Mesyuarat Jawatankuasa OSC
Majlis Perbandaran Manjung
Mesyuarat Jawatankuasa OSC, Majlis Perbandaran Manjung
TAJUK MESYUARAT |
: | MESYUARAT OSC BIL 18/2021 |
TARIKH |
: | 28 SEPTEMBER 2021 (SELASA) |
MASA |
: | 9:30 AM |
TEMPAT |
: | RUANG KERJA MASING-MASING MELALUI ZOOM |
PENGERUSI |
: | YANG DIPERTUA MAJLIS PERBANDARAN MANJUNG |
AGENDA MESYUARAT
1 |
PERUTUSAN PENGERUSI MESYUARAT OSC |
2 |
PENGESAHAN MINIT MESYUARAT MESYUARAT OSC BIL BIL.17/2021 PADA 14-09-2021 |
3 |
PERKARA-PERKARA BERBANGKIT |
4 |
PEMBENTANGAN PERMOHONAN PEMAJUAN KELULUSAN |
5 |
PEMBENTANGAN DAN PERTIMBANGAN KERTAS DASAR |
6 |
PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN |
7 |
PEMBENTANGAN KERTAS PEMAKLUMAN |
8 |
PEMBENTANGAN STATUS DAN ISU PEMANTAUAN TAPAK |
9 |
HAL-HAL LAIN BERKAITAN PERMOHONAN I |
10 |
HAL-HAL LAIN BERKAITAN PERMOHONAN II |
11 |
HAL-HAL LAIN |
Kertas Pembentangan
A. PERKARA-PERKARA BERBANGKIT
B. PEMBENTANGAN PERMOHONAN SERENTAK
| ||
CADANGAN PELAN KERJA TANAH BAGI CADANGAN SKIM PERUMAHAN DI ATAS GM 4154 LOT 8702, MUKIM SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN PURATA SIMFONI SDN. BHD. | ||
Oleh | ||
KOH LIONG BOON | ||
| ||
"CADANGAN PINDAAN KEPADA PELAN YANG TELAH DILULUSKAN MPM PELAN NO. 10/003/0002/45/2019-102836 BAGI PERMOHONAN PELAN BANGUNAN SEBUAH WATER TREATMENT PLANT YANG TERDIRI DARIPADA:
III. CADANGAN MEMBINA SISTEM TAMBAHAN YANG MENGANDUNGI 1 BUAH PRE-TREATMENT TANK, 1 BUAH EQUALIZATION TANK, 1 BUAH MECHANICAL ROOM, DAN 1 BUAH SCHEDULED WASTE STORAGE SHED SERTA TAMBAHAN 1 BUAH CHEMICAL STORAGE ROOM IV. PELAN TERBINA YANG MENGANDUNGI 3 BUAH EQUALIZATION TANK, 2 BUAH DISSOLVED AIR FLOTATION TANK, 1 BUAH SEDIMENTATION POND, 2 BUAH FILTERED WATER TANK, 1 BUAH CLARIFIED WATER SUMP TANK, 2 BUAH CLARIFIER TANK, 2 BUAH SLUDGE TANK, 2 BUAH MECHANICAL ROOM, 1 BUAH FILTER PRESSED AREA, DAN 1 BUAH UTILITY BUILDING DI ATAS SEBAHAGIAN LOT 15651, MUKIM LUMUT DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN YTY INDUSTRY SDN BHD." | ||
Oleh | ||
AZIZI BIN ABU BAKAR | ||
| ||
"PERMOHONAN KEBENARAN MERANCANG BAGI CADANGAN MEMBINA SKIM
