Loading...

Mesyuarat Jawatankuasa OSC

Majlis Bandaraya Iskandar Puteri


Mesyuarat Jawatankuasa OSC, Majlis Bandaraya Iskandar Puteri

 

TAJUK MESYUARAT

:

MESYUARAT JAWATANKUASA PUSAT SEHENTI (OSC) BIL.11/2026

TARIKH

:

11 JUN 2026 (KHAMIS)

MASA

:

9:30 AM

TEMPAT

:

BILIK MESYUARAT TOPEZ, ARAS 2, BANGUNAN TEMENGGONG IBRAHIM, MAJLIS BANDARAYA ISKANDAR PUTERI

PENGERUSI

:

YANG BERHORMAT HAJI HASRIN KAMAL BIN HASHIM

 

AGENDA MESYUARAT

 

1

PERUTUSAN PENGERUSI MESYUARAT OSC

2

PENGESAHAN MINIT MESYUARAT MESYUARAT JAWATANKUASA PUSAT SEHENTI (OSC) BIL.10/2026 PADA 19-05-2026

3

PERKARA-PERKARA BERBANGKIT

4

PEMBENTANGAN PERMOHONAN PEMAJUAN KELULUSAN

5

PEMBENTANGAN DAN PERTIMBANGAN KERTAS DASAR

6

PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN

7

PEMBENTANGAN KERTAS PEMAKLUMAN

8

PEMBENTANGAN STATUS DAN ISU PEMANTAUAN TAPAK

9

HAL-HAL LAIN BERKAITAN PERMOHONAN I

10

HAL-HAL LAIN BERKAITAN PERMOHONAN II

11

HAL-HAL LAIN

 

Kertas Pembentangan

A. PEMBENTANGAN PERMOHONAN SERENTAK

 

1. KERTAS MESYUARAT

 
CADANGAN PEMBANGUNAN YANG MENGANDUNGI: FASA 1A I) 171 UNIT RUMAH TERES 2 TINGKAT (20'X70') DI ATAS PLOT 210 - PLOT 380; II) 2 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER) DI ATAS PLOT 432 – PLOT 566; III) 2 UNIT PENCAWANG ELEKTRIK PADAT (COMPACT SUB) DI ATAS PLOT 571 & PLOT 809; IV) 1 UNIT RUMAH PAM DI ATAS PLOT 569; FASA 1B I) 117 UNIT RUMAH TERES 2 TINGKAT (20'X70') DI ATAS PLOT 93 - PLOT 209; II) 92 UNIT RUMAH TERES 2 TINGKAT (20'X65') DI ATAS PLOT 1 - PLOT 92; FASA 1C I) 102 UNIT RUMAH TERES 2 TINGKAT (20'X70') DI ATAS PLOT 381 - PLOT 431 & PLOT 433 - PLOT 483; II) 78 UNIT RUMAH TERES 2 TINGKAT (20'X65') DI ATAS PLOT 484 - PLOT 561; DI ATAS SEBAHAGIAN LOT 111 – LOT 115, DAN LOT 154 TAMAN BESTARI ALMA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM. UNTUK : KHOO SOON LEE REALTY SDN. BHD.
SLIDE SERENTAK_K1_KHOO SOON LEE REALTY SDN BHD
 
Oleh
MOK SWEE HOCK
 
 

 

2. KERTAS MESYUARAT

 
CADANGAN MEMBINA SEBUAH KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI: I. 1 BLOK KILANG SESEBUAH BERSERTA PEJABAT 2 TINGKAT DAN ARAS MEZZANINE II. 1 UNIT PENCAWANG ELEKTRIK PADAT (CSU) III. 1 UNIT KEBUK SAMPAH BERSERTA RUANG KITAR SEMULA DI ATAS LOT 168706, TAMAN PERINDUSTRIAN RINGAN PULAI, TAMAN IMPIAN EMAS, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK BLESSPLUS SDN BHD
SLIDE SERENTAK_K2_BLESSPLUS SDN. BHD.
 
