN. BHD.
 
Oleh
RAHANI BINTI JUSOH
 
 

F. PEMBENTANGAN PERMOHONAN PELAN LAMPU JALAN

 

7. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU TAMAN BAGI CADANGAN PEMBANGUNAN PERUMAHAN 118 UNIT RUMAH TERES 2 TINGKAT YANG MENGANDUNGI: -
I. 60 UNIT RUMAH TERES 2 TINGKAT (24' X 80') - JENIS A DI ATAS PTD 197333, LOT
127948 - 127960, LOT 128003 - 128018, PTD 197335, LOT 127990 - 128002 DAN LOT 128049 - 128064
II. 58 UNIT RUMAH TERES 2 TINGKAT (24'X 80') - JENIS B DI ATAS LOT 127961 - 127974, LOT 128019 - 128033, LOT 127975 - 127988 DAN LOT 128034 – 128048
III. 1 UNIT PENCAWANG ELEKTRIK JENIS “DOUBLE CHAMBER” DI ATAS PTD 197336
FASA 10D1, TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
UNTUK GUNUNG IMPIAN DEVELOPMENT SDN BHD (COMPANY NO: 211440-A)
SLIDE M&E_K1_LT_GUNUNG IMPIAN DEVELOPMENT SDN BHD_FASA 10D1
 
Oleh
ABU BAKAR BIN OMAR
 
 

 

8. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN PEMBANGUNAN PERUMAHAN 118 UNIT RUMAH TERES 2 TINGKAT YANG MENGANDUNGI: -
I. 60 UNIT RUMAH TERES 2 TINGKAT (24' X 80') - JENIS A DI ATAS PTD 197333, LOT
127948 - 127960, LOT 128003 - 128018, PTD 197335, LOT 127990 - 128002 DAN LOT 128049 - 128064
II. 58 UNIT RUMAH TERES 2 TINGKAT (24'X 80') - JENIS B DI ATAS LOT 127961 - 127974, LOT 128019 - 128033, LOT 127975 - 127988 DAN LOT 128034 – 128048
III. 1 UNIT PENCAWANG ELEKTRIK JENIS “DOUBLE CHAMBER” DI ATAS PTD 197336
FASA 10D1, TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
UNTUK GUNUNG IMPIAN DEVELOPMENT SDN BHD (COMPANY NO: 211440-A)
SLIDE M&E_K2_LJ_GUNUNG IMPIAN DEVELOPMENT SDN BHD_118 UNIT
 
Oleh
ABU BAKAR BIN OMAR
 
 

 

9. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN PEMBINAAN YANG MENGANDUNGI:-
I. 42 UNIT RUMAH BERKEMBAR 2 TINGKAT (45A?? X 90A??) DI ATAS LOT 174088 A?? LOT 174099, LOT 174112 A?? LOT 174123 DAN LOT 174136 A?? LOT 174153
ZON 6E4, TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK GUNUNG IMPIAN DEVELOPMENT SDN BHD
SLIDE M&E_K3_GUNUNG IMPIAN DEVELOPMENT SDN BHD_42 UNIT
 
Oleh
MOHAN A/L SAMBANTHA MOORTHY
 
 

 

10. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN FASA 1B - PEMBANGUNAN 215 UNIT RUMAH TERES 2 TINGKAT YANG MENGANDUNGI:
I. 215 UNIT RUMAH TERES 2 TINGKAT (22' X 70') DI ATAS PTD 218317 - PTD 218357, PTD 218408 - PTD 218444, PTD 218445 - PTD 218481, PTD 218531 - PTD 218567, PTD 218568 - PTD 218604, PTD 218654 - PTD 218666 DAN PTD 218667 - PTD 218679
II. 1 UNIT PENCAWANG ELEKTRIK “DOUBLE CHAMBER” DI ATAS PTD 219475
DI TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK BEST PRIMAX SDN. BHD.
SLIDE M&E_K4_BEST PRIMAX SDN.BHD_215 UNIT
 
Oleh
LIM MENG WAH
 
 

 

11. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN FASA 1D - PEMBANGUNAN 72 UNIT KEDAI PEJABAT 2 & 3 TINGKAT YANG MENGANDUNGI:
I. 70 UNIT KEDAI PEJABAT 2 TINGKAT (24' X 75') DI ATAS PTD 218198 - PTD 218232, PTD 218315 – PTD 218281.
II. 2 UNIT KEDAI PEJABAT 3 TINGKAT (24' X 75') DI ATAS PTD 218197 DAN PTD 218316.
III. 2 UNIT PENCAWANG ELEKTRIK “DOUBLE CHAMBER” DI ATAS PTD 219473 DAN PTD 219474.
DI TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK BEST PRIMAX SDN. BHD.
SLIDE M&E_K5_BEST PRIMAX SDN.BHD_72 UNIT
 
Oleh
LIM MENG WAH
 
 

 

12. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KE ATAS PELAN LULUS LAMPU JALAN NO RUJ : MBIP(E4)OSC/42/6/2019 (M&E-PB)(ME/LJ)9/33-06/2019 BERTARIKH 28 JULAI 2019 BAGI CADANGAN MENDIRIKAN 96 UNIT RUMAH MAMPU MILIK JOHOR BERSTRATA JENIS TOWNHOUSE (20’ X 75’) DI ATAS PTD 209763 - PTD 209810, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK NUSA UTAMA SDN BHD
SLIDE M&E_K6_NUSA UTAMA SDN. BHD.
 
