Loading...

Mesyuarat Jawatankuasa OSC

Majlis Bandaraya Subang Jaya


Mesyuarat Jawatankuasa OSC, Majlis Bandaraya Subang Jaya

 

TAJUK MESYUARAT

:

MESYUARAT JAWATANKUASA PUSAT SETEMPAT (OSC) PERANCANGAN DAN PEMBANGUNAN MAJLIS BANDARAYA SUBANG JAYA BIL. 17/2025

TARIKH

:

3 SEPTEMBER 2025 (RABU)

MASA

:

2:00 PM

TEMPAT

:

BILIK MESYUARAT KENANGA, ARAS 2, BANGUNAN MAJLIS BANDARAYA SUBANG JAYA, PERSIARAN PERPADUAN, USJ 5, 47610 SUBANG JAYA, SELANGOR DARUL EHSAN.

PENGERUSI

:

TUAN HJ. MOHD ZULKURNAIN BIN CHE ALI S.M.S., A.M.N

 

AGENDA MESYUARAT

 

1

PERUTUSAN PENGERUSI MESYUARAT OSC

2

PENGESAHAN MINIT MESYUARAT MESYUARAT OSC BIL.16/2025 PADA 19-08-2025

3

PERKARA-PERKARA BERBANGKIT

4

PEMBENTANGAN PERMOHONAN PEMAJUAN KELULUSAN

5

PEMBENTANGAN DAN PERTIMBANGAN KERTAS DASAR

6

PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN

7

PEMBENTANGAN KERTAS PEMAKLUMAN

8

PEMBENTANGAN STATUS DAN ISU PEMANTAUAN TAPAK

9

HAL-HAL LAIN BERKAITAN PERMOHONAN I

10

HAL-HAL LAIN BERKAITAN PERMOHONAN II

11

HAL-HAL LAIN

 

Kertas Pembentangan

A. 1.0 AGENDA MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 17_2025

 
1.0 AGENDA MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 17_2025
 
 

B. 2.0 MINIT MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 16_2025

 
2.0 MINIT MESYUARAT JK OSC PERANCANGAN DAN PEMBANGUNAN BIL. 16_2025
 
 

C. 3.0 MAKLUMBALAS KEPUTUSAN MESYUARAT JAWATANKUASA OSC PERANCANGAN DAN PEMBANGUNAN BIL.17_2025

 
3.0 MAKLUMBALAS KEPUTUSAN MESYUARAT JAWATANKUASA OSC PERANCANGAN DAN PEMBANGUNAN BIL.17_2025
 
 

D. PEMBENTANGAN PERMOHONAN SERENTAK

 

1. 4.1 KERTAS KERJA : 111/81/17/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN MEROBOH DAN MEMBINA SEMULA KE ATAS SEBUAH RUMAH TERES 1 TINGKAT YANG SEDIA ADA DI ATAS LOT 5107, NO. 40, JALAN SS14/2D, SS14, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250806-005
MBSJ-PB20250806-009
 
Oleh
UNTUK: GOH SUE SENG & THONG YAN YEE
 
 

 

2. 4.2 KERTAS KERJA : 112/81/17/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS SATU (1) UNIT KILANG TERES 1 ½ TINGKAT SEDIA ADA KEPADA 2 TINGKAT DI ATAS PT 1723, NO. 31, JALAN PJS 11/9, BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ-KM20250805-001
MBSJ-PB20250811-006
 
Oleh
UNTUK: WOON YOKE MOOI
 
 

 

3. 4.3 KERTAS KERJA : 113/81/17/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI PADA BANGUNAN KILANG BERKEMBAR 3 TINGKAT SEDIADA BESERTA 1 TINGKAT MEZZANINE (JENIS KEKAL BERSAIZ 45’ X 75’) DI ATAS PT 3292, JALAN BS 7/1C, TAMAN PERINDUSTRIAN BUKIT SERDANG, SEKSYEN 7, TAMAN BUKIT SERDANG, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.


MBSJ-KM20250805-003
MBSJ-PB20250808-002
 
Oleh
UNTUK: H&H PRODUCTION SDN. BHD.
 
 

 

4. 4.4 KERTAS KERJA : 114/81/17/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG + PELAN KERJA TANAH + PELAN JALAN DAN PERPARITAN + PELAN LANDSKAP + PELAN ALAMAT

CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN (998 UNIT) 40 TINGKAT YANG MENGANDUNGI:
A. MENARA A - 33 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (275 UNIT) DAN PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (250 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 39
B. MENARA B - 34 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (473 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 40
C. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI KOLAM RENANG, DEWAN SERBAGUNA, GIMNASIUM, BILIK SERBAGUNA, BILIK BACAAN, DOBI DAN TAMAN PERMAINAN DI TINGKAT 7
D. 6 TINGKAT PODIUM TEMPAT LETAK KERETA DARI TINGKAT 1 HINGGA TINGKAT 6
E. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI PEJABAT PENGURUSAN, TADIKA, SURAU (LELAKI DAN PEREMPUAN), KEDAI, BILIK PETI SURAT DAN KEBUK SAMPAH BERPUSAT DI TINGKAT 1
F. 1 TINGKAT BESMEN YANG MENGANDUNGI RUANG MEKANIKAL DI TINGKAT B1
DI ATAS LOT 92196 SELUAS 3.378 EKAR, PERSIARAN SUBANG, USJ 7, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.


MBSJ-KM20250317-002
MBSJ-TJB20250814-001
MBSJ-KT20250813-001
MBSJ-JP20250814-001
MBSJ-PL20250812-001
 
Oleh
UNTUK: SIME DARBY PROPERTY (SJ7) SDN. BHD.
 
 

 

5. 4.5 KERTAS KERJA : 115/81/17/2025

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN UBAHSUAI DI SEBAHAGIAN TINGKAT 17, TINGKAT 18 DAN TINGKAT 19 (NO. PETAK 368, A466 (368) DAN A467 (368) (RUANG M&E DAN RUANG BUMBUNG RATA SEDIADA) KEPADA RUANG PEJABAT DI MENARA ‘NORTHERN TOWER’ PADA BANGUNAN ‘FIRST SUBANG’ PEJABAT 17 TINGKAT YANG SEDIA ADA DI ATAS PT 3652 (LOT 7833), JALAN SS 15/4G, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.


MBSJ-KM20250814-013
MBSJ-PB20250813-012
 
Oleh
UNTUK: NPO DEVELOPMENT SDN. BHD. (434271-A)
 
 

 

6. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN SERENTAK : KEBENARAN MERANCANG + PELAN KERJA TANAH + PELAN LANDSKAP + PELAN ALAMAT

CADANGAN PEMBANGUNAN PERUMAHAN (2,476 UNIT) YANG MENGANDUNGI:
1. FASA 1
A. MENARA A – 37 TINGKAT PANGSAPURI HARGA BEBAS (1,380 UNIT) DARI TINGKAT 9 HINGGA TINGKAT 45
B. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI KEBUK SAMPAH, BILIK PETI SURAT, PONDOK PENGAWAL DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 1
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI BILIK PETI SURAT, PEJABAT PENGURUSAN, TAMAN PERMAINAN, GELANGGANG SUKAN, TADIKA, RUANG MEDITASI, RUANG WARGA EMAS, SURAU (LELAKI DAN PEREMPUAN), BILIK PENGURUSAN JENAZAH DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 2
D. 6 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 3 HINGGA TINGKAT 8
E. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI GELANGGANG SUKAN DAN KOLAM RENANG DI TINGKAT 9

2. FASA 2
A. MENARA C – 26 TINGKAT PANGSAPURI HARGA BEBAS (416 UNIT) DARI TINGKAT 9 HINGGA TINGKAT 34
B. 3 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 6 HINGGA TINGKAT 8
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI KOLAM SPA DI TINGKAT 9

3. FASA 3
A. MENARA B – 37 TINGKAT PANGSAPURI HARGA BEBAS (680 UNIT) DARI TINGKAT 9 HINGGA TINGKAT 45
B. 4 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 5 HINGGA TINGKAT 8
C. 1 TINGKAT KEMUDAHAN SOKONGAN YANG MENGANDUNGI DEWAN SERBAGUNA, GIMNASIUM DAN KOLAM RENANG DI TINGKAT 9

DI ATAS LOT 65797 SELUAS 8.707 EKAR, JALAN BUKIT JALIL INDAH, MUKIM PEKAN KINRARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : PACIFIC GREENVIEW SDN BHD
 
 

 

7. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN SERENTAK: PINDAAN KEBENARAN MERANCANG + PINDAAN PELAN LANDSKAP + PINDAAN PELAN ALAMAT

CADANGAN PEMBANGUNAN PANGSAPURI (988 UNIT) YANG MENGANDUNGI: -
A. 1 MENARA PANGSAPURI (288 UNIT) 34 TINGKAT DARI TINGKAT 3 HINGGA TINGKAT 36
B. 1 MENARA PANGSAPURI (349 UNIT) 33 TINGKAT DARI TINGKAT 5 HINGGA TINGKAT 37
C. 1 MENARA PANGSAPURI (351 UNIT) 33 TINGKAT DARI TINGKAT 5 HINGGA TINGKAT 37
D. TEMPAT LETAK KENDERAAN 1 TINGKAT DAN RUANG MEKANIKAL DAN ELEKTRIKAL DI TINGKAT SEPARA BAWAH TANAH DENGAN KEMUDAHAN PONDOK PENGAWAL, TEMPAT PEMBUANGAN SAMPAH, PETI SURAT, BILIK BACAAN DAN SURAU
E. PODIUM TEMPAT LETAK KENDERAAN 6 TINGKAT DARI TINGKAT 1 HINGGA TINGKAT 6
F. KEMUDAHAN-KEMUDAHAN LAIN: -
I) PEJABAT PENGURUSAN, TADIKA DAN PETI SURAT DI TINGKAT 1
II) RUANG AKTIVITI WARGA EMAS DI TINGKAT 2
III) DEWAN DAN LANDSKAP DI TINGKAT 7

PINDAAN MELIBATKAN PERKARA SEPERTI YANG BERIKUT:
A) PERTAMBAHAN RUANG LANTAI BERSIH DARI 880,497 KP KEPADA 881,211 KP
B) PENGURANGAN 1 UNIT KEDIAMAN IAITU DARIPADA 350 UNIT KEPADA 349 UNIT DARI TINGKAT 5 HINGGA TINGKAT 37 (MENARA B)
C) PERTAMBAHAN 1 UNIT KEDIAMAN IAITU DARIPADA 350 UNIT KEPADA 351 UNIT DARI TINGKAT 5 HINGGA TINGKAT 37 (MENARA C)
D) PERTAMBAHAN KELUASAN KAWASAN LAPANG DARIPADA 73,367 MP KEPADA 82,837 MP

SELUAS 8.06 EKAR, DI ATAS PT 7391 (LOT 102339), JALAN PUCHONG UTAMA 1, TAMAN PUCHONG UTAMA, 47140, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK: HILLCREST GARDENS SDN. BHD. (14015-T)
 
 

 

8. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI 1 UNIT KEDAI PEJABAT 2 1/2 TINGKAT SEDIA ADA KEPADA 3 TINGKAT DI ATAS PT 60864 (HSD 246206), NO.1, JALAN PUJ 3/10, TAMAN PUNCAK JALIL, BANDAR PUTRA PERMAI, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: INTRA DESIGN SDN BHD (163284-W)
 
 

 

9. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI BANGUNAN KE ATAS 1 UNIT KILANG TERES 1 1/2 TINGKAT YANG SEDIA ADA KEPADA 2 TINGKAT DI ATAS PT 24448, NO. 9, JALAN TPK 2/6, SEKSYEN 2, TAMAN PERINDUSTRIAN KINRARA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: FONG WENG HONG DAN SIEW BOON MENG
 
 

 

10. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN PEMBINAAN, MENYIAPKAN, UJIAN, BERTAULIAHAN DAN PENYELENGGARAAN MODUL KEEMPAT UNTUK LOGI RAWATAN KUMBAHAN (STP) DAN KERJA-KERJA RETIKULASI PAIP PAIP PEMBENTUNGAN UNTUK PEMBANGUNAN DI PUTRA HEIGHTS, MUKIM DAMANSARA, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : SIME DARBY PROPERTY (BUKIT RAJA) SDN BHD
 
 

 

11. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN PEMBANGUNAN SATU (1) BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN 37 TINGKAT YANG MENGANDUNGI:

A. 31 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (246 UNIT) DAN PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (62 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 37
B. 6 TINGKAT PODIUM YANG MENGANDUNGI:
I. 5 TINGKAT TEMPAT LETAK KERETA DARI TINGKAT 2 HINGGA TINGKAT 6
II. 1 TINGKAT KEMUDAHAN PENDUDUK SEPERTI TADIKA, SURAU (LELAKI DAN PEREMPUAN), KOLAM RENANG DEWASA, KOLAM RENANG KANAK-KANAK, GIMNASIUM, PEJABAT PENGURUSAN, RUANG DOBI, DEWAN SERBAGUNA, RUANG PETI SURAT, LOBI DAN KEBUK SAMPAH DI TINGKAT 1
C. 1 TINGKAT KEMUDAHAN PENDUDUK SEPERTI TAMAN PERMAINAN DAN RUANG BACAAN DI SEBAHAGIAN TINGKAT 7
D. 1 UNIT PONDOK PENGAWAL DI TINGKAT 1
DI ATAS LOT 62695 (GRN 335470), PERSIARAN PUTRA PERDANA, PUTRA HEIGHTS, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: SIME DARBY PROPERTY (BUKIT RAJA) SDN. BHD.
 