Oleh
LEE SONG FATT
 
 

 

3. KERTAS MESYUARAT

 
CADANGAN PEMBANGUNAN 2 BLOK PANGSAPURI SECARA BERSTRATA (598 UNIT) YANG MENGANDUNGI: I. 1 BLOK PANGSAPURI - BLOK A 24 TINGKAT (299 UNIT) (ARAS L1 - L23) II. 1 BLOK PANGSAPURI - BLOK B 24 TINGKAT (299 UNIT) (ARAS L1 - L23) III. 1 BLOK TEMPAT LETAK KENDERAAN 6 TINGKAT BESERTA RUMAH KELAB 1 TINGKAT IV. 1 UNIT PONDOK PENGAWAL BESERTA RUMAH KELAB 2 TINGKAT V. 1 UNIT KEBUK SAMPAH BERSERTA RUANG KITAR SEMULA DI ATAS PTD 215475, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM. UNTUK GOMBAK HAVEN DEVELOPMENT SDN BHD
SLIDE SERENTAK_K3_GOMBAK HAVEN DEVELOPMENT SDN. BHD.
 
Oleh
CHNG CHEE LAM
 
 

 

4. KERTAS MESYUARAT

 
CADANGAN MENDIRIKAN SEBUAH STESEN MINYAK YANG MENGANDUNGI: I. 1 BLOK STESEN MINYAK BESERTA KEDAI SERBANEKA, RUANG PERNIAGAAN, SURAU BESERTA TANDAS DAN RESTORAN PANDU LALU 1 TINGKAT II. 1 UNIT KEBUK SAMPAH BESERTA RUANG KITAR SEMULA DAN BILIK KOMPRESSOR III. 1 UNIT PENCAWANG ELEKTRIK PADAT (COMPACT SUB) DI ATAS LOT 168661, JALAN CERIA, NUSA IDAMAN MUKIM PULAI, DAERAH JOHOR BAHRU,JOHOR DARUL TA’ZIM. LYB BEYOND SDN.BHD
SLIDE SERENTAK_K4_LYB BEYOND SDN. BHD.
 
Oleh
NUR FAIZAL BIN ABDULLAH
 
 

 

5. KERTAS MESYUARAT

 
CADANGAN PEMBANGUNAN BERSTRATA PANGSAPURI PERKHIDMATAN 2 BLOK 36 TINGKAT ( 1244 UNIT ) YANG MENGANDUNGI: FASA 1 I) 1 BLOK PANGSAPURI PERKHIDMATAN - TOWER A 36 TINGKAT (644 UNIT) II) PODIUM TEMPAT LETAK KERETA 8 TINGKAT BERSERTA KEMUDAHAN DI TINGKAT 9 III) 1 UNIT PONDOK PENGAWAL DI ATAS PTD 200284 (PARCEL C10), JALAN MEDINI SENTRAL 15, MEDINI, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK : CI MEDINI SDN. BHD.
SLIDE SERENTAK_K5_CI MEDINI SDN BHD.
 
Oleh
LEONG PIN HAN
 
 

 

6. KERTAS MESYUARAT

 
CADANGAN PEMBANGUNAN BERSTRATA PANGSAPURI PERKHIDMATAN 2 BLOK 33 TINGKAT ( 834 UNIT ) YANG MENGANDUNGI: FASA 1 I) 1 BLOK PANGSAPURI PERKHIDMATAN - TOWER A 33 TINGKAT (232 UNIT) II) PODIUM TEMPAT LETAK KERETA 8 TINGKAT BERSERTA KEMUDAHAN DI TINGKAT 9 III) 1 UNIT PONDOK PENGAWAL DI ATAS PTD 200288 (PARCEL C12), JALAN MEDINI SENTRAL 15, MEDINI, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK CI MEDINI SDN. BHD.
SLIDE SERENTAK_K6_CI MEDINI SDN BHD.
 