Oleh
TEO YUAN HWA
 
 

G. PEMBENTANGAN PERMOHONAN PELAN BANGUNAN

 

13. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70,
AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133)
BAGI CADANGAN MENDIRIKAN SEBUAH BANGLO 3 TINGKAT
DI ATAS LOT 125554 ( PTD 106579 ),
JALAN SERI IMPIAN 18, TAMAN IMPIAN EMAS,
MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM.

UNTUK CHIAM THARD SHYANN & HENG WEI PEI
SLIDE PB_K1_CHIAM THARD SHYANN & HENG WEI PEI
 
Oleh
RUSLAN BIN RAZAK
 
 

 

14. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN PEMBANGUNAN PERUMAHAN 118 UNIT RUMAH TERES 2 TINGKAT YANG MENGANDUNGI:-

I) 60 UNIT RUMAH TERES 2 TINGKAT (24' X 80') - JENIS A DI ATAS PTD 197333, LOT 127948 - 127960, LOT 128003 - 128018, PTD 197335, LOT 127990 - 128002 DAN LOT 128049 - 128064
II) 58 UNIT RUMAH TERES 2 TINGKAT (24'X 80') - JENIS B DI ATAS LOT 127961 - 127974, LOT 128019 - 128033, LOT 127975 - 127988 DAN LOT 128034 – 128048
III) 1 UNIT PENCAWANG ELEKTRIK JENIS “DOUBLE CHAMBER” DI ATAS PTD 197336

FASA 10D1, TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
UNTUK GUNUNG IMPIAN DEVELOPMENT SDN BHD
SLIDE PB_K2_GUNUNG IMPIAN DEVELOPMENT SDN. BHD.
 
Oleh
KOH FOOK HAI
 
 

 

15. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN PEMBINAAN YANG MENGANDUNGI:
42 UNIT RUMAH BERKEMBAR 2 TINGKAT (45' X 90') DI ATAS LOT 174088 - LOT 174099, LOT 174112 - LOT 174123 DAN LOT 174136 - LOT 174153

ZON 6E4 TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
UNTUK: GUNUNG IMPIAN DEVELOPMENT SDN. BHD.
SLIDE PB_K3_GUNUNG IMPIAN DEVELOPMENT SDN. BHD.
 
Oleh
TAN CHOON KIAT
 
 

 

16. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN FASA 1B - PEMBANGUNAN 215 UNIT RUMAH TERES 2 TINGKAT YANG MENGANDUNGI:
I) 215 UNIT RUMAH TERES 2 TINGKAT (22' X 70') DI ATAS PTD 218317 - PTD 218357, PTD 218408 - PTD 218444, PTD 218445 - PTD 218481, PTD 218531 - PTD 218567, PTD 218568 - PTD 218604, PTD 218654 - PTD 218666 DAN PTD 218667 - PTD 218679
II) 1 UNIT PENCAWANG ELEKTRIK “DOUBLE CHAMBER” DI ATAS PTD 219475
DI TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK BEST PRIMAX SDN. BHD.
SLIDE PB_K4_BEST PRIMAX SDN. BHD - 215 UNIT
 
Oleh
CHIAM KIM CHYE
 
 

 

17. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN FASA 1D - PEMBANGUNAN 72 UNIT KEDAI PEJABAT 2 & 3 TINGKAT YANG MENGANDUNGI:
I) 70 UNIT KEDAI PEJABAT 2 TINGKAT (24' X 75') DI ATAS PTD 218198 - PTD 218232 & PTD 218315-PTD 218281
II) 2 UNIT KEDAI PEJABAT 3 TINGKAT (24' X 75') DI ATAS PTD 218197 DAN PTD 218316.
III) 2 UNIT PENCAWANG ELEKTRIK “DOUBLE CHAMBER” DI ATAS PTD 219473 DAN PTD 219474.
DI TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK BEST PRIMAX SDN. BHD.
SLIDE PB_K5_BEST PRIMAX SDN. BHD - 72 UNIT
 
Oleh
CHIAM KIM CHYE
 
 

 

18. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN MEMBINA SEBUAH RUMAH BANGLO DUA TINGKAT DI ATAS PTD 199792, JALAN BUNGA MELUR, KG. MAJU JAYA, MUKIM TEBRAU, DAERAH JOHOR BAHRU, 81300 JOHOR BAHRU, JOHOR DARUL TA'ZIM.
NURRUL HIJAZI BIN MISBAH & SITI ABEIDA BINTI GHAZALI
SLIDE PB_K6_NURRUL HIJAZI BIN MISBAH & SITI ABEIDA BINTI GHAZALI
 
Oleh
JAAFAR BIN MOHAMED
 
 

 

19. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN MENDIRIKAN 24 UNIT KEDAI PEJABAT 2 TINGKAT DI ATAS LOT 165033 - LOT 165056, FASA 6C, TAMAN MUTIARA UTAMA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
UNTUK NUSA UTAMA SDN BHD
SLIDE PB_K7_NUSA UTAMA SDN BHD
 
Oleh
YAP YEW PENG
 
 

 

20. KERTAS MESYUARAT

 
PERMOHONAN PELAN BANGUNAN MENGIKUT SEKSYEN 70, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN MEMBINA SEBUAH RUMAH BANGLO DUA TINGKAT JENIS KEKAL DI ATAS LOT 23697, JALAN BESI 9, TAMAN SRI PUTERI, 81300 SKUDAI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
UNTUK: JAY KUMAR A/L SUPARMANIAM
SLIDE PB_K8_JAY KUMAR AL SUPARMANIAM.
 