PERUMAHAN YANG MENGANDUNGI : 1) 18 UNIT RUMAH TERES 2 TINGKAT JENIS 'A' (20' X 75' / 76') DI ATAS PLOT 1 KE PLOT 18,2) 11 UNIT RUMAH TERES 2 TINGKAT JENIS 'B' (22' X 77'± - 82'±) DI ATAS PLOT 19 KE PLOT 29, DI LOT 4941, BERHAMPIRAN TAMAN LUMUT MEWAH 2,MUKIM LUMUT, DAERAH MANJUNG PERAK DARUL RIDZUAN UNTUK TETUAN MARVICE PROPERTY SDN. BHD." | ||
Oleh | ||
ZAINI BIN MOHD NOR @ RAINI BIN JAAFAR | ||
| ||||
"PERMOHONAN SERENTAK KEBENARAN MERANCANG PELAN PERTAPAKAN DAN
PELAN BANGUNAN BAGI CADANGAN PEMBANGUNAN SKIM PERUMAHAN 1) 668 UNIT RUMAH KLUSTER SETINGKAT DI ATAS PLOT 1 - 668 2) 3 UNIT PENCAWANG ELEKTRIK DI ATAS PLOT 671 - 673 DI ATAS LOT 75260 & LOT 75314 (LOT LAMA PT 42120 & PT 42174), BANDAR BARU SETIA AWAN PERDANA, MUKIM SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN : TARAF NUSANTARA SDN. BHD." | ||||
Oleh | ||||
PARAMA NATHAN A/L S.KANDASAMY | ||||
| ||
CADANGAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN PEMBANGUNAN SKIM PERUMAHAN DI ATAS GRN 181841 LOT 75260 (PT 42120) DI ATAS SEBAHAGIAN GRN 166179 LOT 74524 (DAHULUNYA LOT 16684), MUKIM SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN TARAF NUSANTARA SDN. BHD. | ||
Oleh | ||
KOH LIONG BOON | ||
| ||||
PERMOHONAN KEBENARAN MERANCANG PERTAPAKAN TERHAD BAGI CADANGAN PENGELUARAN PASIR SILIKA DI ATAS LOT 10314 (3.9882 EKAR) DAN LOT 10317 (3.983 EKAR), TELUK SENANGIN, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN Q-MINERALS (M) SDN BHD | ||||
Oleh | ||||
AZIZI BIN ABU BAKAR | ||||
C. PEMBENTANGAN PERMOHONAN KEBENARAN MERANCANG
| ||
PERMOHONAN KEBENARAN MERANCANG PELAN SUSUNATUR LOT KEDIAMAN DI BAWAH SUBSEKSYEN 21(1), AKTA 172, BAGI CADANGAN TUKAR SYARAT TANAH DARIPADA PERTANIAN (TANAMAN KOMERSIAL-GETAH) KEPADA BANGUNAN (KEDIAMAN) DI BAWAH SEKSYEN 124, KANUN TANAH NEGARA (KTN), DI ATAS LOT 42212 (NO.HAKMILIK GM11062) SELUAS 0.765 EKAR, MUKIM SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN ASAS BINA ENTERPRISE SDN. BHD. | ||
Oleh | ||
SHAHNIZAM BIN MD SHARIF | ||
| ||
PERMOHONAN KEBENARAN MERANCANG PELAN PERTAPAKAN BAGI CADANGAN UNTUK MENDIRIKAN 7 UNIT KEDAI PEJABAT 2-TINGKAT DI ATAS LOT 12120 - 12126, MUKIM PENGKALAN BAHARU, DAERAH MANJUNG, PERAK DARUL RIDZUAN.