 

 

12. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN MEMBINA SEBUAH RUMAH SESEBUAH 2 TINGKAT DI ATAS LOT 77082, LORONG PPRT, KG. BUKIT LANCHONG, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: EN. MOHAMED RAZMAN BIN ROSLI.
 
 

 

13. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
4.14 KERTAS KERJA : 144/19/92/2024

PERMOHONAN SERENTAK: PINDAAN KEBENARAN MERANCANG + PINDAAN PELAN KERJA TANAH + PINDAAN JALAN DAN PERPARITAN + PINDAAN PELAN BANGUNAN + PINDAAN PELAN LANDSKAP + PINDAAN PELAN ALAMAT

CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN PERNIAGAAN (1,405 UNIT) YANG TERDIRI DARIPADA:
FASA 1A(I):
BLOK A:
A. SATU (1) BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN (639 UNIT) 40 TINGKAT DARI TINGKAT 1 HINGGA TINGKAT 40
B. PODIUM BANGUNAN 8 TINGKAT YANG MENGANDUNGI:
I. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI 1 UNIT SURAU (LELAKI DAN PEREMPUAN), 1 UNIT KOLAM RENANG DEWASA, 1 UNIT KOLAM RENANG KANAK-KANAK, 1 UNIT BILIK PERSALINAN (LELAKI DAN PEREMPUAN), 1 UNIT PEJABAT PENGURUSAN, 1 UNIT DEWAN SERBAGUNA, 1 UNIT GIMNASIUM, 1 UNIT BILIK BACAAN/PERPUSTAKAAN MINI, 1 UNIT KIOSK/DOBI, KAWASAN LANDSKAP DAN TAMAN PERMAINAN DI TINGKAT 8
II. TEMPAT LETAK KENDERAAN DARI TINGKAT 1 HINGGA TINGKAT 7
III. KEMUDAHAN PENDUDUK YANG MENGANDUNGI 1 UNIT TADIKA, 1 UNIT TASKA DI TINGKAT 2, 2 UNIT BILIK PETI SURAT, 1 UNIT KEBUK SAMPAH, 1 UNIT TAMAN PERMAINAN, 1 UNIT KAFETERIA DAN SEBAHAGIAN TEMPAT LETAK KERETA DI TINGKAT 1
C. 8 UNIT KEDAI SERBANEKA DI TINGKAT 1
D. 2 UNIT PONDOK PENGAWAL
FASA 1A(II):
BLOK B:
A. SATU (1) BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN (766 UNIT) 32 TINGKAT DARI TINGKAT 9 HINGGA TINGKAT 40 SELUAS 6.174 EKAR, DI ATAS PT 83581, JALAN HORIZON 1, PUCHONG HORIZON, PUCHONG, MUKIM, PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : BISON HOLDINGS SDN. BHD. (55225-M)
 
 

 

14. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT KILANG SESEBUAH 1 TINGKAT BESERTA 3 TINGKAT PEJABAT SEDIADA KEPADA :
1. 1 TINGKAT KILANG DI TINGKAT 1
2. 1 TINGKAT GUDANG DI TINGKAT 2
3. 1 TINGKAT PEJABAT DI TINGKAT 3
DI ATAS LOT 19, NO.4, JALAN BK 1/15, BANDAR KINRARA, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK TETUAN ALL IT HYPERMARKET SDN. BHD.
 
 

 

15. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN SERENTAK : KEBENARAN MERANCANG + PELAN KERJA TANAH + PELAN JALAN DAN PERPARITAN + PELAN BANGUNAN + PELAN LANDSKAP + PELAN ALAMAT + PERMIT SEMENTARA (HOARDING)

CADANGAN PANGSAPURI YANG MENGANDUNGI:
A. MENARA A - 25 TINGKAT PANGSAPURI YANG MENGANDUNGI:
I. 1 TINGKAT RUANG ’SKY LOUNGE’ DI ARAS BUMBUNG
II. 24 TINGKAT PANGSAPURI HARGA BEBAS YANG TERDIRI DARIPADA 216 UNIT DI ARAS 9-ARAS 32
B. MENARA B - 32 TINGKAT PANGSAPURI YANG MENGANDUNGI:
I. 16 TINGKAT PANGSAPURI HARGA BEBAS YANG TERDIRI DARIPADA 112 UNIT DI ARAS 17-ARAS 32
II. 16 TINGKAT PANGSAPURI RUMAH SELANGORKU (MAMPU MILIK) YANG TERDIRI DARIPADA 82 UNIT DI ARAS 1-ARAS 16
C. 8 TINGKAT PODIUM YANG MENGANDUNGI:
I. DEWAN SERBAGUNA, GIMNASIUM, BILIK WARGA EMAS, BILIK MEMBACA, DOBI, KOLAM RENANG, TANDAS DAN BILIK PERSALINAN SERTA TAMAN PERMAINAN DI ARAS 7
II. 6 TINGKAT RUANG TEMPAT LETAK KERETA DAN MOTORSIKAL DI ARAS 1-ARAS 6
III. SURAU, RUANG JENAZAH, TANDAS, PETI SURAT, PEJABAT PENGURUSAN DAN KEBUK SAMPAH DI ARAS 1
IV. TADIKA DI ARAS TANAH
D. 1 UNIT PONDOK PENGAWAL DI ARAS TANAH
DI ATAS PT 83584, JALAN DAMAI UTAMA 8, TAMAN DAMAI UTAMA, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: RELIANCE PARTNERS SDN. BHD
 
 

 

16. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT KILANG TERES 1 TINGKAT SEDIA ADA KEPADA 2 TINGKAT BESERTA 1 TINGKAT MEZZANINE DI ATAS LOT 2907, NO.2, JALAN UTAMA 2/14, TAMAN PERINDUSTRIAN PUCHONG UTAMA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: HOR NIEW POH DAN BEH FONG WONG
 
 

 

17. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN MEROBOH DAN MEMBINA SEMULA 1 UNIT RUMAH TERES (CORNER LOT) 2 TINGKAT SEDIADA DI ATAS LOT 10872, NO 9, JALAN SS 19/1K, SS19, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: NG AIK SERN DAN KYO VOON JET
 
 

 

18. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN SERENTAK : PELAN KERJA TANAH + PELAN JALAN DAN PERPARITAN

CADANGAN MEMBINA 1 UNIT KILANG DAN GUDANG 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT SELUAS 1.000 EKAR. DI ATAS LOT 118079, JALAN BP 4/8, BANDAR BUKIT PUCHONG, MUKTM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : UNITY PROPERTY SDN. BHD.
 
 

 

19. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN MEMBINA 1 UNIT KILANG SESEBUAH 4 TINGKAT YANG MENGANDUNGI :-
A. PEJABAT DAN BILIK UTILITI DI TINGKAT TIGA.
B. PEJABAT, GUDANG DAN KILANG DI TINGKAT DUA.
C. KILANG DAN KANTIN DI TINGKAT SATU.
D. PEJABAT, KILANG DAN TEMPAT MELETAK KENDERAAN DI TINGKAT BAWAH.
E. 1 UNIT PONDOK PENGAWAL.
F. 1 UNIT TEMPAT PEMBUANGAN SAMPAH.
G. 1 UNIT PENCAWANG ELEKRIK PADAT.
SELUAS 1.000 EKAR. DI ATAS LOT 118079, JALAN BP 4/8, BANDAR BUKIT PUCHONG,MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK TETUAN HIGH VALLEY CONTRACT MANUFACTURING ( GMP ) SDN. BHD.

KEPADA 1 UNIT KILANG DAN GUDANG 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT.

SELUAS 1.000 EKAR. DI ATAS LOT 118079, JALAN BP 4/8, BANDAR BUKIT PUCHONG,MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : UNITY PROPERTY SDN. BHD.
 
Oleh
UNTUK : UNITY PROPERTY SDN. BHD.
 
 

 

20. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN KEBENARAN MERANCANG DAN PENYERAHAN BALIK DAN PEMBERIMILIKAN SEMULA TANAH DI BAWAH SEKSYEN 204B, KANUN TANAH NEGARA 1965 (AKTA 56) BAGI CADANGAN PEMBANGUNAN YANG MENGANDUNGI:

A) 2 PLOT (4 UNIT) RUMAH BANDAR BERSTRATA 2 TINGKAT JENIS A BERSAIZ 25.8'X72'
B) 13 PLOT (26 UNIT) RUMAH BANDAR BERSTRATA 2 TINGKAT JENIS B BERSAIZ 25.5'X72'
C) 2 UNIT RUMAH TERES 2 TINGKAT BERSAIZ 30'X72'

DI ATAS LOT 2291 (GM 577) SELUAS 2.094 EKAR, JALAN MAKMUR, SEKSYEN 5, TAMAN SERDANG HEIGHTS, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: BINAAN MAJU R & M SDN. BHD.
 
 

 

21. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK : KEBENARAN MERANCANG + PELAN KERJA TANAH + PELAN JALAN DAN PERPARITAN + PELAN BANGUNAN + PELAN LANDSKAP + PELAN ALAMAT

CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN (307 UNIT) 30 TINGKAT YANG MENGANDUNGI:
A. 21 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (246 UNIT) DAN PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (61 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 30
B. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI KOLAM RENANG, BILIK SERBAGUNA, GIMNASIUM, BILIK PERMAINAN, PEJABAT PENGURUSAN, SURAU (LELAKI DAN PEREMPUAN) DAN TAMAN PERMAINAN DI TINGKAT 9
C. 5 TINGKAT PODIUM TEMPAT LETAK KENDERAAN DARI TINGKAT 4 HINGGA TINGKAT 8
D. 3 TINGKAT KEDAI (67 UNIT) DARI TINGKAT 1 HINGGA TINGKAT 3
E. 1 TINGKAT KEMUDAHAN YANG MENGANDUNGI TADIKA, PEJABAT PENGURUSAN, PEJABAT PERSENDIRIAN, BILIK PETI SURAT DAN BILIK PENGAWAL DI TINGKAT 2
F. KEBUK SAMPAH DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 1
DI ATAS HAK MILIK H.D.(D) 259806 (PT 1971), SELUAS 1.40 EKAR, BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: PILIHAN MEGAH SDN. BHD.
 