Oleh
ABDUL HANAN KHAN BIN ALIOR KHAN
 
 

 

21. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KEDUA KE ATAS PELAN LULUS NO RUJUKAN MPJBT (JB) RP 9/13/2015 BERTARIKH 14 APRIL 2016 BAGI TUJUAN PEMBANGUNAN KOMERSIL BERCAMPUR BERSTRATA 26 TINGKAT YANG MENGANDUNGI:

FASA 1A:
1. 2 TINGKAT SUB-BASMEN YANG MENGANDUNGI:
A) 2 TINGKAT TEMPAT LETAK KENDERAAN BESERTA RUANG MEKANIKAL DAN ELEKTRIKAL (LG2-LG1)
B) 10 UNIT RUANG KEDAI, PUSAT PENGUMPULAN SAMPAH DAN SEBUAH STESEN SUIS UTAMA (33KV) (LG1)
2. 5 TINGKAT PODIUM YANG MENGANDUNGI:
A) 1 TINGKAT RUANG KOMERSIL (L1)
B) 3 TINGKAT TEMPAT LETAK KENDERAAN, RUANG MEKANIKAL DAN ELEKTRIKAL (L2-L4) BESERTA RUANG KOMERSIL (L2)
C) 7 UNIT PANGGUNG WAYANG (L3-L4)
D) 1 TINGKAT LANDSKAP PODIUM BESERTA KOLAM RENANG, RUANG KOMERSIL DAN KEMUDAHAN SOKONGAN (L5)
FASA 1B:
1. 19 TINGKAT RUANG PEJABAT - BLOK C (108 UNIT) BESERTA 1 UNIT RUANG PERNIAGAAN DI ARAS BUMBUNG
2. 20 TINGKAT HOTEL APARTMENT- BLOK B (213 UNIT)
3. 9 TINGKAT HOTEL - BLOK D (198 UNIT)
FASA 1C:
1. 20 TINGKAT PANGSAPURI PERKHIDMATAN - BLOK A (214 UNIT)

DI ATAS PTD 200493, PARCEL B78, MEDINI ISKANDAR, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK UMLAND MEDINI LAKESIDE DEVELOPMENT SDN BHD.
SLIDE PB_K9_UMLAND MEDINI LAKESIDE DEVELOPMENT SDN BHD
 
Oleh
TAN LOKE MUN
 
 

 

22. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KE ATAS PELAN LULUS NO: MBIP(JB)BS/9/12/2019 BERTARIKH 10.10.2019 BAGI CADANGAN PENDIRIAN SEBUAH TADIKA 4 TINGKAT
DENGAN KEMUDAHAN BESERTA 1 UNIT KEBUK SAMPAH & RUANG KITAR SEMULA
DI ATAS PTD 144387, TAMAN HORIZON HILLS, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM.
UNTUK ASWAN EDUCATION SDN. BHD.
SLIDE PB_K10_ASWAN EDUCATION SDN. BHD.
 
Oleh
WONG CHEE KIN
 
 

H. PEMBENTANGAN PERMOHONAN PELAN LANDSKAP

 

23. KERTAS MESYUARAT

 
PERMOHONAN PELAN LANDSKAP BAGI CADANGAN MENDIRIKAN:-
I) FASA 10D1 – 118 UNIT RUMAH TERES 2 TINGKAT (24’X80’) DI ATAS PTD 197333, PTD 197335, LOT 127948 – LOT 127988, LOT 127990 – LOT 128064
II) FASA 10D2 – 111 UNIT RUMAH TEERS 2 TINGKAT (24’X80’) DI ATAS PTD 197329 -197332, PTD 197334, LOT 127770 – LOT 127783, LOT 127785 – LOT 127797, LOT 127799 – 127811, LOT 127814 – 127838, LOT 127840 – LOT 127880
III) FASA 10D3 – 113 UNIT RUMAH TERES 2 TINGKAT (24’X80’) DI ATAS PTD 197340 – PTD 197341, LOT 128065 – LOT 128090, LOT 128092 – LOT 128103, LOT 128105 – LOT 128116, LOT 128169 – LOT 128229
IV) FASA 10D4 – 113 UNIT RUMAH TERES 2 TINGKAT (24’X80’) DI ATAS PTD 197342, LOT 128118 – LOT 128168, LOT 128230 – 128290 TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.

UNTUK GUNUNG IMPIAN DEVELOPMENT SDN BHD
SLIDE JL_K1_GUNUNG IMPIAN DEVELOPMENT SDN BHD
 
Oleh
FIONA CHEW MUN MUN
 
 

 

24. KERTAS MESYUARAT

 
PERMOHONAN PELAN LANSKAP BAGI CADANGAN MENDIRIKAN 24 UNIT KEDAI PEJABAT 2 TINGKAT DI ATAS LOT 165033 - LOT 165056, FASA 6C, TAMAN MUTIARA UTAMA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK NUSA UTAMA SDN BHD
SLIDE JL_K4_NUSA UTAMA SDN.BHD.
 