Oleh
LEONG PIN HAN
 
 

 

7. KERTAS MESYUARAT

 
CADANGAN MEROBOH DAN MEMBINA SEMULA SEBUAH KILANG INDUSTRI RINGAN SEDIADA YANG MENGANDUNGI :- I. 1 BLOK KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT II. 1 UNIT PONDOK PENGAWAL DI ATAS PTD 7428, JALAN PELEPAS 4/5, TAMAN PERINDUSTRIAN TANJUNG PELEPAS, MUKIM TANJUNG KUPANG, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM. UNTUK TSH SYNERGY SDN. BHD.
SLIDE SERENTAK_K7_TSH SYNERGY SDN. BHD.
 
Oleh
YU KOK LOON
 
 

 

8. KERTAS MESYUARAT

 
CADANGAN MEMBINA KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI: I. 1 BLOK KILANG 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT II. 1 UNIT RUMAH SAMPAH DAN KITAR SEMULA III. 1 UNIT PONDOK PENGAWAL IV. 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN PTD 115978, MUKIM KULAI, DAERAH KULAI, JOHOR DARUL TA'ZIM. UNTUK GOLDEN SYMPHONY SDN. BHD.
SLIDE SERENTAK_K8_GOLDEN SYMPHONY SDN. BHD.
 
Oleh
TEW SEH HWEE
 
 

 

9. KERTAS MESYUARAT

 
CADANGAN MEMBINA KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI: I. 1 BLOK KILANG 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT II. 1 UNIT RUMAH SAMPAH DAN KITAR SEMULA III. 1 UNIT PONDOK PENGAWAL IV. 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN PTD 115980, MUKIM KULAI, DAERAH KULAI, JOHOR DARUL TA'ZIM. UNTUK GOLDEN SYMPHONY SDN. BHD.
SLIDE SERENTAK_K9_GOLDEN SYMPHONY SDN. BHD.
 
Oleh
TEW SEH HWEE
 
 

 

10. KERTAS MESYUARAT

 
CADANGAN MEMBINA SEBUAH KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI: I. 1 BLOK KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT II. 1 UNIT RUMAH SAMPAH BERSERTA RUANG KITAR SEMULA III. 1 UNIT PONDOK PENGAWAL IV. 1 UNIT PENCAWANG ELEKTRIK (SATU RUANG) DI ATAS PTD 227212, JALAN SILC 4/4, KAWASAN PERINDUSTRIAN SILC, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK GREENHILL SILC SDN BHD
SLIDE SERENTAK_K10_GREENHILL SILC SDN. BHD.
 
Oleh
YEOH BOON KANG
 
 

 

11. KERTAS MESYUARAT

 
CADANGAN MEMBINA SEBUAH KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI: I. 1 BLOK KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT II. 1 UNIT RUMAH SAMPAH BERSERTA RUANG KITAR SEMULA III. 1 UNIT PONDOK PENGAWAL IV. 1 UNIT PENCAWANG ELEKTRIK (SATU RUANG) DI ATAS LOT 169254, JALAN SILC 4/4, KAWASAN PERINDUSTRIAN SILC, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK PENTAGON LAND SDN. BHD.
SLIDE SERENTAK_K11_PENTAGON LAND SDN BHD.
 
Oleh
IR. LEE KING FOOK
 
 

 

12. KERTAS MESYUARAT

 
CADANGAN MEMBINA SEBUAH KILANG INDUSTRI SEDERHANA YANG MENGANDUNGI: I. 1 BLOK KILANG SESEBUAH 1 TINGKAT BERSERTA PEJABAT 2 TINGKAT II. 1 UNIT RUMAH SAMPAH BERSERTA RUANG KITAR SEMULA III. 1 UNIT PONDOK PENGAWAL IV. 1 UNIT PENCAWANG ELEKTRIK (SATU RUANG) DI ATAS LOT 169265, JALAN SILC 4/2, KAWASAN PERINDUSTRIAN SILC, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK PENTAGON LAND SDN. BHD.
SLIDE SERENTAK_K12_PENTAGON LAND SDN BHD.
 