 

 

22. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT KILANG BERKEMBAR 1 1/2 TINGKAT SEDIA ADA KEPADA 2 TINGKAT DI ATAS LOT 473 & LOT 474, NO. 10 & 12, JALAN TPP 5/8, TAMAN PERINDUSTRIAN PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: LIFTECH ENGINEERING (KL) SDN. BHD.
 
 

 

23. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI BANGUNAN KE ATAS KILANG TERES 1 ½ TINGKAT YANG SEDIA ADA DI ATAS LOT 34499 & (NO.37) DAN LOT 34500 (NO.39), JALAN INDAH 2/14, TAMAN UNIVERSITI INDAH, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: CHANG KAM TOH, LEE YOKE NAN & LEE CHEE HOE
 
 

 

24. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS RUMAH TERES 2 1/2 TINGKAT YANG SEDIADA KEPADA 3 TINGKAT DI ATAS LOT 79743, NO. 17 JALAN USJ HEIGHTS 4/2A, USJ HEIGHTS, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: ENCIK SER AH CHING & PUAN SER SUK YEE
 
 

 

25. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK : PINDAAN KEBENARAN MERANCANG + PINDAAN PELAN BANGUNAN

CADANGAN 1 BLOK PANGSAPURI HARGA BEBAS (540 UNIT) YANG MENGANDUNGI:
A) MENARA A - 27 TINGKAT PANGSAPURI HARGA BEBAS (270 UNIT) DARI TINGKAT 5 HINGGA TINGKAT 31
B) MENARA B - 28 TINGKAT PANGSAPURI HARGA BEBAS (270 UNIT) DARI TINGKAT 6 HINGGA TINGKAT 32
C) ROOF GARDEN DI TINGKAT 32 DAN TINGKAT 33
D) 4 TINGKAT PODIUM YANG MENGANDUNGI:
I. 4 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 1 HINGGA TINGKAT 4
II. KEMUDAHAN PENDUDUK IAITU 1 UNIT SURAU (LELAKI DAN PEREMPUAN), 1 UNIT PEJABAT PENGURUSAN, 1 UNIT TADIKA, 2 UNIT KEDAI SERBANEKA, 2 UNIT BILIK PETI SURAT DAN 1 UNIT DOBI DI SEBAHAGIAN TINGKAT 1
III. KEMUDAHAN PENDUDUK IAITU 1 UNIT KOLAM RENANG DEWASA, 1 UNIT KOLAM RENANG KANAK-KANAK, 1 UNIT GIMNASIUM, 1 UNIT BILIK BACAAN, 1 UNIT DEWAN SERBAGUNA DAN TAMAN PERMAINAN DI SEBAHAGIAN TINGKAT 5
E) 3 TINGKAT SEPARA TANAH YANG MENGANDUNGI TEMPAT LETAK KENDERAAN, 1 UNIT KEBUK SAMPAH DAN RUANG M&E DARI TINGKAT LG1 HINGGA LG3
F) 1 UNIT PONDOK PENGAWAL
DI ATAS PT 83475, SELUAS 4.56 EKAR, JALAN BS 2/1, SEKSYEN 2, TAMAN BUKIT SERDANG, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN

- PINDAAN MELIBATKAN:
A. PERUBAHAN KELUASAN LANTAI BAGI UNIT PANGSAPURI HARGA BEBAS DARIPADA 860KP KEPADA 897KP.
 
Oleh
UNTUK: UNI VISTA SDN. BHD.
 
 

 

26. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK: KEBENARAN MERANCANG (TAMBAHAN DAN UBAHSUAI) + PELAN BANGUNAN

CADANGAN MEROBOH RUMAH TERES 2 TINGKAT SEDIA ADA DAN MEMBINA SEMULA RUMAH TERES 2 TINGKAT DI ATAS LOT 42771, NO 27, JALAN USJ 11/4H, UEP SUBANG JAYA, 47500 SUBANG JAYA, PEKAN SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : LEE KOK SEM
 
 

 

27. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK : KEBENARAN MERANCANG + PELAN BANGUNAN + PELAN PERMIT SEMENTARA (HOARDING)

CADANGAN MEROBOH DAN MEMBINA SEMULA 1 UNIT RUMAH SESEBUAH 2 TINGKAT SEDIA ADA KEPADA 3 TINGKAT DI ATAS PT 20247 (HSD 4439), NO. 11, JALAN TUJUH, TAMAN BUKIT KUCHAI, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: WAN ERN HUI.
 
 

 

28. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK : PELAN KERJA TANAH + PELAN JALAN DAN PERPARITAN

CADANGAN MEROBOH DAN MEMBINA SEMULA RUMAH SESEBUAH 1 TINGKAT DI ATAS LOT 28822, JALAN ENAM, TAMAN TENAGA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : LOI SHIAO KIANG DAN LEE HUNG JIEW
 
 

 

29. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK : PELAN JALAN DAN PERPARITAN + PELAN BANGUNAN + PERMIT SEMENTARA

CADANGAN MEMBINA 1 UNIT GUDANG 3 TINGKAT, 1 UNIT PONDOK PENGAWAL DAN 1 UNIT KEBUK SAMPAH DI ATAS PT 39494 (HSD 121074) NO. 4, JALAN INDUSTRI PBP 9, TAMAN INDUSTRI PUSAT BANDAR PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : MST STAINLESS STEEL SDN. BHD.
 
 

E. PEMBENTANGAN PERMOHONAN KEBENARAN MERANCANG

 

30. 5.1 KERTAS KERJA BIL. : 232/82/17/2025

 
PERMOHONAN SERENTAK KEBENARAN MERANCANG PENDIRIAN BANGUNAN SERTA MENYERAH BALIK DAN PEMBERIMILIKAN SEMULA TANAH DI BAWAH SEKSYEN 204B, KANUN TANAH NEGARA 1965 BAGI CADANGAN PEMBANGUNAN SEBUAH BANGUNAN KOMERSIAL 16 TINGKAT YANG MENGANDUNGI:
1) 5 UNIT PUSAT PAMERAN, JUALAN DAN SERVIS (3S) KENDERAAN (ARAS 1, ARAS 5 HINGGA ARAS 8)
2) 5 UNIT RUANG SERVIS KENDERAAN. (ARAS 9 HINGGA ARAS 12)
3) 11 UNIT LOT KOMERSIAL. (ARAS 3 HINGGA ARAS 7)
4) 1 UNIT RUANG PEJABAT "PENTHOUSE" 3 TINGKAT. (ARAS 14 HINGGA 16)
5) 3 TINGKAT PODIUM LETAK KERETA. (ARAS 1 HINGGA ARAS 3)
6) 4 TINGKAT TEMPAT LETAK MOTOSIKAL. (ARAS 8 HINGGA ARAS 10 DAN ARAS 12)
7) 1 UNIT PENCAWANG ELEKTRIK PADAT. (ARAS 1)
DIATAS LOT 4868 & 4869, JALAN SS12/4, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : GB MOTORS REALTY SDN BHD
 
 

 

31. 5.2 KERTAS KERJA BIL. : 233/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG ROBOH BANGUNAN BAGI GUDANG SESEBUAH SATU TINGKAT DI ATAS LOT 541, JALAN SUBANG 2, TAMAN PERINDUSTRIAN SUBANG USJ 1, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK SDB SUBANG DEVELOPMENT SDN. BHD. (1335702 - V)
 
Oleh
SDB SUBANG DEVELOPMENT SDN. BHD. (1335702 - V)
 
 

 

32. 5.4 KERTAS KERJA BIL. : 235/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERINDUSTRIAN (KILANG TERES) KEPADA PUSAT MAKANAN (RESTORAN) DI ATAS PT. 1755 (HSD 116100), NO. 66, JALAN PJS 11/7, BANDAR SUNWAY, 47500 SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : GOLDEN FOOD TRUCK GROUP SDN. BHD. (1109741-U)
 
 

 

33. 5.5 KERTAS KERJA BIL. : 236/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERINDUSTRIAN (KILANG TERES) KEPADA RESTORAN DI ATAS PT 1637, NO. 21, JALAN PJS 11/16, BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : LOYAL 7 ASIA SDN. BHD. (1282994-X)
 
 

 

34. 5.6 KERTAS KERJA BIL. : 237/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERNIAGAAN KEPADA ASRAMA PEKERJA KE ATAS KEDAI PEJABAT 3 TINGKAT SEDIA ADA (UNIT NO. 34 TINGKAT 2 DAN UNIT NO. 36 TINGKAT 1 DAN 2) DI ATAS LOT 8093 (GN 298192) & LOT 8094 (GN 298193), DI ALAMAT NO. 34 & 36, JALAN SS15/4, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : DATUK TOH YU HUAT
 
 

 

35. 5.7 KERTAS KERJA BIL. : 238/82/17/2025

 
PERMOHONAN PINDAAN KEPADA PELAN LULUS NAMA BANGUNAN DAN PELAN ALAMAT (NO. FAIL:MBSJ.JPB.BP1.600-1/8/98) BERTARIKH 21 MEI 2025 BAGI CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI PERKHIDMATAN YANG MENGANDUNGI :
A) PANGSAPURI PERKHIDMATAN 22 TINGKAT (242 UNIT) YANG TERDIRI DARIPADA;
I. 16 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (48 UNIT) JENIS A [600KP] DI
TINGKAT 9 HINGGA TINGKAT 24;
II. 194 UNIT PANGSAPURI PERKHIDMATAN;
- 18 UNIT JENIS B [600KP] DARI TINGKAT 25 HINGGA TINGKAT 30;
- 88 UNIT JENIS C [880KP ], 44 UNIT JENIS D [1050KP] DAN 44 UNIT JENIS E [1500KP ] DARI TINGKAT 9
HINGGA TINGKAT 30;
B) RUANG PERNIAGAAN DI TINGKAT 1;

DI ATAS LOT PT 389 (LOT 74782), JALAN PJS 9/1, PJS 9, BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN : COLLECTIV HOME SDN. BHD.
 
 

 

36. 5.8 KERTAS KERJA BIL. : 239/82/17/2025

 
PERMOHONAN PINDAAN KEBENARAN MERANCANG (PELAN SUSUNATUR YANG TELAH DILULUSKAN NO. RUJUKAN: MPSJ.PS(C).260/1/662 BERTARIKH 18 NOVEMBER 2015)
1. PERUMAHAN STRATA PETAK BERTANAH
2. PERUMAHAN STRATA BERTINGKAT (APARTMENT)
3. RUMAH SELANGORKU
4. PLOT PERNIAGAAN
DI ATAS LOT 92345, LOT 92346 DAN LOT 92347, PUTRA HEIGHTS, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK MARVELANE HOME SDN. BHD.
 
 

 

37. 5.10 KERTAS KERJA BIL. : 241/82/17/2025

 
PERMOHONAN KELULUSAN PELAN ALAMAT ( NAMA TAMAN, NAMA BANGUNAN, NAMA JALAN DAN NOMBOR BANGUNAN ) BAGI CADANGAN MEMBINA SATU (1) UNIT GUDANG YANG MENGANDUNGI :
A. GUDANG DI TINGKAT 1
B. PEJABAT DI TINGKAT 1 HINGGA TINGKAT 2
C. 1 UNIT PONDOK PENGAWAL
D. 1 UNIT PENCAWANG ELEKTRIK PADAT
E. 1 UNIT KEBUK SAMPAH
F. 1 UNIT BILIK PAM DAN TANGKI BOMBA
DI ATAS PT 34442, JALAN PERINDUSTRIAN PUCHONG, BANDAR METRO PUCHONG, PUCHONG, MUKIM PETALING, DAERAH PETALING,
SELANGOR DARUL EHSAN
 
Oleh
UNTUK : GRAND MAGNITUDE DEVELOPMENT SDN. BHD.
 