Oleh
CHOO TAI HUP
 
 

 

25. KERTAS MESYUARAT

 
PERMOHONAN PELAN LANDSKAP BAGI CADANGAN FASA 1B PEMBANGUNAN 215 UNIT RUMAH TERES 2 TINGKAT YANG MENGANDUNGI :-
I) 215 UNIT RUMAH TERES 2 TINGKAT (22' X 70') DI ATAS PTD 218317 - PTD 218357, PTD 218408 - PTD 218444, PTD 218445 - PTD 218481, PTD 218531 – PTD 218567, PTD 218568 - PTD 218604, PTD 218654 - PTD 218666, DAN PTD 218667 - PTD 218679
II) 1 UNIT PENCAWANG ELEKTRIK "DOUBLE CHAMBER" DI ATAS PTD 219475
DI TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM.
UNTUK BEST PRIMAX SDN BHD
SLIDE JL_K2_BEST PRIMAX SDN BHD
 
Oleh
LAU SEOK CHIN
 
 

 

26. KERTAS MESYUARAT

 
PERMOHONAN PELAN LANDSKAP BAGI CADANGAN FASA 1D PEMBANGUNAN 72 UNIT KEDAI PEJABAT 2 & 3 TINGKAT YANG MENGANDUNGI :-
1) 70 UNIT KEDAI PEJABAT 2 TINGKAT (24' X 75') DI ATAS PTD 218198 - PTD 218232 DAN PTD 218315 - PTD 218281
2) 2 UNIT KEDAI PEJABAT 3 TINGKAT (24' X 75') DI ATAS PTD 218197 DAN PTD 218316
3) 2 UNIT PENCAWANG ELEKTRIK 'DOUBLE CHAMBER" DI ATAS PTD 219473 DAN PTD 219474
DI TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM
UNTUK BEST PRIMAX SDN BHD
SLIDE JL_K3_BEST PRIMAX SDN BHD_72 UNIT
 
Oleh
LAU SEOK CHIN
 
 

I. PEMBENTANGAN PERMOHONAN AM (LAIN_LAIN)

 

27. KERTAS MESYUARAT

 
PERMOHONAN NAMA TAMAN BAGI CADANGAN PEMBANGUNAN BERCAMPUR DI ATAS LOT 632 - LOT 637, LOT 642 - LOT 646, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM.
UNTUK OYBINA SDN. BHD.
SLIDE KM_K3_OYBINA SDN. BHD.
 
Oleh
TEW SEH HWEE
 
 

 

28. KERTAS MESYUARAT

 
PERMOHONAN NAMA BANGUNAN BAGI CADANGAN MEMBINA SEBUAH RUMAH IBADAT BUKAN ISLAM YANG MENGANDUNGI:

I) 1 BLOK TOKONG 1 TINGKAT
II) 1 BLOK PEMBELAJARAN DAN PEJABAT 2 TINGKAT
III) 1 UNIT KEBUK SAMPAH BERSERTA RUANG KITAR SEMULA
IV) 1 UNIT PONDOK PENGAWAL

DI ATAS PTD 195072, JALAN PERSIARAN BARAT, TAMAN HORIZON HILL, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
UNTUK PERSATUAN PENGANUT DEWA LIAN HUA TANG JOHOR BAHRU, JOHOR.
SLIDE KM_K4_PERSATUAN PENGANUT DEWA LIAN HUA TANG JOHOR BAHRU
 
Oleh
CHAN WAI LAI
 
 

 

29. KERTAS MESYUARAT

 
PERMOHONAN NOMBOR BANGUNAN BAGI CADANGAN PEMBANGUNAN YANG MENGANDUNGI 1585 UNIT IAITU :-
1) 1340 UNIT PERUMAHAN :
1.1) 18 UNIT RUMAH SESEBUAH 2 TINGKAT (60’ X 95’) (PTD 217927 - PTD 217935 & PTD 217956 - PTD 217964)
1.2) 156 UNIT RUMAH BERKEMBAR 2 TINGKAT (40’/45’ X 80’-106’) (PTD 217883 - PTD 217926, 217936 - PTD 217955 & PTD 217965 - PTD 218056)
1.3) 48 UNIT RUMAH BERKEMBAR 2 TINGKAT (32’ X 80’) (PTD 218149 – PTD 218196)
1.4) 92 UNIT RUMAH KLUSTER 2 TINGKAT (32’ X 70’) (PTD 218057-PTD 218148)
1.5) 639 UNIT RUMAH TERES 2 TINGKAT (24’ X 70’) (PTD 218830 - PTD 219468)
1.6) 387 UNIT RUMAH TERES 2 TINGKAT (22’ X 70’) (PTD 218317 - 218703)

2) 245 UNIT PERDAGANGAN
2.1) 116 UNIT KEDAI PEJABAT 2 TINGKAT (24’ X 75’) (PTD 218198 - PTD 218255 & PTD 218258 - PTD 218315)
2.2) 4 UNIT KEDAI PEJABAT 3 TINGKAT (24’ X 75’) (PTD 218197, PTD 218256, PTD 218257 & PTD 218316)
2.3) 3 UNIT PLOT PERNIAGAAN (PTD 219469)
2.4) 122 UNIT KEDAI KOS SEDERHANA 1 TINGKAT (20’X60’) (PTD 218708 - PTD 218829)
DI ATAS LOT-LOT 697, 2993 & 2994, TAMAN PULAI ORKID, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK BEST PRIMAX SDN. BHD.
SLIDE KM_K5_BEST PRIMAX SDN. BHD.
 