Oleh
IR. LEE KING FOOK
 
 

B. PEMBENTANGAN PERMOHONAN KEBENARAN MERANCANG

 

13. KERTAS MESYUARAT

 
PERMOHONAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21,
AKTA PERANCANGAN BANDAR DAN DESA 1976 (AKTA 172) BAGI CADANGAN MENDIRIKAN SEBUAH SURAU YANG MENGANDUNGI:

I. SEBUAH SURAU 1 TINGKAT
II.1 UNIT RUMAH SAMPAH BESERTA KITAR SEMULA

DI ATAS PTD 203200,TAMAN PULAI HIJAUAN, MUKIM PULAI,
DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM
UNTUK MAJLIS AGAMA ISLAM NEGERI JOHOR
SLIDE KM_K1_MAJLIS AGAMA ISLAM NEGERI JOHOR.
 
Oleh
TPR ABDUL HALIM BIN ALI HASSAN
 
 

 

14. KERTAS MESYUARAT

 
PERMOHONAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21, AKTA PERANCANGAN BANDAR DAN DESA 1976 (AKTA 172) BAGI CADANGAN PERDAGANGAN DI ATAS PTD 230792, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK COUNTRY VIEW RESOURCES SDN. BHD.
SLIDE KM_K2_COUNTRY VIEW RESOURCES SDN.BHD.
 
Oleh
RAHANI BINTI JUSOH
 
 

 

15. KERTAS MESYUARAT

 
PERMOHONAN KEBENARAN MERANCANG MENGIKUT SEKSYEN 21,
AKTA PERANCANGAN BANDAR DAN DESA 1976 (AKTA 172) BAGI CADANGAN
PINDAAN FASA 1 DI ATAS LOT PTD 217865, PTD 217875 DAN PTD 217882, MUKIM PULAI,
DAERAH JOHOR BAHRU,JOHOR DARUL TA'ZIM.

UNTUK ISKANDAR CAPITAL SDN.BHD
SLIDE KM_K3_ISKANDAR CAPITAL SDN.BHD
 
Oleh
GOH LEI LEI
 
 

C. PEMBENTANGAN PERMOHONAN PELAN KERJA TANAH

 

16. KERTAS MESYUARAT

 
PERMOHONAN PELAN KERJA TANAH MENGIKUT SEKSYEN 70A, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN PEMBANGUNAN PERUMAHAN BERCAMPUR DI ATAS NO. PTD 123460, 123461, 123462, 123463, 123464 - 123542, 123543, 123544, 123545 - 123600, 123601, 123602, 123603 - 123628, 123629, 123630, 123631, 123632, 123633, 123634, 123635 - 123707, 123708, 123709,123710 - 123738, 123739, 123740 - 123751, 123752, 123753 - 123794, 123795 - 123870, 123871, 123872,123873 - 123906, 123907, 123908, 123909, 123910, 123911, 123912, 123913, 123914, 123916 - 123948,123949, 123950 - 124002, 124003, 124004 - 124034, 124035, 124036 - 124106, 124107 -124142, 124143,124144, 124145 DAN UNTUK PELEBARAN JALAN DI SEBAHAGIAN LOT 85645, LOT 27412, LOT 27413, LOT 34439 DAN RIZAB PARIT ZON B, BANDAR UDA UTAMA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK TETUAN UDA LAND (SOUTH) SDN.BHD
SLIDE INFRA_K1_UDA LAND (SOUTH) SDN. BHD.
 
Oleh
MOHAMAD RAFE BIN MAMAT
 
 

 

17. KERTAS MESYUARAT

 
PERMOHONAN PELAN KERJATANAH MENGIKUT SEKSYEN 70A, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN
MEMBINA SAMBUNGAN JALAN MEDINI SELATAN 6 HINGGA KE BULATAN PERSIMPANGAN UTAMA JALAN SUNWAY PENDAS 1 (0.3KM) DAN
SEBAHAGIAN JALAN SUNWAY PENDAS 1 (0.3KM), MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM.
UNTUK SUNWAY ISKANDAR SDN. BHD.
SLIDE SERENTAK_K13A_SUNWAY ISKANDAR SDN. BHD.
 