 

 

38. 5.12 KERTAS KERJA BIL. : 243/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN LELANGIT 4 MUKAAN BERUKURAN 9M (T) X 9.81M (L) (29.52’ X 32.18’) YANG DIDIRIKAN DI ATAS BUMBUNG BANGUNAN KOMPLEKS PERNIAGAAN (AEON) DI ATAS SEBAHAGIAN LOT 95272 (PN 79952), PERSIARAN LESTARI PERDANA 1, TAMAN EQUINE, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : AEON CO. (M) BERHAD.
 
 

 

39. 5.13 KERTAS KERJA BIL. : 244/82/17/2025

 
PINDAAN KEPADA PELAN LULUS BERTARIKH 12 FEBRUARI 2018 FAIL NO. MPSJ.JPB.BP6.600-1/8/17/PA BAGI CADANGAN PEMBANGUNAN 3 BLOK PANGSAPURI YANG MENGANDUNGI :-
A. 6 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT BAWAH HINGGA TINGKAT 5
B. KEMUDAHAN PENDUDUK SEPERTI JANITOR, BILIK PERSALINAN, KOLAM RENANG, JACUZZI, RUANG TERBUKA PERMAINAN KANAK-KANAK, RUANG BBQ, SEPARUH GELANGGANG BOLA KERANJANG DAN RUANG YOGA DI TINGKAT 6
C. KEMUDAHAN PENDUDUK SEPERTI GIMNASIUM, DEWAN SERBAGUNA DAN RUANG UTILITI DI TINGKAT 5
D. KEMUDAHAN PENDUDUK SEPERTI SURAU, TADIKA DAN BILIK BACAAN DI TINGKAT 3
E. BILIK 'HOUSE KEEPING' DI TINGKAT 2
V. 1 UNIT PONDOK PENGAWAL, 1 UNIT KEBUK SAMPAH BERPUSAT, BILIK PENGURUSAN (MC) DAN BILIK RAKAMAN CCTV DI TINGKAT BAWAH
VI. 1 UNIT PENCAWANG ELEKTRIK DI TINGKAT 4

DI ATAS LOT PT83055 (DAHULUNYA LOT 86248 DAN LOT 86249), TAMAN MUTIARA INDAH, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK DARUL OMNI SDN. BHD.
 
 

 

40. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN PERMIT MEROBOH SEBUAH BANGUNAN RUMAH SESEBUAH 2 TINGKAT SEDIA ADA DI ATAS SEBAHAGIAN RIZAB JALAN 50’, LOT PT 1384, PT 1385, PT 1386, PT 1387, PT 1388 & PT 1389, PERSIARAN WANGSA BAIDURI 7, TAMAN WANGSA BAIDURI, SS 12, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: SHAREEN BINTI DATUK SERI MOHAMED IQBAL
 
 

 

41. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU UNIT STRUKTUR PAPAN IKLAN "UNIPOLE"3 MUKAAN YANG BERUKURAN 30 KAKI (P) X 80 KAKI (L) DI ATAS SEBAHAGIAN TANAH KERAJAAN LOT 6757, (RIZAB KAWASAN LAPANG), DI ANTARA PERSIMPANGAN JALAN SUBANG UTAMA DAN PERSIARAN TUJUAN, SS 18, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN : KEYSPAN EXPRESS SDN BHD
 
 

 

42. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN "MINIPOLE" BERUKURAN 30'(P) X 20'(L) (1 MUKAAN)
SECARA MENEGAK DI ATAS SEBAHAGIAN RIZAB JALAN, DI PERSIARAN JALAN JENGKA / JALAN KEMAJUAN SUBANG (BERSEBELAHAN JALAN SS 15/1 A), SS15, SUBANG JAYA,
MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
GPS: 3.08228,101.584905
 
Oleh
UNTUK: BESTARI MEDIA SDN. BHD.
 
 

 

43. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN JENIS DIGITAL LED 1 MUKAAN SECARA MELINTANG YANG BERUKURAN 75.6 KAKI (P) X 31.5 KAKI (L), PADA DINDING BANGUNAN CASA SQUARE DI ATAS LOT 1716 (PT 17400), LEBUHRAYA DAMANSARA PUCHONG (LDP), BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN : KEYSPAN EXPRESS SDN BHD
 
 

 

44. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL TANAH TEMPOH TERHAD UNTUK KEGUNAAN SEBAGAI TEMPAT MELETAK KENDERAAN BERAT DI ATAS LOT 75123, JALAN TP 7/7, TAMAN PERINDUSTRIAN UEP, SUBANG JAYA, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : SLC LOGISTIC & DISTRIBUTION SDN BHD
 
 

 

45. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN KEBENARAN MERANCANG TEMPOH TERHAD BAGI CADANGAN PERMIT SEMENTARA BAGI MEMBINA SATU (1) UNIT STRUKTUR TELEKOMUNIKASI 4G JENIS PYLON BERKETINGGIAN 30 METER DI ATAS SEBAHAGIAN LOT 98918 (3.002694, 101.715389), DI KAWASAN PARKING LOT MASJID UPM, UNIVERSITI PUTRA MALAYSIA, 43400 SERDANG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
BAGI
 
Oleh
OMNIX (M) SDN. BHD.
 
 

 

46. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KILANG SESEBUAH KEPADA PUSAT MAKANAN (CAFÉ/RESTORAN), DI ALAMAT NO 7 JALAN SS 13/6B, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : BEAN DOE ASIA SDN. BHD. (1573872-U)
 
 

 

47. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KEDAI PEJABAT KEPADA ASRAMA PEKERJA (DORMITORI) DI ATAS PT35515, NO. 68-2, JALAN TP 7/2, TAMAN PERINDUSTRIAN UEP, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : KILAT JALUR SDN. BHD. (731403-T)
 
 

 

48. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN SERENTAK SERAH BALIK DI BAWAH SEKSYEN 197 DAN BERIMILIK SEMULA TANAH DIBAWAH SEKSYEN 76, KANUN TANAH NEGARA DAN PINDAAN KEBENARAN MERANCANG PELAN SUSUNATUR YANG TELAH DILULUSKAN (NO. RUJUKAN: MPSJ.JBP.BP3.600-1/ 1/ 25/PS BERTARIKH 28 SEPTEMBER 2022), BAGI CADANGAN PEMBANGUNAN YANG MENGANDUNGI:

PINDAAN MELIBATKAN PERKARA-PERKARA BERIKUT:

I. MENGURANGKAN UNIT RUMAH SESEBUAH DARIPADA 100 UNIT KEPADA 97 UNIT DI ATAS LOT 36023, LOT 36038 DAN LOT 36039
II. MENGURANGKAN UNIT RUMAH BERKEMBAR DARIPADA 174 UNIT KEPADA 138 UNIT DI ATAS LOT 36001 HINGGA LOT 36022, LOT36024 HINGGA 36037
III. PINDAAN 3 UNIT RUMAH SESEBUAH DAN 36 UNIT RUMAH BERKEMBAR KEPADA 1 LOT PEMBANGUNAN AKAN DATANG (KEDIAMAN)

DI ATAS PT 36001 HINGGA PT 36039, KINGLEY HILLS, PUTRA HEIGHTS, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: KINGSLEY HILLS SDN. BHD.
 
 

 

49. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN 1 UNIT STRUKTUR PAPAN IKLAN BILLBOARD 1 MUKAAN YANG BERUKURAN 26' (P) X 20.8' (L) SECARA MELINTANG DI ATAS BUMBUNG BANGUNAN PASARAYA HERO 1 TINGKAT BESERTA MEZZANINE 1 TINGKAT SEDIA ADA DI ATAS PT 72549 (HSD 296200), JALAN PUTERI 1/1, BANDAR PUTERI, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK MY HERO HYPERMARKET SDN. BHD. (676676-T)
 
 

 

50. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MENDIRIKAN SATU (1) UNIT STRUKTUR PAPAN IKLAN 'UNIPOLE' 2 MUKAAN (SEDIA ADA) BERUKURAN 60' (P) X 40' (L) SECARA MENEGAK DI ATAS SEBAHAGIAN TANAH KERAJAAN (ZON PENAMPAN) KM 24.10, BANDAR PUTERI, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : MEDIAHOUSE SDN. BHD.
 
 

 

51. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KEDAI PEJABAT KEPADA HOTEL (45 BILIK) DI NO 32 (PT 78814), 34 (PT 78815), 36(PT 78816) & 38(PT 78817), JALAN EQUINE 1E, TAMAN EQUINE, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK
 
Oleh
TETUAN : NATURE STAY SDN. BHD
 
 

 

52. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KOMPLEKS PERNIAGAAN KEPADA HOTEL (140 BILIK) DI ARAS BAWAH, ARAS 3 & ARAS 4, KOMPLEKS PERNIAGAAN MINES 2, DI ATAS LOT 1584 (57732), JALAN BALAKONG, THE MINES RESORT CITY, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : ASTRAL INFINITY SDN BHD
 
 

F. PEMBENTANGAN PERMOHONAN PELAN KERJA TANAH

 

53. 6.1.1 KERTAS MESYUARAT : 74/83/17/2025

 
CADANGAN KELULUSAN PELAN KERJA TANAH BAGI CADANGAN MEMBINA SEBUAH RUMAH BANGLO 2 TINGKAT DI ATAS PT80784 (HSD 283755), NO. 28, JALAN LP 2/1, TAMAN LESTARI PERDANA, BANDAR PUTRA PERMAI, 43300 SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN
PUAN LIM CHAI HOON DAN ENCIK YUEN YEOW TEAM
 
 

 

54. 6.1.2 KERTAS MESYUARAT : 75/83/17/2025

 
PERMOHONAN PINDAAN PELAN KELULUSAN KERJA TANAH KEPADA FAIL LULUS MBSJ.KEJ.600-1/19/154(10) BERTARIKH 14 NOVEMBER 2024 BAGI PEMBANGUNAN:
CADANGAN MEMBINA PANGSAPURI YANG MENGANDUNGI:-
A. MENARA A - 28 TINGKAT PANGSAPURI HARGA BEBAS (418 UNIT)
B. MENARA B – 10 TINGKAT PANGSAPURI RUMAH SELANGORKU JENIS TRIO (108 UNIT)
C. 4 TINGKAT PODIUM TEMPAT LETAK KERETA DARI ARAS BAWAH (G) SEHINGGA ARAS 4 DAN 3 TINGKAT TEMPAT LETAK KERETA ARAS SEPARA BAWAH TANAH DARI LG1 SEHINGGA LG3
D. KEMUDAHAN SEPERTI DEWAN SERBAGUNA, PEJABAT PENGURUSAN, GIMNASIUM, KOLAM RENANG, DOBI DAN KEDAI DI ARAS 4, TADIKA DAN SURAU DI ARAS LG3
E. 1 UNIT PONDOK PENGAWAL
F. 1 UNIT RUMAH SAMPAH, PEMBUANGAN SISA PUKAL DAN KITAR SEMULA
DI ATAS LOT 3510 SELUAS 5.000 EKAR, JALAN BS 5/27, SEKSYEN 2, TAMAN BUKIT SERDANG, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: PREMIEREX SDN BHD
 
 

 

55. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN PELAN KERJATANAH BAGI CADANGAN MEMBINA SEBUAH RUMAH SESEBUAH 3 TINGKATDI ATAS LOT PT 23126, NO 1, JALAN PUTRA HARMONI 1/1, PUTRA HEIGHTS, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING SELANGOR DARUL EHSAN UNTUK
 
Oleh
SEOW PONG CHEE & SEOW DING YI
 
 

G. PEMBENTANGAN PERMOHONAN PELAN JALAN DAN PERPARITAN

 

56. 6.2.1 KERTAS MESYUARAT : 76/83/17/2025

 
PERMOHONAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN MENDIRIKAN BANGUNAN SEMENTARA PUSAT SUKAN ‘PICKLEBALL’ YANG TERDIRI:
A. 3 UNIT GELANGGANG PADEL BERBUMBUNG
B. 4 UNIT GELANGGANG PICKLEBALL TERBUKA
C. 7 UNIT GELANGGANG PICKLEBALL BERBUMBUNG
DI ATAS SEBAHAGIAN TAMAN TASIK SUBANG RIA, LOT 17394, JALAN SS 12/1, SS12, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: GAMEON ATHLETICS SDN. BHD.
 