Oleh
CHIAM KIM CHYE
 
 

J. PEMBENTANGAN KERTAS PEMAKLUMAN

 
 
 

K. HAL-HAL LAIN

 

30. SURAT MAKLUMAN MENGENAI EDARAN PEKELILING KETUA PENGARAH PERANCANGAN BANDAR DAN DESA BILANGAN 6 TAHUN 2022

 
11.0 HAL-HAL LAIN

11.1 SURAT MAKLUMAN MENGENAI EDARAN PEKELILING KETUA PENGARAH PERANCANGAN BANDAR DAN DESA BILANGAN 6 TAHUN 2022
~ PANDUAN PENETAPAN TARIKH RASMI NOTIS UNTUK KEBENARAN MERANCANG MELALUI BORANG C(1) DAN C(2) DI DALAM JADUAL PERTAMA KAEDAH-KAEDAH PENGAWALAN PERANCANGAN (AM) (KPPA).

PUAN SETIAUSAHA MESYUARAT MEMAKLUMKAN BAHAWA, PIHAK URUSETIA OSC TELAH MENERIMA SURAT PEMAKLUMAN EDARAN PEKELILING KETUA PENGARAH PERANCANGAN BANDAR DAN DESA BILANGAN 6 TAHUN 2022 MENGENAI PANDUAN PENETAPAN TARIKH RASMI NOTIS UNTUK KEBENARAN MERANCANG MELALUI BORANG C(1) DAN C(2) DI DALAM JADUAL PERTAMA KAEDAH-KAEDAH PENGAWALAN PERANCANGAN (AM) (KPPA).

UNTUK MAKLUMAN, BAGI TUJUAN PENYELARASAN DENGAN PROSES DAN PROSEDUR PELAN PEMAJUAN MANUAL OSC 3.0 PLUS YANG TELAH DILULUSKAN DI PERINGKAT MAJLIS NEGARA BAGI KERAJAAN TEMPATAN KE 75 (MNKT KE-75) PADA 10 JANUARI 2020, JAWATANKUASA OSC HENDAKLAH MENETAPKAN TARIKH NOTIS UNTUK KEBENARAN MERANCANG MELALUI C(1) DAN C(2) IALAH DALAM TEMPOH 14 HARI DARI TARIKH JAWATANKUASA OSC MENIMBANG UNTUK MEMBUAT KEPUTUSAN MUKTAMAD KE ATAS PERMOHONAN KEBENARAN MERANCANG. PEKELILING INI BERKUATKUASA PADA TARIKH PEKELILING DITANDATANGANI IAITU PADA 12 DISEMBER 2022.

RINGKASAN DARIPADA PEKELILING TERSEBUT, MENUNJUKKAN BAHAWA SEMUA PERMOHONAN YANG TELAH DITIMBANG DI DALAM MESYUARAT JAWATANKUASA OSC, PEMBERIAN NOTIS KEBENARAN MERANCANG BAGI C(1) DAN C(2) PERLU DIBERIKAN DALAM TEMPOH 14 HARI DARI MESYUARAT JAWATANKUASA TERSEBUT. OLEH ITU, SEMUA PBT TERUTAMANYA JABATAN PERANCANGAN PEMBANGUNAN MBIP PERLU MENGAMBIL MAKLUM MENGENAI PERKARA TERSEBUT.

EN. MUHAMAD HANIF BIN HAMSAH, PENOLONG PENGARAH PERANCANGAN MBIP MEMAKLUMKAN, PADA MASA INI SEBENARNYA ADALAH AGAK MUSTAHIL UNTUK MENETAPKAN TEMPOH 14 HARI SELEPAS MESYUARAT UNTUK PENGELUARAN NOTIS KEBENARAN MERANCANG BAGI C(1). INI KERANA, PIHAK PEMOHON/PSP (PRINCIPAL SUBMITTING PERSON) SENDIRI AKAN MENGHADAPI KESUKARAN UNTUK MEMATUHI SYARAT-SYARAT TEKNIKAL YANG TELAH DITETAPKAN OLEH MAJLIS. TERUTAMANYA BAGI PERMOHONAN KEBENARAN MERANCANG PELAN SUSUNATUR YANG BANYAK ULASAN TEKNIKAL YANG MASIH BELUM DIPATUHI. MENURUTNYA LAGI BAGI NOTIS C(2), TIADA MASALAH KERANA IA ADALAH MAKLUMAN KEPUTUSAN MENOLAK DAN SELEPAS MESYUARAT BOLEH DILAKSANAKAN.

DALAM SITUASI SEMASA, PERMOHONAN YANG DIBERI NOTIS C(1) DIBERIKAN KEPADA PEMOHON YANG TELAH BENAR-BENAR MEMATUHI SYARAT, KEBIASANNYA PALING SINGKAT TEMPOH C(1) YANG DIBERIKAN ADALAH SATU (1) BULAN DAN HANYA SEGELINTIR PEMOHON SAHAJA YANG BERJAYA DIBERI C(1) DALAM MASA ITU. KEBANYAKAN PERMOHONAN AKAN DIBERI C(1) DALAM TEMPOH YANG LAMA DAN ADA YANG MENCAPAI HAMPIR SETAHUN. INI SEBENARNYA DI LUAR BIDANG KUASA MAJLIS KERANA IANYA BERGANTUNG KEPADA KOMITMEN PEMOHON/PSP SENDIRI UNTUK MENUNAIKAN SYARAT-SYARAT TEKNIKAL BAGI TUJUAN PERAKUAN PELAN SETELAH PERMOHONAN MEREKA DILULUSKAN DI DALAM MESYUARAT JAWATANKUASA OSC.