UNTUK: TETUAN KARTIKA SAUJANA SDN. BHD. | ||
Oleh | ||
LIEW TZE SIANG | ||
| ||
PELAN
SUSUNATUR UNTUK MENDAPATKAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21 AKTA 172 BAGI TUJUAN TUKAR SYARAT TANAH DARI PERTANIAN KEPADA PERUMAHAN SERTA PENYERAHAN DAN PEMBERIMILIKAN SEMULA DI BAWAH SEKSYEN 204 D ( DI ATAS LOT 2117 LEKIR SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN SELUAS 3 024 EKAR. TETUAN MOHAMAD ALI BIN ARIFFIN | ||
Oleh | ||
MOHD ARIF BIN RAHMAT | ||
| ||
PERMOHONAN KEBENARAN MERANCANG DI BAWAH SUBSEKSYEN 21(1), AKTA 172 BAGI CADANGAN SEBUAH LADANG SOLAR BERKAPASITI 37 MWAC SELUAS 114.99 EKAR (46.53 HA) DI ATAS SEBAHAGIAN LOT 9995 [NO. GERAN:168303], MUKIM SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN
UNTUK TETUAN SURIAMAS ENERGY (MARITIME) SDN. BHD. | ||
Oleh | ||
CHENG HUI LIN | ||
| ||
PERMOHONAN KEBENARAN MERANCANG DI BAWAH SUBSEKSYEN 21, AKTA 172 BAGI CADANGAN PEMBANGUNAN PERNIAGAAN BERCAMPUR BERKONSEP STRATA YANG MENGANDUNGI KOMERSIAL SUITE DAN KOMPLEKS PERNIAGAAN BESERTA KEMUDAHAN SOKONGAN BERKAITAN DIATAS LOT 41 (GERAN 55417) SELUAS 7.387 EKAR, MUKIM PEKAN PASIR BOGAK, DAERAH MANJUNG, PERAK DARUL RIDZUAN, UNTUK TETUAN PANGKOR VENICE WORLD SDN BHD. | ||
Oleh | ||
HALMI BIN ZAINOL | ||
| ||
PERMOHONAN PELAN SUSUNATUR UNTUK MENDAPATKAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21(1), AKTA 172 BAGI TUJUAN CADANGAN SKIM PERUMAHAN DI ATAS LOT 13367 SELUAS 2.89 EKAR (1.16 HEKTAR) MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN ECO KARISMA SDN BHD (KOORDINAT GDM 2000 : U-74025.936, T -18940.168 & U -74179.997, T -18914.824) | ||
Oleh | ||
TUAN ZAMRI B.TUAN EMBONG | ||
| ||
PERMOHONAN KEBENARAN MERANCANG PERTAPAKAN : BAGI CADANGAN TAMBAHAN DINDING 'GYPSUM BOARD' DITINGKAT SATU DAN DUA BAGI TUJUAN TEMPAT TINGGAL BAGI KEDAI PEJABAT 3 TINGKAT DI NO.227 (PT.14524 / LOT.49874), JALAN PPMP 3/4, PUSAT PERNIAGAAN MANJUNG POINT III, 32040 SERI MANJUNG, PERAK.
UNTUK ; SYARIKAT PERNIAGAAN SERBANEKA (PERAK) SEDIRIAN BERHAD. | ||
Oleh | ||
LEE YONG CHIEW | ||
| ||
PERMOHONAN KEBENARAN MERANCANG TERHAD BAGI CADANGAN PELAN SIAP BINA SEBUAH BANGUNAN RUMAH PEKERJA SATU TINGKAT DI ATAS LOT 241, BATU 13, JALAN SEGARI, PG BAHARU, MUKIM PENGKALAN BAHARU, DAERAH MANJUNG, PANTAI REMIS, PERAK DARUL RIDZUAN UNTUK GB FARMING SDN. BHD | ||
Oleh | ||
LEE YONG CHIEW | ||
| ||
PERMOHONAN KEBENARAN MERANCANG TERHAD BAGI CADANGAN PELAN SIAP BINA SEBUAH BANGUNAN RUMAH PEKERJA SATU TINGKAT DI ATS LOT 2608 & 6686 (PT 7642) BATU 13, JALAN SEGARI, PG BAHARU, MUKIM PENGKALAN BAHARU, DAERAH MANJUNG,PANTAI REMIS, PERAK DARUL RIDZUAN UNTUK GB FARMING SDN. BHD. | ||
Oleh | ||
LEE YONG CHIEW | ||
| ||