 

 

57. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN KELULUSAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN MEMBINA SEBUAH GUDANG 1 TINGKAT SEDIA ADA YANG MENGANDUNGI:
1. 1 TINGKAT GUDANG DI ARAS 1 SEDIA ADA
2. 2 TINGKAT PEJABAT DI ARAS 2 DAN 3 SEDIA ADA
3. SEBUAH STESEN SUB-TNB SEDIA ADA
4. SEBUAH PONDOK PENGAWAL KESELAMATAN SEDIA ADA
DI ATAS LOT 91574, JALAN SUBANG 7, TAMAN PERINDUSTRIAN SUBANG USJ1 UEP, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK: WAHFUNG CONSTRUCTION SDN BHD
 
 

 

58. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN PINDAAN PELAN JALAN DAN PERPARITAN (PELAN YANG TELAH DILULUSKAN MBSJ.KEJ.600-1/20/74(9) BERTARIKH 13 NOVEMBER 2025) BAGI CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI HARGA BEBAS 17 TINGKAT YANG MENGANDUNGI:
A. 10 BLOK PANSAPURI (216 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 16
B. 1 UNIT BILIK KOMPUTER, BILIK BACAAN DAN RUANG AKTIVITI TERBUKA DI TINGKAT 7
C. 1 TINGKAT RUANG KEMUDAHAN YANG MENGANDUNGI: GIMNASIUM, DEWAN SERBAGUNA, BILIK PERSALINAN, RUANG DOBI, KOLAM RENANG, YOGA DECK, PEJABAT PENGURUSAN, RUANG AKTIVITI WARGA EMAS DAN BILIK PERMAINAN DI TINGKAT 6
D. 5 TINGKAT PODIUM TEMPAT LETAK KERETA DARI TINGKAT 1 HINGGA TINGKAT 5
E. 1 UNIT TADIKA, RUANG LOBI, DROP-OFF AREA, BILIK PETI SURAT, BILIK KAWALAN KEBAKARAN, GERAI, SURAU (L), SURAU (P), BILIK PENGURUSAN JENAZAH, REFUSE CHAMBER DAN RUANG UTILITI DI TINGKAT 1
F. 1 UNIT PONDOK PENGAWAL
DI ATAS PT 16028, JALAN TK 1/13, TAMAN KINRARA SEKSYEN 1, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: JRK LAND SDN BHD (NO SYARIKAT: 114325-M)
 
 

 

59. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN KELULUSAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN MEMBINA RUMAH TERES YANG MENGANDUNGI:

FASA 2 (FASA 1B):

1. 132 UNIT RUMAH TERES 3 TINGKAT DI ATAS LOT 64419 – LOT 64550

FASA 3 (FASA 1B):

1. 86 UNIT RUMAH TERES 2 TINGKAT (20’ X 70’) FASA 3 (FASA 1B) DI ATAS LOT 64699 HINGGA LOT 64756.

FASA 4 (FASA 1B):

1. CADANGAN PEMBANGUNAN 91 UNIT RUMAH TERES 2 TINGKAT (20’ X 70’) FASA 4 (FASA 1B) DI ATAS LOT 64580 HINGGA LOT 64670

JALAN PUCHONG LEGENDA, TAMAN PUCHONG LEGENDA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: HUGES DEVELOPMENT SDN BHD.
 
 

 

60. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN PINDAAN PELAN JALAN DAN PERPARITAN BAGI:-
CADANGAN MEMBINA 1 BLOK PANGSAPURI HARGA BEBAS (437 UNIT) 36 TINGKAT YANG MENGANDUNGI:
A. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI ROOFTOP GARDEN DAN UTILITI DI SEBAHAGIAN TINGKAT 36
B. 32 TINGKAT PANGSAPURI HARGA BEBAS (437 UNIT) DARI ARAS 5 HINGGA ARAS 36
C. 5 TINGKAT PODIUM YANG MENGANDUNGI:
I. 4 TINGKAT KEMUDAHAN SOKONGAN PENDUDUK IAITU 1 UNIT DEWAN SERBAGUNA, 1 UNIT PERPUSTAKAAN/ BILIK BACAAN, 1 UNIT DOBI, 1 UNIT GIMNASIUM, 1 UNIT GELANGGANG SUKAN, RUANG KIOSK DAN SKY GARDEN DARI ARAS 4 HINGGA ARAS 7
II. KEMUDAHAN PENDUDUK IAITU 1 UNIT KOLAM RENANG DEWASA, 1 UNIT KOLAM RENANG
DI ATAS PT 60227, PERSIARAN PUNCAK JALIL, BANDAR PUTRA PERMAI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: UNION UNITED DEVELOPMENT SDN. BHD. (1337063-D)
 
 

 

61. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN KELULUSAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN KERJA-KERJA MENAIKTARAF DAN PELEBARAN JALAN LAGON SELATAN DARI SUSUR MASUK LEBUHRAYA DAMANSARA PUCHONG (LDP) HINGGA PERSIMPANGAN PERSIARAN KEWAJIPAN DAN CADANGAN PEMBINAAN PERSIMPANGAN BERTINGKAT DI PERSIARAN KEWAJIPAN DARI ARAH JALAN LAGOON SELATAN KE SUBANG KELANA JAYA LINK BESERTA PERSIMPANGAN BERTINGKAT PUSING BALIK (ELEVATED U-TURN) DI JALAN LAGOON SELATAN, SS13, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING JAYA, SELANGOR DARUL EHSAN
 
Oleh
UNTUK TETUAN SUNWAY SOUTH QUAY SDN BHD.
 
 

 

62. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
CADANGAN MEMBINA 1 UNIT RUMAH SESEBUAH 2 TINGKAT DAN 3
TINGKAT SERTA PONDOK PENGAWAL DI ATAS PT 925, JALAN
PALONG 1, THE MINES RESORT CITY, SERI KEMBANGAN, MUKIM
PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK
TETUAN LIM SAY SUAN DAN TAN SING YEE.
 
Oleh
CHANG CHENG WAH
 
 

H. PEMBENTANGAN PERMOHONAN PELAN LAMPU JALAN

I. PEMBENTANGAN PERMOHONAN PELAN BANGUNAN

 

63. 7.1.1 KERTAS KERJA : 155/84/17/2025

 
CADANGAN PINDAAN KEPADA PELAN LULUS NO. RUJUKAN MBSJ.BGN.BP4.600-1/12/5/22 BERTARIKH 13 DISEMBER 2023 BAGI :

CADANGAN MEMBINA 4 BLOK PERDAGANGAN YANG MENGANDUNGI :
I) 49 UNIT KEDAI PEJABAT 1 1/2 TINGKAT (PT 3897 HINGGA PT 3945)
II) 1 UNIT PENCAWANG ELEKTRIK (DISEBAHAGIAN PT 3896)

DI JALAN METRO 1/1, BANDAR METRO PUCHONG,
MUKIM PEKAN DESA PUCHONG, PETALING,
SELANGOR DARUL EHSAN


( TAMBAHAN PENCAWANG ELEKTRIK )
 
Oleh
UNTUK GLOMAC ALLIANCE SDN. BHD.
 
 

 

64. 7.1.2 KERTAS KERJA : 156/84/17/2025

 
PERMOHONAN PELAN BANGUNAN BAGI
CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI HARGA BEBAS 39 TINGKAT (1,336 UNIT) YANG MENGANDUNGI:
A.MENARA A - 37 TINGKAT PANGSAPURI HARGA BEBAS (668 UNIT) DI TINGKAT 2 HINGGA TINGKAT 38.
B.MENARA B - 37 TINGKAT PANGSAPURI HARGA BEBAS (668 UNIT) DI TINGKAT 2 HINGGA TINGKAT 38.
C.1 TINGKAT KEMUDAHAN PENDUDUK DAN RUANG WARGA EMAS DI SEBAHAGIAN TINGKAT 38.
D.1 TINGKAT TANGKI AIR DAN SKY DEK DI TINGKAT 39.
E.7 TINGKAT PODIUM YANG MENGANDUNGI:
I.6 TINGKAT TEMPAT LETAK KENDERAAN DARI TINGKAT 1 HINGGA TINGKAT 6.
.
.
H. 2 UNIT PONDOK PENGAWAL.

DI ATAS LOT 79670 (PN 115547), SELUAS 5.762 EKAR, PERSIARAN WAWASAN, PUSAT BANDAR PUCHONG, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: MATRIX CONCEPTS (CENTRAL) SDN. BHD. (404543-A)
 
 

 

65. 7.1.3 KERTAS KERJA : 157/84/17/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DINDING SEKATAN (PARTITION) SEDIA ADA DI UNIT G1.103 ARAS BAWAH, BANGUNAN SUNWAY PYRAMID, DI ATAS SEBAHAGIAN LOT 51175, LOT 32, LOT PT 1312 & LOT PT 391, JALAN PJS 11/15, BANDAR SUNWAY, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK PUMA SPORTS GOODS SDN. BHD.
 
 

 

66. 7.1.4 KERTAS KERJA : 158/84/17/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KEPADA LOT 9F-1 , TINGKAT 9, MENARA 1, PUSAT PERDAGANGAN PUCHONG (PFCC) SEDIADA DI ATAS LOT 112580 (LOT LAMA : SEBAHAGIAN LOT 5452 & 5454), JALAN PUTERI 1/2, BANDAR PUTERI, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : A&I MIRACLE PROPERTY SDN.BHD
 
 

 

67. 7.1.5 KERTAS KERJA : 159/84/17/2025

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN BANGUNAN KE ATAS 1 UNIT KEDAI PEJABAT 3 TINGKAT SEDIA ADA DI ATAS PT 19136, NO. 1, 1-1 & 1-2, JALAN SB INDAH1/2A, TAMAN SUNGAI BESI INDAH, SERI KEMBANGAN, DAERAH PETALING, MUKIM PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK TETUAN MR D.I.Y. SDN BHD.
 
 

 

68. 7.1.6 KERTAS KERJA : 160/84/17/2025

 
CADANGAN PINDAAN KEPADA PELAN LULUS NO RUJUKAN MBSJ.BGN.BP4.600-1/10/4/34 BERTARIKH 24 JANUARI 2025 BAGI
CADANGAN PEMBANGUNAN 91 UNIT RUMAH TERES 2 TINGKAT HINGGA 3 TINGKAT (20- X 70-) FASA 4 (FASA 1B) YANG MENGANDUNGI :
1. 57 UNIT RUMAH TERES 3 TINGKAT (20- X 70-) DI ATAS LOT 64580 HINGGA LOT 64636
2. 34 UNIT RUMAH TERES 2 TINGKAT (20- X 70-) DI ATAS LOT 64637 HINGGA LOT 64670
JALAN PUCHONG LEGENDA, TAMAN PUCHONG LEGENDA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK: HUGES DEVELOPMENT SDN BHD.
KEPADA
CADANGAN PEMBANGUNAN 91 UNIT RUMAH TERES 2 TINGKAT (20- X 70-) FASA 4 (FASA 1B) DI ATAS LOT 64580 HINGGA LOT 64670, JALAN PUCHONG LEGENDA, TAMAN PUCHONG LEGENDA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK: HUGES DEVELOPMENT SDN BHD.
 
Oleh
UNTUK: HUGES DEVELOPMENT SDN BHD.
 
 

 

69. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN 1 UNIT KEDAI PEJABAT 2 TINGKAT SEDIA ADA DI ATAS LOT 8330, NO. 43, JALAN SS 18/1B, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN

.
 