YB. DATO’ PENGERUSI JUGA BERSETUJU DENGAN PANDANGAN ENCIK MUHAMAD HANIF BIN HAMSAH. ADALAH SUKAR UNTUK PIHAK MAJLIS MEMBERIKAN NOTIS KEBENARAN MERANCANG C(1) KEPADA PEMOHON DALAM TEMPOH 14 HARI, KERANA IA BERGANTUNG KEPADA PEMOHON/ PSP YANG BENAR-BENAR KOMITED UNTUK MENUNAIKAN SYARAT-SYARAT TEKNIKAL. YB. DATO’ PENGERUSI JUGA BERPANDANGAN, SEHARUSNYA PIHAK PLANMALAYSIA MEMPERHALUSI PERKARA INI TERLEBIH DAHULU DAN PERLU DIBINCANGKAN BERSAMA SEMUA PBT. BELIAU JUGA BERPENDAPAT, BUKAN SAHAJA PIHAK MBIP, MALAH DI LAIN-LAIN PBT JUGA AKAN MENGHADAPI MASALAH YANG SAMA. WALAU BAGAIMANAPUN, MEMANDANGKAN PEKELILING INI TELAH BERKUATKUASA MAKA PIHAK MAJLIS PERLU MENIMBALGUNA PEKELILING TERSEBUT SEBAGAIMANA YANG TELAH DITETAPKAN.

PUAN SETIAUSAHA MESYUARAT MENGAMBIL MAKLUM MENGENAI PERKARA TERSEBUT DAN AKAN MEMANJANGKAN ISU INI KEPADA PIHAK PLANMALAYSIA DAN AKAN DIBINCANGKAN DI DALAM PLATFORM YANG BERSESUAIAN. BELIAU JUGA AKAN MEMAKLUMKAN SEMULA KEPADA MESYUARAT SEKIRANYA TELAH MENDAPAT RESPON DARIPADA RASIONALNYA PIHAK PLANMALAYSIA MENETAPKAN TEMPOH 14 HARI TERSEBUT UNTUK ARAHAN NOTIS KEBENARAN MERANCANG BAGI C(1).

(TINDAKAN: JABATAN PERANCANGAN PEMBANGUNAN MBIP,
DAN MAKLUMAN SEMUA AGENSI TEKNIKAL TERLIBAT)
 
Oleh
UNIT PUSAT SEHENTI
 
 

 

31. PROSEDUR OPERASI STANDARD (SOP) PERMOHONAN PEMAJUAN DALAM TEMPOH SISTEM OSC 3.0 PLUS ONLINE MENGALAMI GANGGUAN CAPAIAN

 
11.2 PROSEDUR OPERASI STANDARD (SOP) PERMOHONAN PEMAJUAN DALAM TEMPOH SISTEM OSC 3.0 PLUS ONLINE MENGALAMI GANGGUAN CAPAIAN

PIHAK URUSETIA OSC TELAH MENERIMA SURAT MAKLUMAN DARIPADA PIHAK SETIAUSAHA KERAJAAN (KERAJAAN TEMPATAN) SUKJ KT BERTARIKH 2 JANUARI 2023 MENGENAI SURAT OLEH JABATAN KERAJAAN TEMPATAN, KEMENTERIAN PEMBANGUNAN KERAJAAN TEMPATAN (JKT KPKT) SURAT BERTARIKH 27 DISEMBER 2022, YANG TELAH MEMBERI MAKLUMAN MENGENAI PERKARA PROSEDUR OPERASI STANDARD (SOP) PERMOHONAN PEMAJUAN DALAM TEMPOH SISTEM OSC 3.0 PLUS ONLINE MENGALAMI GANGGUAN CAPAIAN SEBAGAIMANA LAMPIRAN 11.2.

RUMUSAN DARIPADA SURAT TERSEBUT ADALAH SEKIRANYA BERLAKU GANGGUAN CAPAIAN PADA SISTEM OSC 3.0 PLUS ONLINE, URUSETIA OSC BOLEH MENERIMA PERMOHONAN SECARA MANUAL DI KAUNTER SETERUSNYA MENCATAT BUTIRAN PENERIMAAN SECARA MANUAL. SEKIRANYA LENGKAP, PEMOHON/ PSP PERLU MEMBUAT PERMOHONAN RASMI SECARA ONLINE SETELAH SISTEM PULIH SEPENUHNYA. PIHAK URUSETIA OSC AKAN MEMBUAT CATATAN DI RUANGAN AKTIVITI SISTEM OSC 3.0 PLUS ONLINE TARIKH PERMOHONAN DISEMAK.

EDARAN PERMOHONAN SECARA RASMI AKAN DIBUAT KEPADA AGENSI TEKNIKAL LUARAN (ATL) SETELAH SISTEM PULIH. DENGAN INI TIDAK TIMBUL ISU KELEWATAN AGENSI TEKNIKAL DALAM MEMBERI ULASAN DALAM TEMPOH YANG DITETAPKAN. MANAKALA BAGI PERMOHONAN YANG SEDANG DALAM PROSES ULASAN DAN SISTEM MENGALAMI GANGGUAN CAPAIAN, PIHAK JKT TIDAK MENGAMBIL KIRA TEMPOH GANGGUAN CAPAIAN TERHADAP SISTEM DALAM LAPORAN BULANAN KELEWATAN AGENSI TEKNIKAL YANG MEMBERIKAN ULASAN.