PERMOHONAN NAMA TAMAN, NAMA JALAN DAN NOMBOR RUMAH IAITU BAGI CADANGAN MEMBINA 26 UNIT RUMAH BERKEMBAR 2 TINGKAT DI ATAS PLOT 2 – PLOT 13, PLOT 15 – PLOT 28, DAN 1 UNIT ZERO LOT 2 TINGKAT DI ATAS PLOT 14 DI ATAS LOT 3504, MUKIM SITIAWAN, DAERAH MANJUNG, UNTUK SMARTBUILD DEVELOPMENT SDN. BHD. | ||
Oleh | ||
LEE YONG CHIEW | ||
| ||
PERMOHONAN KEBENARAN MERANCANG PELAN
SUSUNATUR DI BAWAH [SEKSYEN 21(1), AKTA 172] BAGI TUJUAN SERAHBALIK & BERIMILIK SEMULA DARIPADA PERUMAHAN KEPADA PERNIAGAAN DI BAWAH SEKSYEN 204D KTN BAGI CADANGAN PEMBANGUNAN SEBUAH LOT PERNIAGAAN 1 TINGKAT YANG MENGANDUNGI: A. PERNIAGAAN KEDAI BEBAS CUKAI 1 TINGKAT DI ATAS LOT 4454 SELUAS 0.24 EKAR (0.10 HEKTAR), TELUK NIPAH, PULAU PANGKOR, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN. UNTUK TETUAN SP INTERNATIONAL HOLDINGS (M) SDN. BHD. | ||
Oleh | ||
TUAN ZAMRI B.TUAN EMBONG | ||
D. PEMBENTANGAN PERMOHONAN PELAN JALAN DAN PERPARITAN
| ||
PINDAAN KEPADA PELAN LULUS BIL.(15)DLM.MPM PELAN NO. 38/02/17/2019/2 TARIKH: 21 FEBRUARI 2020 UNTUK PELAN JALAN DAN PERPARITAN BAGI CADANGAN SKIM PERUMAHAN DI ATAS GM 1198 LOT 3198, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN NALURI JELATA SDN. BHD.
[MEMBUKA SEMULA PERMOHONAN] | ||
Oleh | ||
KOH LIONG BOON | ||
E. PEMBENTANGAN PERMOHONAN PELAN LAMPU JALAN
| ||
PERMOHONAN KELULUSAN CADANGAN LAMPU JALAN BAGI: CADANGAN MEMBINA & MENYIAPKAN SKIM PERUMAHAN YANG MENGANDUNGI : I)1 UNIT RUMAH SESEBUAH 2 TINGKAT (PLOT 25), II) 28 UNIT RUMAH BERKEMBAR 2 TINGKAT (PLOT 1-24 & PLOT 26-29), DI ATAS LOT 3370, MUKIM PENGKALAN BAHARU, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN GREAT HOME SDN. BHD. | ||
Oleh | ||
LIEW YIT TI | ||
| ||
PERMOHONAN UNTUK KELULUSAN CADANGAN LAMPU JALAN BAGI: CADANGAN MEMBINA DAN MENYIAPKAN SKIM PERUMAHAN YANG MENGANDUNGI:
29 UNIT RUMAH TERES 1 TINGKAT DI ATAS LOT 40-LOT 68, MUKIM PENGKALAN BAHARU, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN : BLUE PRINT PROPERTIES SDN. BHD. | ||
Oleh | ||
LIEW YIT TI | ||
F. PEMBENTANGAN PERMOHONAN PELAN BANGUNAN
| ||
PELAN SIAP BINA BAGI SEBUAH KEDIAMAN PEKERJA 1 TINGKAT DI ATAS SEBAHAGIAN LOT 15594, LUMUT PORT INDUSTRIAL PARK, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN HAI SENG YEK FROZEN FOOD SDN. BHD.
[MEMBUKA SEMULA PERMOHONAN] | ||
Oleh | ||
KOH LIONG BOON | ||
| ||
PERMOHONAN PELAN BANGUNAN BAGI
CADANGAN SKIM PERUMAHAN YANG MENGANDUNGI 47 UNIT RUMAH TERES SETINGKAT DI ATAS LOT 1927, MUKIM LEKIR, DAERAH MANJUNG, PERAK DARUL RIDZUAN. UNTUK: PN.NURULHUDA BINTI ABDUL KARIM | ||
Oleh | ||
SAIFULAZLAN BIN SHAH | ||
| ||
PERMOHONAN PELAN BANGUNAN BAGI CADANGAN MEMBINA SEBUAH BANGUNAN SEMENTARA UNTUK PAMERAN KENDERAAN TERPAKAI BESERTA PEJABAT 1 TINGKAT DI ATAS SEBAHAGIAN LOT 5344, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TAN HEE PHENG.