Oleh
UNTUK GOSSYPIUM AT SUBANG JAYA SDN. BHD
 
 

 

70. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN KE ATAS 1 UNIT KEDAI/PEJABAT PADA BANGUNAN KEDAI PEJABAT SEDIADA UNIT A-G-40, GROUND FLOOR, IOI BOULEVARD, JALAN KENARI 5, BANDAR PUCHONG JAYA, 47170 PUCHONG, SELANGOR
 
Oleh
UNTUK TETUAN: 1 DOC PUCHONG SDN BHD
 
 

 

71. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN SERENTAK KM+PB CADANGAN TAMBAHANDAN UBAHSUAIAN KE ATAS 1 UNIT RUMAH KEDAI 1 TINGKAT YANG SEDIA ADA DI ATAS LOT 33649, NO 8, JALAN BPU 3, BANDAR PUCHONG UTAMA, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK: CHOONG CHON HOONG, YAP YOKE SENG DAN YAP CHEN LOONG
 
 

 

72. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAI DALAMAN BAGI SEBUAH UNIT LOT KEDAI PUSAT MEMBELI-BELAH KEPADA RESTORAN NANDO'S DI LOT G00A7 - 00A8, IOI MALL PUCHONG, 23, LEBUHRAYA DAMANSARA, PUCHONG, BANDAR PUCHONG JAYA, 47100, PUCHONG, SELANGOR.
 
Oleh
UNTUK NANDO'S CHICKENLAND MALAYSIA SDN. BHD.
 
 

 

73. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS UNIT NO. L2-01 DAN L2-02, TINGKAT 2, SOUTHPLACE SHOPPES, DI ATAS LOT 72055, PERSIARAN TEKNOLOGI SUBANG, TROPICANA METROPARK, 47500 SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK TETUAN : HUAWEI TECHNOLOGIES (MALAYSIA) SDN BHD
 
 

 

74. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN PINDAAN KEPADA PELAN LULUS MPSJ.BGN.BP2.600-1/10/4(14) YANG BERTARIKH 21JULAI 2023 BAGI PEMBANGUNAN 3 BLOK RUMAH SELANGORKU (RSKU) 715 UNIT YANG MENGANDUNGI:-
A. BLOCK A - 30 TINGKAT PANGSAPURI RUMAH SELANGORKU (RSKU) JENIS E (415 UNIT) DAN KEMUDAHAN BILIK PETI SURAT
B. BLOCK B - 30 TINGKAT PANGSAPURI (RSKU) JENIS C(70 UNIT),(RSKU) JENIS E (230 UNIT) DAN KEMUDAHAN BILIK PETI SURAT
C. BLOCK TEMPAT LETAK KERETA DAN KEMUDAHAN AWAM .
D. 9 TINGKAT TEMPAT LETAK KERETA DI TINGKAT 1 HINGGA 9.
E. KEMUDAHAN SURAU, DEWAN SERBAGUNA, TADIKA, PEJABAT ,PENGURUSAN DAN BILIK M&E DI TINGKAT 1
F. BILIK M&E DAN TEMPAT LETAK MOTOSIKAL DI TINGKAT SEPARA BASMEN G. 2 UNIT KEBUK SAMPAH, 1 UNIT PENCAWANG ELEKTRIK DAN 1 UNIT PONDOK PENGAWAL
DI ATAS LOT 77716, JALAN SUBANG MAS, TAMAN PINGGIRAN USJ, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN : TINTA KACA DEVELOPMENT SDN. BHD. (1456540-D)
 
 

 

75. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAI KEPADA 1 UNIT 2 TINGKAT KEDAI SEDIADA DI ATAS LOT 116715 (UNIT LOT 12) , 2 RIO XCHANGE PERSIARAN RIO BANDAR PUTERI, LEBUH PUTERI, BANDAR PUTERI, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : KJ TEATIME SDN. BHD.
 
 

 

76. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAI KE SEBAHAGIAN TINGKAT 4, BANGUNAN WISMA MERCEDES-BENZ YANG SEDIA ADA, DI ATAS LOT PT 8417, NO. 16A, JALAN BK 1/13, TAMAN PERINDUSTRIAN BANDAR KINRARA, 47180, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

.
 
Oleh
UNTUK TETUAN MERCEDES-BENZ MALAYSIA SDN. BHD
 
 

 

77. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAH SUAI KE ATAS 1 UNIT GUDANG YANG MENGANDUNGI:
1. GUDANG 2 TINGKAT
2. PEJABAT 4 TINGKAT
DI ATAS LOT 65108, (NO.2), JALAN PPU 1, TAMAN PERINDUSTRIAN PUCHONG UTAMA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK LAZADA EXPRESS (MALAYSIA) SDN. BHD.
 
 

 

78. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 3 TINGKAT BANGUNAN PEJABAT DAN 1 TINGKAT KILANG YANG SEDIA ADA DI ATAS LOT PT. 15656, NO. 1, JALAN PUCHONG PERDANA 1, TAMAN PERINDUSTRIAN PUCHONG UTAMA, 4700 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : KEN PRIMA GLASS & ALUM ACC. SDN BHD (633879-U)
 
 

 

79. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT RUANG PERNIAGAAN LOT G48B DI TINGKAT BAWAH, KEPADA BANGUNAN PUSAT MEMBELI-BELAH 'IOI MALL PUCHONG' SEDIA ADA DIATAS SEBAHAGIAN LOT 1855 DAN PT 1924, JALAN PUCHONG, BANDAR PUCHONG JAYA, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK STH MARKETING SDN. BHD.
 
 

 

80. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
CADANGAN UBAHSUAIAN DALAMAN SEBAHAGIAN KEPADA TINGKAT DUA DAN TIGA BLOK A BAGI SEKOLAH ANTARABANGSA (SUNWAY INTERNATIONAL SCHOOL) SEDIA ADA DI ATAS PT 1379 (LOT LAMA PT 896, PT 897, LOT 17, LOT 18, LOT 20 HINGGA LOT 31), JALAN SUBANG 1, TAMAN PERINDUSTRIAN SUBANG USJ 1, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK SUNWAY EDUCATION GROUP SDN. BHD 9146440-K)
 
 

 

81. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN PB SAHAJA
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT KILANG BERBANDUNG 1 TINGKAT BESERTA RUANG PEJABAT 2 TINGKAT SEDIA ADA DI ATAS (PT 153) NO.2, JALAN 6/2, KAWASAN PERUSAHAAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : SERDANG MOTORCYCLE SDN. BHD.
 
 

 

82. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS SEBUAH GUDANG 1 1/2 TINGKAT YANG MENGANDUNGI 3 TINGKAT PEJABAT DAN 'PACKING & Q.C AREA' DI TINGKAT 3 DIATAS LOT 4892, NO.2, JALAN SS13/5, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : APEX PHARMACY MARKETING SDN.BHD.
 
 

 

83. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN PENGUBAHAN DINDING SEKATAN DALAMAN DI TINGKAT 9 HINGGA 13, MENARA HEITECH VILLAGE SEDIADA DI ATAS LOT 12, PERSIARAN KEWAJIPAN, USJ 1, UEP SUBANG JAYA, 47509 SUBANG JAYA, SELANGOR DARUL EHSAN
 
Oleh
UNTUK TETUAN SC HEALTHCARE HOLDINGS SDN BHD (565660-T)
 
 

 

84. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN/UBAHSUAIAN BANGUNAN DARIPADA KEDAI/PEJABAT KE ATAS 2 UNIT BANGUNAN KEDAI/PEJABAT 5&4 TINGKAT SEDIA ADA KEPADA PUSAT PENDIDIKAN AL FIRDAUS DI TINGKAT 2, BLOK D, UNIT NO D-42-2 DAN UNIT NO D-43-2, JALAN ATMOSPHERE 1, THE ATMOSPHERE COMMERCIAL PARK, SERI KEMBANGAN, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN: UWAISALFIRDAUS ENTERPRISE
 
 

 

85. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KEPADA LOT 9F-2, TINGKAT 9, MENARA 2, PUSAT PERDAGANGAN PUCHONG (PFCC) SEDIADA DI ATAS LOT 112580 (LOT LAMA : SEBAHAGIAN LOT 5452 & 5454), JALAN PUTERI 1/2, BANDAR PUTERI, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : KONNET INTERNATIONAL MALAYSIA SDN. BHD.
 
 

 

86. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN PINDAAN KEPADA PELAN KELULUSAN
NO. RUJ.: MPSJ.BGN.BP1.600-1/12/1/17 (21)
BERTARIKH 26 NOV 2021 BAGI CADANGAN
MEROBOH DAN MEMBINA SEMULA SEBUAH RUMAH
BANGLO DARIPADA 2 TINGKAT KEPADA 3 TINGKAT
BESERTA 1 TINGKAT BESMEN TEMPAT LETAK
KERETA DI ATAS LOT 28701, NO.18, JALAN USJ 5/3F,
SUBANG JAYA, MUKIM DAMANSARA, DAERAH
PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN:CHANG VUI SHU & YAP SIEW LIAN
 
 

 

87. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS 1 UNIT KILANG TERES 1 1/2 TINGKAT SEDIA ADA DI ATAS LOT PT 297, NO 33, JALAN TPP 5/6 , TAMAN PERINDUSTRIAN PUCHONG, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : YAP SIEW LIAN DAN CHANG LING HUI
 
 

 

88. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN UBAHSUAI KE ATAS 1 UNIT KILANG BERKEMBAR 1 1/2 TINGKAT SEDIADA KEPADA RESTORAN/CAFE DI ATAS LOT 2656 DAN LOT 2639, NO: 32, JALAN SERINDIT 2, BANDAR PUCHONG JAYA, MUKIM PETALING, SELANGOR D.E.
 
Oleh
UNTUK MAMA HOME CAFE PENANG SDN BHD
 
 

 

89. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAI KE ATAS SEBUAH GUDANG 1 TINGKAT DENGAN PEJABAT 3 TINGKAT YANG SEDIA ADA DI PT. LOT 43304 (60005), NO.7, JALAN BP 4/9, BANDAR BUKIT PUCHONG, 47120 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK TETUAN PROMINENT FLUID CONTROLS (M) SDN. BHD.
 
 

 

90. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PINDAAN KEPADA PELAN KELULUSAN NO. FAIL MPSJ.A 286/3/178 BERTARIKH 15 JUN 2005
BAGI CADANGAN TAMBAHAN DAN PERUBAHAN KEPADA KILANG TERES 1 1/2 TINGKAT
YANG SEDIADA DIATAS LOT PT. 372, PREMIS NO.1, JALAN TP 7/7, SIME UEP INDUSTRIAL PARK,
MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK AVB ASSEST SDN. BHD.
 
 

 

91. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS 1 UNIT RUANG PERNIAGAAN LOT G-08, ARAS BAWAH KOMPLEKS MEMBELI-BELAH IOI SEDIA ADA, DI ATAS LOT 1855, JALAN PUCHONG, PEKAN PUCHONG JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK COMFY CHIC SDN. BHD.
 
Oleh
LIEW JUN MING
 
 

 

92. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAI FASAD BAGI BANGUNAN KEDAI DAN PEJABAT 3 TINGKAT SEDIA ADA DI ATAS LOT PT2141, PT 2142, PT 2143, PT 2144, PT 2145, PT 2146, PT 2147 DAN PT2148,BANDAR PUCHONG JAYA, MUKIM DAN DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK TETUAN COMMERCIAL WINGS SDN.BHD.
 