(TINDAKAN: SEMUA AGENSI TEKNIKAL TERLIBAT)
 
Oleh
UNIT PUSAT SEHENTI
 
 

 

32. PERMOHONAN BAHARU MELALUI SISTEM OSC 3.0 PLUS ONLINE BERMULA JANUARI 2023

 
11.3 PERMOHONAN BAHARU MELALUI SISTEM OSC 3.0 PLUS ONLINE BERMULA JANUARI 2023

PUAN SETIAUSAHA MESYUARAT MEMAKLUMKAN BAHAWA, BERMULA JANUARI 2023 PERMOHONAN PERMIT SEMENTARA PEMAJUAN MENARA ATAU STRUKTUR TELEKOMUNIKASI DAN PERMOHONAN PERMIT SEMENTARA BAGI PENYEDIAAN PENGINAPAN PEKERJA SECARA JANGKA PENDEK DAN PERMIT SEMENTARA BAGI PENGINAPAN PEKERJA BERPUSAT (CLQ) AKAN DITERIMA DAN DIEDAR MELALUI SISTEM OSC 3.0 PLUS ONLINE. INI ADALAH SELARAS SEBAGAIMANA ARAHAN PEKELILING DARIPADA PIHAK JABATAN KERAJAAN TEMPATAN, KEMENTERIAN PEMBANGUNAN KERAJAAN TEMPATAN SEBELUM INI MENGENAI
I. PROSEDUR OPERASI STANDARD (SOP) PERMOHONAN PERMIT SEMENTARA BANGUNAN BAGI RUMAH PEKERJA DALAM TAPAK BINA
II. PROSEDUR PERMOHONAN PEMAJUAN MENARA ATAU STRUKTUR KOMUNIKASI

PERMOHONAN PERMIT SEMENTARA BAGI KEDUA-DUA JENIS PERMOHONAN INI AKAN MULA DITERIMA PADA 15 JANUARI 2023 MELALUI OSC 3.0 PLUS ONLINE SERTA PEMOHON JUGA PERLU MMATUHI SEBAGAIMANA SENARAI SEMAK TERBAHARU YANG DISERTAKAN DI DALAM WEBSITE MAJLIS.

(MAKLUMAN)
 
Oleh
UNIT PUSAT SEHENTI
 
 

 

33. PERMOHONAN MELALUI INSENTIF ISKANDAR PUTERI FAST LANE (IPFL) BERMULA JANUARI 2023

 
11.4 PERMOHONAN MELALUI INSENTIF ISKANDAR PUTERI FAST LANE (IPFL) BERMULA JANUARI 2023

PUAN SETIAUSAHA MESYUARAT MEMAKLUMKAN BAHAWA, MELALUI KEPUTUSAN MESYUARAT JAWATANKUASA PERANCANG NEGERI JOHOR BIL.JPN 02/2022 YANG TELAH BERSIDANG PADA 25 OGOS 2022, TELAH “BERSETUJU” TERHADAP PEMAKAIAN INISIATIF KULAI FAST LANE (KFL) OLEH MAJLIS PERBANDARAN KULAI DIPANJANGKAN KEPADA PIHAK BERKUASA TEMPATAN (PBT) NEGERI JOHOR UNTUK PEMAKAIAN BAGI PEMAJUAN TERTENTU MENGIKUT KESESUAIAN PIHAK BERKUASA TEMPATAN YANG DIKENALI SEBAGAI JOHOR FAST LANE.

LANJUTAN DARIPADA ITU, MAJLIS BANDARAYA ISKANDAR PUTERI JUGA “BERSETUJU” MELAKSANAKAN INISIATIF TERSEBUT BAGI PEMBANGUNAN INDUSTRI DAN PENUBUHAN SEKSYEN (URUSETIA) ISKANDAR PUTERI FAST LANE (IPFL) SEBAGAIMANA YANG TELAH DISELARASKAN DALAM MESYUARAT JAWATANKUASA KEWANGAN DAN PERKARA AM BIL.9/2022(2) BERTARIKH 31 OKTOBER 2022 DAN TELAH DISAHKAN DALAM MESYUARAT PENUH MAJLIS BANDARAYA ISKANDAR PUTERI BIL.10/2022 BERTARIKH 30 NOVEMBER 2022.

UNTUK MAKLUMAN MESYUARAT, SEKSYEN ISKANDAR PUTERI FAST LANE (IPFL) TELAH DIWUJUDKAN DI BAWAH KAWALAN UNIT PUSAT SEHENTI (OSC) MAJLIS BANDARAYA ISKANDAR PUTERI YANG MULA BEROPERASI PADA 1 DISEMBER 2022. TERDAPAT DUA (2) DOKUMEN BERKAITAN UNTUK MAKLUMAN SEMUA MENGENAI SENARAI SEMAK DALAM MEMROSES PERMOHONAN YANG AKAN DIKATEGORIKAN DALAM INISIATIF ISKANDAR PUTERI FAST LANE (IPFL) IAITU:
I. SENARAI SEMAK PENYELARASAN AWAL TEKNIKAL RINGKASAN CADANGAN PROJEK (PROJEK BRIEF) – IPFL/P.BRIEF/01
II. BORANG PERMOHONAN LESEN PREMIS PERNIAGAAN DAN PAPARAN IKLAN ISKANDAR PUTERI FAST LANE (IPFL) – IPFL/LESEN/02

RUJUK LAMPIRAN 11.4

PUAN SETIAUSAHA MESYUARAT JUGA MEMAKLUMKAN BAHAWA SATU MESYUARAT PENYELARASAN BERSAMA AGENSI DAN JABATAN TEKNIKAL TERLIBAT UNTUK TINDAKAN DAN MAKLUMAN MENGENAI INISIATIF ISKANDAR PUTERI FAST LANE (IPFL) AKAN DIADAKAN DALAM MASA TERDEKAT.
(MAKLUMAN)
 