[MEMBUKA SEMULA PERMOHONAN] | ||
Oleh | ||
KOH LIONG BOON | ||
G. PEMBENTANGAN PERMOHONAN LULUS DENGAN PINDAAN PELAN SELEPAS 28 HARI (SATU PERSATU)
| ||
PELAN SUSUNATUR UNTUK MENDAPATKAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21 AKTA 172 BAGI TUJUAN TUKAR SYARAT TANAH DARI PERTANIAN KEPADA SKIM PERUMAHAN SERTA PENYERAHAN DAN PEMILIKAN SEMULA DI BAWAH SEKSYEN 204D (KTN) DI ATAS GM 1023 LOT 1285, MUKIM SITIAWAN , DAERAH MANJUNG , PERAK DARUL RIDZUAN (KELUASAN KAWASAN 4.076 EKAR) | ||
Oleh | ||
SAMDIN BIN MAIBON | ||
| ||
PERMOHONAN KEBENARAN MERANCANG PELAN PERTAPAKAN BAGI CADANGAN UNTUK MENDIRIKAN 18 UNIT KEDAI PEJABAT 2-TINGKAT DI ATAS PLOT 2 - 19 (LOT LAMA LOT 25142 - LOT 25157), TAMAN PANTAI DAMAI 2, MUKIM PENGKALAN BAHARU, DAERAH MANJUNG, PERAK DARUL RIDZUAN.
UNTUK: TETUAN KARTIKA SAUJANA SDN. BHD. | ||
Oleh | ||
LIEW TZE SIANG | ||
| ||
CADANGAN PINDAAN DAN TAMBAHAN BANGUNAN SEDIA ADA, KOMPLEKS KOMERSIL 1 TINGKAT YANG MENGANDUNGI PUSAT BOWLING,MEDAN SELERA DAN GALERI JUALAN PERABUT, DI ATAS PT.14646, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN.
UNTUK : TETUAN KAR SIN BERHAD. | ||
Oleh | ||
MEOR MOHAMMAD FARED BIN MEOR RAZALI | ||
| ||
PERMOHONAN PELAN BANGUNAN IAITU BAGI CADANGAN TAMBAHAN DAN PINDAAN KEPADA PELAN LULUS NO FAIL : 19/003/0004/31/2019-102691 KE ATAS STESEN MINYAK BARU DAN PINDAAN SEBAHAGIAN KOMPLEKS PASARAYA 2 TINGKAT SEDIA ADA DI ATAS LOT43444, BANDAR SRI MANJUNG, MUKIM SITIAWAN, DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK RAPID SYNERGY BERHAD | ||
Oleh | ||
LEE YONG CHIEW | ||
| ||
PELAN BANGUNAN BAGI CADANGAN MEMBINA SEBUAH KILANG SARUNG TANGAN GETAH BLOK C1 YANG TERDIRI DARIPADA KILANG 1 TINGKAT (GRID LINE A—G / 9-39; GRID LINE G—J/ 37-42), ARAS MEZANIN (GRID LINE A—G / 5-9), KILANG 2 TINGKAT (GRID LINE A—G / 39-42), KILANG 3 TINGKAT (GRID LINE A—K / 1-9; GRID LINE G—J / 9-37), SEBUAH HOT WATER GENERATOR BUILDING, SEBUAH UTILITI BLOK, SEBUAH FIRE FIGHTING WATER TANK , SEBUAH OVERHEAD WATER TANK, SEBUAH EQUALIZATION TANK, SEBUAH PRE-TREATMENT TANK, SEBUAH FORMER CLEANING BUILDING, SEBUAH WEIGHBRIDGE CONTROL ROOM DAN SEBUAH GUARDHOUSE DI ATAS LOT 15558 DAN LOT 15653 MUKIM LUMUT DAERAH MANJUNG, PERAK DARUL RIDZUAN UNTUK TETUAN YTY INDUSTRY SDN. BHD. | ||
Oleh | ||
AZIZI BIN ABU BAKAR | ||