Oleh
JERRY CHUA KUO SHENG
 
 

D. PEMBENTANGAN PERMOHONAN PELAN JALAN DAN PERPARITAN

 

18. KERTAS MESYUARAT

 
PERMOHONAN PELAN JALAN DAN PARIT MENGIKUT SEKSYEN 9, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN PEMBANGUNAN PERUMAHAN BERCAMPUR DI ATAS PTD 123460, PTD 123461, PTD 123462, PTD 123463, PTD 123464 - 123542, PTD 123543, PTD 123544, PTD 123545 - PTD 123600, PTD 123601, PTD 123602, PTD 123603 - 123628, PTD 123629, PTD 123630, PTD 123631, PTD 123632, PTD 123633, PTD 123634, PTD 123635 - 123707, PTD 123708, PTD 123709, PTD 123710 - 123738, PTD 123739, PTD 123740 - 123751, PTD 123752, PTD 123753 - 123794, PTD 123795 - 123870, PTD 123871, PTD 123872, PTD 123873 - 123906, PTD 123907, PTD 123908, PTD 123909, PTD 123910, PTD 123911, PTD 123912, PTD 123913, PTD 123914, PTD 123916 - 123948, PTD 123949, PTD 123950 - 124002, PTD 124003, PTD 124004 - 124034, PTD 124035, PTD 124036 - 124106, PTD 124107 -124142, PTD 124143, PTD 124144, PTD 124145 DAN RIZAB PARIT ZON B, BANDAR UDA UTAMA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
SLIDE INFRA_K2_(JP)UDA LAND (SOUTH) SDN. BHD.
 
Oleh
MOHAMAD RAFE BIN MAMAT
 
 

 

19. KERTAS MESYUARAT

 
PERMOHONAN PELAN JALAN DAN PERPARITAN MENGIKUT SEKSYEN 9, AKTA JALAN, PARIT DAN BANGUNAN 1974 (AKTA 133) BAGI CADANGAN MEMBINA SAMBUNGAN JALAN MEDINI SELATAN 6 HINGGA KE BULATAN PERSIMPANGAN UTAMA JALAN SUNWAY PENDAS 1 (0.3KM) DAN SEBAHAGIAN JALAN SUNWAY PENDAS 1 (0.3KM), MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM.
UNTUK SUNWAY ISKANDAR SDN. BHD.
SLIDE SERENTAK_K13B_SUNWAY ISKANDAR SDN. BHD.
 
Oleh
JERRY CHUA KUO SHENG
 
 

E. PEMBENTANGAN PERMOHONAN PELAN LAMPU JALAN

 

20. KERTAS MESYUARAT

 
PERMOHONAN PELAN PINDAAN KE ATAS PELAN LULUS LAMPU JALAN NO RUJUKAN BIL.( )DLM.MBIP(E4)OSC/45/5/2025(A07)MBIP(ME/LJ)8/90-05/2025 BERTARIKH 25 JULAI 2025 BAGI CADANGAN PEMBANGUNAN BERSTRATA 1 BLOK RUMAH MAMPU MILIK JOHOR (RMMJ-B) 12 TINGKAT YANG MENGANDUNGI:
I. 1 BLOK RUMAH PANGSA (RMMJ-B) 12 TINGKAT (301 UNIT) DAN 1 UNIT SURAU BERSERTA KEMUDAHAN
II. 1 UNIT PENCAWANG ELEKTRIK TNB (DUA RUANG)
III. 1 UNIT KEBUK SAMPAH BERSERTA RUANG KITAR SEMULA
IV. 1 UNIT PONDOK PENGAWAL
DI ATAS LOT 111186, JALAN SUTERA KEKWA 1/2, TAMAN SUTERA UTAMA, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK TANAH SUTERA DEVELOPMENT SDN BHD
SLIDE M&E_K1_TANAH SUTERA DEVELOPMENT SDN. BHD.
 