Oleh
UNIT PUSAT SEHENTI
 
 

 

34. SENARAI SEMAK PERMOHONAN PELAN PEMBANGUNAN BERMULA JANUARI 2023 (DISELARASKAN SEBAGAIMANA SENARAI SEMAK MANUAL OSC 3.0 PLUS)

 
11.5 SENARAI SEMAK PERMOHONAN PELAN PEMBANGUNAN BERMULA JANUARI 2023 (DISELARASKAN SEBAGAIMANA SENARAI SEMAK MANUAL OSC 3.0 PLUS)

PUAN SETIAUSAHA MESYUARAT MEMAKLUMKAN BAHAWA, MAJLIS BANDARAYA ISKANDAR PUTERI (MBIP) TELAH MENGGUNAPAKAI SISTEM OSC 3.0 PLUS ONLINE BERMULA PADA 15 JULAI 2020. WALAU BAGAIMANAPUN, PIHAK MBIP MASIH BELUM MENGGUNAPAKAI SECARA KESELURUHAN SENARAI SEMAK SEBAGAIMANA YANG TERKANDUNG DI DALAM MANUAL OSC 3.0 PLUS: PROSES DAN PROSEDUR CADANGAN PEMAJUAN SERTA PELAKSANAAN PUSAT SETEMPAT (OSC) YANG TELAH DISEDIAKAN OLEH PIHAK JABATAN KERAJAAN TEMPATAN, KEMENTERIAN PEMBANGUNAN KERAJAAN TEMPATAN (JKT KPKT). INI BERIKUTAN PIHAK MBIP PERLU MENELITI SENARAI SEMAK TERSEBUT UNTUK DISELARASKAN DENGAN KEPERLUAN JABATAN TEKNIKAL DALAMAN MBIP.

MEMANDANGKAN KEKANGAN PANDEMIK COVID-19 YANG TELAH MELANDA NEGARA PADA TAHUN 2020 HINGGA 2021 DAN TEMPOH PERINTAH KAWALAN PERGERAKAN (PKP), MENJADIKAN KERJA-KERJA PERBINCANGAN SENARAI SEMAK BERSAMA JABATAN TEKNIKAL DALAMAN MBIP TELAH TERTANGGUH LAMA. SEHINGGALAH SETELAH AUDIT PEMATUHAN OSC 3.0 PLUS ONLINE YANG TELAH DILAKSANAKAN OLEH PIHAK JKT KPKT PADA 17 MEI 2022 YANG LALU DI MBIP, BESERTA TEGURAN-TEGURAN OLEH AUDITOR JKT KPKT, PIHAK MBIP TELAH BERJAYA MEMUKTAMADKAN SENARAI SEMAK YANG TERKINI, SELARAS DENGAN KEPERLUAN JABATAN TEKNIKAL DALAMAN MBIP SERTA DISELARASKAN JUGA DENGAN MANUAL OSC 3.0 PLUS : PROSES DAN PROSEDUR CADANGAN PEMAJUAN SERTA PELAKSANAAN PUSAT SETEMPAT (OSC) YANG TELAH DISEDIAKAN OLEH PIHAK JKT KPKT.

UNTUK MAKLUMAN MESYUARAT, URUSETIA OSC AKAN MENGHEBAHKAN PEMAKLUMAN SENARAI SEMAK BAHARU DOKUMEN PERMOHONAN PELAN PEMBANGUNAN MBIP INI DI WEBSITE MAJLIS MBIP BERMULA PADA 15 JANUARI 2023 HINGGA 31 JANUARI 2023 (UNTUK TRIAL RUN), DAN AKAN DIGUNAPAKAI SECARA RASMI DI MBIP PADA 1 FEBRUARI 2023.

RUJUK LAMPIRAN 11.5

(TINDAKAN: SEMUA AGENSI TEKNIKAL TERLIBAT)
 
Oleh
UNIT PUSAT SEHENTI
 
 

 

35. SURAT MAKLUMAN MENGENAI AGENSI YANG LEWAT KEMUKAKAN ULASAN SECARA ONLINE MENGIKUT TEMPOH YANG DITETAPKAN (BULAN NOVEMBER 2022)

 
11.6 SURAT MAKLUMAN MENGENAI AGENSI YANG LEWAT KEMUKAKAN ULASAN SECARA ONLINE MENGIKUT TEMPOH YANG DITETAPKAN (BULAN NOVEMBER 2022)

PUAN SETIAUSAHA MESYUARAT MEMAKLUMKAN TERDAPAT SATU (1) AGENSI TEKNIKAL LUAR YANG GAGAL MEMBERIKAN ULASAN DALAM TEMPOH PIAGAM DARI 1 NOVEMBER 2022 SEHINGGA 31 NOVEMBER 2022 IAITU INDAH WATER KONSORTIUM (IWK). DIHARAPKAN AGAR SEMUA AGENSI TEKNIKAL DAPAT MEMATUHI DENGAN MEMBERIKAN ULASAN DALAM TEMPOH 14 HARI SEBAGAIMANA YANG TELAH DITETAPKAN.

(TINDAKAN: INDAH WATER KONSORTIUM (IWK) DAN SEMUA AGENSI TEKNIKAL)
 
Oleh
UNIT PUSAT SEHENTI