Oleh
AHMAD IZAHAM BIN MAHAYUDIN
 
 

 

93. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN KELULUSAN PELAN BANGUNAN BAGI CADANGAN PEMBANGUNAN PANGSAPURI 32 TINGKAT YANG MENGANDUNGI: A) PANGSAPURI JENIS A (319 UNIT DARI TINGKAT 3 KE TINGKAT 31) B) PANGSAPURI JENIS B (414 UNIT DARI TINGKAT BAWAH KE TINGKAT 31) C) PANGSAPURI JENIS B1 (4 UNIT DARI TINGKAT BAWAH) D) PANGSAPURI JENIS C (186 UNIT DARI TINGKAT BAWAH KE TINGKAT 30) E) KEMUDAHAN PENDUDUK SEPERTI PEJABAT PENGURUSAN, RUANG PETI SURAT, DEWAN SERBAGUNA, BILIK PENGURUSAN JENAZAH, TADIKA, BILIK PERMAINAN, BILIK AKTIVITI, SURAU LELAKI, SURAU PEREMPUAN, BILIK GYM DAN KOLAM RENANG DI TINGKAT BAWAH, TEMPAT LETAK KERETA 6 TINGKAT DI ARAS 4 SEPARA BAWAH TANAH HINGGA TINGKAT SATU F) 1 UNIT PONDOK PENGAWAL G) 1 UNIT PENCAWANG ELEKTRIK DI ARAS 4 SEPARA BAWAH TANAH H) 1 UNIT PUSAT PENGUMPULAN SAMPAH DI ARAS 4 SEPARA BAWAH TANAH DI ATAS LOT 118349 (LOT LAMA PT 83489) SELUAS 7.006 EKAR, JALAN CEMARA, SEKSYEN 10, TAMAN BUKIT SERDANG, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK: GAN SIN POO & SONS SDN. BHD.
 
Oleh
CHAN CHEE HAU
 
 

 

94. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
CADANGAN TAMBAHAN DAN UBAHSUAIAN DALAMAN DI SEBAHAGIAN ARAS BESMEN BAGI SEBUAH HOSPITAL PAKAR 7 TINGKAT DENGAN 1 TINGKAT BESMEN SEDIADA DI ATAS LOT 4247, NO. 1, JALAN SS12/1A, MUKIM DAMANSARA, DAERAH PETALING, BANDAR SUBANG JAYA, SELANGOR DARUL EHSAN.
UNTUK : SJP MEDICAL CENTRES SDN. BHD.
 
Oleh
SIM YONG CHIAN
 
 

J. PEMBENTANGAN PERMOHONAN PELAN LANDSKAP

 

95. 8.1 KERTAS KERJA : 08/85/17/2025

 
PERMOHONAN PELAN LANDSKAP BAGI CADANGAN MEROBOH DAN MEMBINA SEMULA SEBUAH BANGUNAN GUDANG DAN PEJABAT 1 TINGKAT DAN SEBUAH BANGUNAN ASRAMA PEKERJA 6 TINGKAT YANG MENGANDUNGI :
1) 1 BLOK BANGUNAN GUDANG DAN PEJABAT 1 TINGKAT
2) 1 BLOK BANGUNAN ASRAMA PEKERJA 6 TINGKAT
A) KEMUDAHAN KAFETERIA, DAPUR, KEDAI, SURAU,
TANDAS DAN PEJABAT PENGURUSAN DI TINGKAT 1
B) ASRAMA PEKERJA DI TINGKAT 2 HINGGA TINGKAT 5
C) RUANG REKREASI DAN UTILITI DI TINGKAT 6
DI ATAS PT 530, JALAN SUBANG 8, TAMAN PERINDUSTRIAN SUBANG JAYA USJ 1, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : TETUAN GAIN BAND (M) SDN. BHD. (760032-W)
 
 

 

96. 8.2 KERTAS KERJA : 09/85/17/2025

 
CADANGAN PERMOHONAN KELULUSAN PELAN LANDSKAP BAGI MENAIKTARAF KAWASAN LAPANG DI ATAS LOT 44594 JALAN TK 1/13, TAMAN KINRARA SEKSYEN 1, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : JRK LAND SDN. BHD.
 
 

 

97. 8.3 KERTAS KERJA : 10/85/17/2025

 
PERMOHONAN PELAN LANDSKAP BAGI CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI HARGA BEBAS 17 TINGKAT YANG MENGANDUNGI:

A. 10 TINGKAT PANGSAPURI (216 UNIT) DARI TINGKAT 7 HINGGA TINGKAT 16
B. 1 UNIT BILIK KOMPUTER, BILIK BACAAN DAN RUANG AKTIVITI TERBUKA DI TINGKAT 7
C. 1 TINGKAT RUANG KEMUDAHAN YANG MENGANDUNGI: GIMNASIUM, DEWAN SERBAGUNA, BILIK PERSALINAN, RUANG DOBI, KOLAM RENANG, YOGA DECK, PEJABAT PENGURUSAN, RUANG AKTIVITI WARGA EMAS DAN BILIK PERMAINAN DI TINGKAT 6
D. 5 TINGKAT PODIUM TEMPAT LETAK KERETA DARI TINGKAT 1 HINGGA TINGKAT 5
E. 1 UNIT TADIKA, RUANG LOBI, DROP-OFF AREA, BILIK PETI SURAT, BILIK KAWALAN KEBAKARAN, GERAI, SURAU (L), SURAU (P), BILIK PENGURUSAN JENAZAH, REFUSE CHAMBER DAN RUANG UTILITI DI TINGKAT 1
F. 1 UNIT PONDOK PENGAWAL

DI ATAS PT 16028, JALAN TK 1/13, TAMAN KINRARA SEKSYEN 1, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK: JRK LAND SDN BHD (NO SYARIKAT: 1143525-M)
 
 

K. PEMBENTANGAN PERMOHONAN PERMIT SEMENTARA

L. HAL-HAL LAIN

 

98. 5.3 KERTAS KERJA BIL. : 234/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN KEPADA TASKA DI ATAS LOT 20237, DI ALAMAT NO. 1, JALAN USJ 2/2N, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP1.600-1/4/157 JLD. 2)
(MBSJ.OSC.600-1/1629/KM4)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : TASKA ADALAFF (SA0359359-U)
 
 

 

99. 5.9 KERTAS KERJA BIL. : 240/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN KEPADA PUSAT JAGAAN (RUMAH KEBAJIKAN) DI ALAMAT NO. 2, JALAN 8, TAMAN BUKIT KUCHAI, 47100 PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.


(NO. PERSATUAN : PPM-012-10-02051997)
(MBSJ.JPB.BP4.600-1/4/100 JILID 2)
(MBSJ.OSC.600-1/1627/KM 4)
- PERMOHONAN MEMPERHAHARUI KEBENARAN MERANCANG KALI KEDUA
 
Oleh
UNTUK : PERSATUAN KEBAJIKAN RUMAH VICTORY MALAYSIA
 
 

 

100. 5.11 KERTAS KERJA BIL. : 242/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL BANGUNAN DARIPADA PERUMAHAN KEPADA TADIKA DI ALAMAT NO. 1, JALAN INDAH 3/6, TAMAN PUCHONG INDAH, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.


(MBSJ.JPB.BP5.600-1/4/243)
(MBSJ.OSC.600-1/1620/KM4)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : TADIKA UNIVERSAL PINTAR (003570793 – K)
 
 

 

101. 5.14 KERTAS KERJA BIL. : 245/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN SESEBUAH KEPADA PUSAT JAGAAN ORANG TUA DI ALAMAT NO. 607-B, JALAN AMAN, KAMPUNG BARU SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP7.600-1/4/147)
(MBSJ.OSC.600-1/1614/KM4(BP7-2025/0935)
 
Oleh
UNTUK : DRSM SINCERE SERVICES SDN BHD (1099070-D)
 
 

 

102. 5.15 KERTAS KERJA BIL. : 246/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN (RUMAH SESEBUAH) KEPADA TADIKA DI ALAMAT NO. 924, JALAN SK 5/7, KAMPUNG BARU SERI KEMBANGAN, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP7.600-1/4/84.JLD 2)
(MBSJ.OSC.600-1/1628-KM4)
- PERMOHONAN MEMPERBAHARUI KEBENARAN MERANCANG KALI KELIMA
 
Oleh
UNTUK : TADIKA SRI SUKARIA (001523783-K)
 
 

 

103. 5.16 KERTAS KERJA BIL. : 247/82/17/2025

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KEDIAMAN KEPADA TASKA DI ALAMAT NO. 1, JALAN SEJAHTERA 5/1, TAMAN SERDANG HEIGHTS, SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

MBSJ.JPB.BP7.600-1/4/82 JLD 2
4(BP7-2025/0939)
- PERMOHONAN MEMPERBAHARUI KEBENARAN MERANCANG KALI KEEMPAT
 
Oleh
UNTUK : LITTLE HARVARD CHILD CARE CENTRE (SA0235041-W)
 
 

 

104. 5.17 KERTAS KERJA BIL. : 248/82/17/2025

 
PERMOHONAN BAGI PELAKSANAAN SKIM PERUMAHAN BERPENGAWAL DI KAWASAN PERUMAHAN AMANSARI 18A, 18B, 18C DAN 18D, AMANSARI KINRARA SEKSYEN 8, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
(R.O.S : PPM-025-10-06102017)
(MBSJ.JPB.BP4.600-1/13/13)
 
Oleh
UNTUK : PERSATUAN PEMILIK RUMAH AMANSARI 18A, 18B, 18C DAN 18D
 
 

 

105. 7.2.1 KERJA LEBIH MASA - BERJAYA TAGAR SDN. BHD. (RSKU-AZALEA)

 
PERMOHONAN KERJA LEBIH MASA PEMBINAAN DARI JAM 8.00 MALAM KE 10.00 MALAM PADA HARI ISNIN – SABTU BAGI :

CADANGAN PEMBANGUNAN 402 UNIT PANGSAPURI RUMAH SELANGORKU (RSKU) JENIS E YANG MENGANDUNGI:-

I. 1 BLOK PANGSAPURI RSKU 23 TINGKAT BERMULA DARI TINGKAT 5 HINGGA TINGKAT 23 DAN 6 UNIT RUMAH SELANGORKU UNTUK ORANG KELAINAN UPAYA DI TINGKAT 5
II. TADIKA DAN TASKA DI TINGKAT 1
III. TEMPAT LETAK KERETA DI TINGKAT 1 HINGGA TINGKAT 4
IV. KEMUDAHAN PENDUDUK YANG MENGANDUNGI KOLAM RENANG, GIMNASIUM, DEWAN SERBAGUNA, SURAU LELAKI DAN PEREMPUAN, TANDAS LELAKI, TANDAS PEREMPUAN DAN TANDAS ORANG KELAINAN UPAYA, BILIK PERSALINAN LELAKI DAN PEREMPUAN, TEMPAT BARBEKU, TEMPAT PERMAINAN KANAK-KANAK DAN 8 UNIT KEDAI DI TINGKAT 5
V. PEJABAT PENGURUSAN, 2 UNIT PENCAWANG TNB DAN TANDAS LELAKI, TANDAS PEREMPUAN DAN TANDAS ORANG KELAINAN UPAYA DI TINGKAT 1
VI. PUSAT PENGUMPULAN SAMPAH DAN PONDOK PENGAWAL

DI ATAS PT 35944, JALAN SHT 4, SUBANG HEIGHTS, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK : BERJAYA TAGAR SDN. BHD. (189914-H)
(DAHULUNYA DIKENALI SEBAGAI SELAT MAKMUR SDN BHD. (189914-H)
 
Oleh
UNTUK : BERJAYA TAGAR SDN. BHD
 
 

 

106. 7.2.2 KERJA LEBIH MASA - KIRANAMAZ PROPERTY SDN. BHD.

 
PERMOHONAN KERJA LEBIH MASA DARI JAM 6.01 PETANG KE 9.00 MALAM PADA HARI ISNIN – SABTU:-

CADANGAN PEMBANGUNAN 5 BLOK PANGSAPURI PERKHIDMATAN & PERNIAGAAN YANG MENGANDUNGI :-
A. MENARA A - 35 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (734 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 44.
B. MENARA B - 33 TINGKAT PANGSAPURI PERKHIDMATAN
PERNIAGAAN (428 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 42
C. MENARA C - 33 TINGKAT PANGSAPURI PERKHIDMATAN
PERNIAGAAN (428 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 42
D. MENARA D - 33 TINGKAT PANGSAPURI PERKHIDMATAN
PERNIAGAAN (428 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 42
E. MENARA E - 33 TINGKAT PANGSAPURI PERKHIDMATAN
PERNIAGAAN (428 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 42
F. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI
GIMNASIUM, DEWAN SERBAGUNA, SURAU (LELAKI & PEREMPUAN), BILIK BACAAN / MINI PERPUSTAKAAN, KOLAM RENANG DEWASA, KOLAM RENANG KANAK-KANAK, TAMAN PERMAINAN, GELANGGANG SUKAN, BILIK MEDITASI DAN DOBI DI TINGKAT 9
G. 7 TINGKAT PODIUM TEMPAT LETAK KENDERAAN DARI TINGKAT 2 HINGGA TINGKAT 8
H. 1 TINGKAT RUANG PERNIAGAAN, TEMPAT LETAK KENDERAAN
(PERSENDIRIAN) DAN BILIK PETI SURAT DI TINGKAT 1
I. 1 ½ TINGKAT KEMUDAHAN YANG MENGANDUNGI TADIKA DAN PEJABAT PENGURUSAN DI TINGKAT 1 DAN 1A
J. 1 UNIT KEBUK SAMPAH
K. 1 UNIT BILIK PENGAWAL
DI ATAS LOT 64681, (SELUAS 9.428 EKAR), JALAN PJS 9/1, SUBANG JAYA, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
 
Oleh
UNTUK : KIRANAMAZ PROPERTY SDN. BHD.
 
 

 

107. 6.4 PERMOHONAN PENGECUALIAN PELAN KERJA TANAH

 
I. CHAI WAI SU & LIEW MEI KUAN
II. LOH KIEN WOON
III. ZEN ENT SDN BHD SEBAGAI PENYEWA DAN MAZKAMAZ INDUSTRIES SDN BHD SEBAGAI PEMILIK TANAH
IV. ZEN ENT SDN BHD SEBAGAI PENYEWA DAN MAZKAMAZ INDUSTRIES SDN BHD SEBAGAI PEMILIK TANAH
V. MAZKAMAZ INDUSTRIES SDN BHD
 
Oleh
PERMOHONAN PENGECUALIAN PELAN KERJA TANAH
 
 

 

108. 6.5 PELAPORAN PEMATUHAN LAPORAN KAJIAN PENILAIAN IMPAK LALULINTAS (TRAFFIC IMPACT ASSESSMENT (TIA)

 
6.5.1 LAPORAN KAJIAN PENILAIAN IMPAK LALULINTAS (TIA) BAGI PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL TANAH DARIPADA TEMPAT LETAK KENDERAAN KEPADA PERNIAGAAN BAGI PENDIRIAN BANGUNAN YANG MENGANDUNGI :
I. 1 UNIT GALERI JUALAN 1 TINGKAT
II. 1 UNIT RESTORAN 1 TINGKAT
III. 1 UNIT KAFE KACA 1 TINGKAT
IV. 1 UNIT PENCAWANG PADAT
V. 1 UNIT KEBUK SAMPAH
VI. TEMPAT LETAK KENDERAAN ELEKTRIK
VII. MENARA PAPAN TANDA
DI ATAS PT 35026, JALAN PUTRA MAHKOTA 7/4, PUTRA HEIGHTS, MUKIMDAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : SIME DARBY PUTRA HEIGHTS DEVELOPMENT SDN.BHD.
 
 

 

109. 6.5 PELAPORAN PEMATUHAN LAPORAN KAJIAN PENILAIAN IMPAK LALULINTAS (TRAFFIC IMPACT ASSESSMENT (TIA)

 
6.5.2 LAPORAN KAJIAN PENILAIAN IMPAK LALULINTAS (TIA) BAGI ADANGAN PENAMBAHBAIKAN LALULINTAS DI LEBUH PUTERI, BANDAR PUTERI, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : FLORA DEVELOPMENT SDN. BHD.
 
 

 

110. 6.5 PELAPORAN PEMATUHAN LAPORAN KAJIAN PENILAIAN IMPAK LALULINTAS (TRAFFIC IMPACT ASSESSMENT (TIA)

 
6.5.3 LAPORAN KAJIAN PENILAIAN IMPAK LALULINTAS (TIA) BAGI PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBANGUNAN PERNIAGAAN YANG MENGANDUNGI:
FASA 1
A) 5 TINGKAT KOMPLEKS PERNIAGAAN YANG MENGANDUNGI:-
(I) PODIUM TEMPAT LETAK KENDERAAN 5 TINGKAT BERSERTA 3 TINGKAT MEZZANINE YANG MENGANDUNGI RUANG PERNIAGAAN
(II) 1 TINGKAT SUB BASEMEN BERSERTA 1 TINGKAT MEZZANINE YANG MENGANDUNGI TEMPAT LETAK KENDERAAN DAN RUANG PERNIAGAAN
(III) 4 TINGKAT BASEMEN TEMPAT LETAK KENDERAAN
FASA 2
A) 1 BLOK MENARA 28 TINGKAT DI ATAS PODIUM MENGANDUNGI:-
(I) 16 TINGKAT PEJABAT
(II) 11 TINGKAT HOTEL (300 BILIK)
(III) 1 TINGKAT M&E

FASA 3
A) 1 BLOK MENARA PEJABAT 30 TINGKAT DI ATAS PODIUM

FASA 4
A) 1 BLOK MENARA PEJABAT 10 TINGKAT DI ATAS PODIUM

FASA 5
(A) PEMBANGUNAN AKAN DATANG
DI ATAS LOT 116716 (GRN 334614), LOT 116717 (GRN 334615) DAN LOT 116718 (GRN 334616), SELUAS 27.998 EKAR, BANDAR PUTERI PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : FLORA DEVELOPMENT SDN. BHD.
 
 

 

111. 6.6 HAL-HAL LAIN

 
6.6.1 PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI PERKHIDMATAN PERNIAGAAN (307 UNIT) 30 TINGKAT YANG MENGANDUNGI:
A. 21 TINGKAT PANGSAPURI PERKHIDMATAN PERNIAGAAN (246 UNIT) DAN PANGSAPURI PERKHIDMATAN PERNIAGAAN MAMPU MILIK (61 UNIT) DARI TINGKAT 10 HINGGA TINGKAT 30
B. 1 TINGKAT KEMUDAHAN PENDUDUK YANG MENGANDUNGI KOLAM RENANG, BILIK SERBAGUNA, GIMNASIUM, BILIK PERMAINAN, PEJABAT PENGURUSAN, SURAU (LELAKI DAN PEREMPUAN) DAN TAMAN PERMAINAN DI TINGKAT 9
C. 5 TINGKAT PODIUM TEMPAT LETAK KENDERAAN DARI TINGKAT 4 HINGGA TINGKAT 8
D. 3 TINGKAT KEDAI (67 UNIT) DARI TINGKAT 1 HINGGA TINGKAT 3
E. 1 TINGKAT KEMUDAHAN YANG MENGANDUNGI TADIKA, PEJABAT PENGURUSAN, PEJABAT PERSENDIRIAN, BILIK PETI SURAT DAN BILIK PENGAWAL DI TINGKAT 2
F. KEBUK SAMPAH DAN SEBAHAGIAN TEMPAT LETAK KENDERAAN DI TINGKAT 1

DI ATAS HAK MILIK H.D.(D) 259806 (PT 1971), SELUAS 1.40 EKAR, BANDAR PUCHONG JAYA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN


- PERMOHONAN PENGECUALIAN BAGI MENGEMUKAKAN CARUMAN KUMPULAN WANG PERKHIDMATAN KEMAJUAN (ISF)
(RUJUKAN FAIL : MPSJ.KEJ.600-1/19/117)
 
Oleh
UNTUK: PILIHAN MEGAH SDN. BHD. (195631-P)
 
 

 

112. 3.2 SENARAI PERMOHONAN DENGAN KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 16/2025 PADA 19 OGOS 2025)

 
PERMOHONAN KEBENARAN MERANCANG

PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KEDIAMAN KEPADA TASKA DI ALAMAT NO. 40, JALAN PUJ 7/16, TAMAN PUNCAK JALIL, BANDAR PUTRA PERMAI, 43300 SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP6.600-1/4/15 JLD. 3)
(MBSJ.OSC.600-1/161/1611/KM4)
 
Oleh
UNTUK : TASKA WIDAD (SA02030721 – D)
 
 

 

113. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA PERUMAHAN KEPADA TADIKA DI ATAS LOT 32713, DI ALAMAT NO. 2, JALAN USJ 12/1M, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

(MBSJ.JPB.BP1.600-1/4/317 JLD. 2)
(MBSJ.OSC.600-1/1535/KM4)
- PERMOHONAN BARU KEBENARAN MERANCANG
 
Oleh
UNTUK : TADIKA ANAK MANIS (001343586-X)
 
 

 

114. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL BANGUNAN DARIPADA PERUMAHAN KEPADA TADIKA DI ALAMAT NO. 37, JALAN INTAN 3/4, TAMAN PUCHONG INTAN, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : TADIKA PELAJAR CERDIK (SA0352899-P)
(MBSJ.JPB.BP5.600-1/4/239)
(MBSJ.OSC.600-1/1538/KM4)
 
Oleh
UNTUK : TADIKA PELAJAR CERDIK (SA0352899-P)
 
 

 

115. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 14/2025 PADA 28 JULAI 2025)

 
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL KEGUNAAN BANGUNAN DARIPADA KEDIAMAN KEPADA PUSAT JAGAAN DI ALAMAT NO. 1, JALAN PP 19, TAMAN PINGGIRAN PUTRA, BANDAR PUTRA PERMAI, 43300 SERI KEMBANGAN, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : PERTUBUHAN KEBAJIKAN PDK PERMATA HATI SERI KEMBANGAN SELANGOR (PPM-024-10-28092017)
(MBSJ.JPB.BP6.600-1/4/167)
(MBSJ.OSC.600-1/1536/KM4)
- PERMOHONAN KEBENARAN MERANCANG MEMBUAT PERUBAHAN MATERIAL
 
Oleh
UNTUK : PERTUBUHAN KEBAJIKAN PDK PERMATA HATI SERI KEMBANGAN SELANGOR
 
 

 

116. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN PELAKSANAAN SKIM PERUMAHAN BERPENGAWAL (GUARDED COMMUNITY) DI KAWASAN PERUMAHAN SS 12/1, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.

UNTUK : PERSATUAN KOMUNITI SS 12/1 SUBANG JAYA
(PPM-023-10-26032024)
(MBSJ.JPB.BP1.600-1/13/31)
- PERMOHONAN BARU PERLAKSANAAN SKIM PERUMAHAN BERPENGAWAL
 
Oleh
UNTUK : PERSATUAN KOMUNITI SS 12/1 SUBANG JAYA
 
 

 

117. KEPUTUSAN LULUS DENGAN SYARAT (MJKOSC BIL. 15/2025 PADA 07 OGOS 2025)

 
PERMOHONAN PENGECUALIAN PELAN KERJA TANAH

PERMOHONAN PENGECUALIAN KERJA TANAH BAGI CADANGAN MEMBINA 1 UNIT RUMAH SESEBUAH 2 TINGKAT BESERTA 1 TINGKAT BAWAH TANAH DI ATAS LOT PT 81054, NO.38A, JALAN EQUINE 3, TAMAN EQUINE,BANDAR PUTRA PERMAI,SERI KEMBANGAN,MUKIM PETALING, DAEAH PETALING, SELANGOR DARUL EHSAN
 
Oleh
UNTUK : LIM THIAM WAN
NO. FAIL : MBSJ.KEJ.600-1/19/151