Oleh
CHNG CHEE LAM
 
 

 

21. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN MENAIKTARAF JALAN SEDIA ADA DI PERSIMPANGAN JALAN PERSIARAN TEKNOLOGI, MUKIM KULAI, DAERAH KULAI, JOHOR DARUL TA'ZIM.
UNTUK GOLDEN SYMPHONY SDN. BHD.
SLIDE M&E_K8C_GOLDEN SYMPHONY SDN. BHD.
 
Oleh
LIM MENG WAH
 
 

 

22. KERTAS MESYUARAT

 
PERMOHONAN PELAN LAMPU JALAN BAGI CADANGAN MEMBINA SAMBUNGAN JALAN MEDINI SELATAN 6 HINGGA KE BULATAN PERSIMPANGAN UTAMA JALAN SUNWAY PENDAS 1 (0.3KM) DAN SEBAHAGIAN JALAN SUNWAY PENDAS 1 (0.3KM), MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK SUNWAY ISKANDAR SDN. BHD.
SLIDE SERENTAK_K13C_SUNWAY ISKANDAR SDN. BHD.
 
Oleh
MOHAN A/L SAMBANTHA MOORTHY
 
 

F. PEMBENTANGAN PERMOHONAN PELAN BANGUNAN

 

23. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KE ATAS PELAN LULUS MBIP(JB)RP/6/13/2024(30) BERTARIKH 11/12/2024 BAGI CADANGAN PEMBANGUNAN PERUMAHAN MENDIRIKAN 571 UNIT RUMAH MAMPU MILIK JOHOR 1 TINGKAT YANG MENGANDUNGI:
FASA 2
I) 203 UNIT RUMAH MAMPU MILIK JOHOR (22’ X 61’) 1 TINGKAT - JENIS D
DI ATAS PTD 9414 - PTD 9616
II) 368 UNIT RUMAH MAMPU MILIK JOHOR (24’ X 61’) 1 TINGKAT - JENIS D
DI ATAS PTD 9618 - PTD 9663, PTD 9666 - PTD 9721,
PTD 9723 – PTD 9988
III) 2 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER) DI ATAS
PTD 9412 & PTD 9664
DI ATAS SEBAHAGIAN GERBANG NUSAJAYA ISKANDAR PUTERI, PERUMAHAN ISKANDAR PUTERI BANGSA JOHOR, MUKIM TANJUNG KUPANG, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK HARTA NUSAJAYA SDN. BHD.
SLIDE PB_K1_HARTA NUSAJAYA SDN. BHD.
 
Oleh
HABRI BIN SALAM
 
 

 

24. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KEATAS PLAN LULUS NO. MBIP(JB) RS/9/34/2024(E1)/OSC/100/12/2024(A12) BERTARIKH 07 APR 2025 BAGI CADANGAN MEMBINA SEBUAH RUMAH BANGLO 1 TINGKAT DI ATAS LOT 88345 (PTD 102341) NO.25, JALAN SEROJA, LEDANG HEIGHTS, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA'ZIM UNTUK LEE BOON LYE
SLIDE PB_K2_LEE BOON LYE
 
Oleh
ENG KENG HUAT
 
 

 

25. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KE-2 KE ATAS PELAN LULUS MBIP(JB)RP/5/3/2024(45) BERTARIKH 8 SEPTEMBER 2024 BAGI TUJUAN CADANGAN PEMBANGUNAN PERUMAHAN BERSTRATA 331 UNIT YANG MENGANDUNGI:
FASA 1
I) 55 UNIT RUMAH TERES 2 TINGKAT (20’ X 70’) - JENIS A1
II) 77 UNIT RUMAH TERES 2 TINGKAT (22’ X 80’) - JENIS A3
III) 39 UNIT RUMAH TERES 3 TINGKAT (22’ X 90’) - JENIS A4
IV) 1 UNIT PONDOK PENGAWAL
V) 1 UNIT RUMAH KELAB 2 TINGKAT BERSERTA PENCAWANG ELEKTRIK
VI) 1 UNIT PENCAWANG ELEKTRIK TNB
VII) 1 UNIT RUMAH SAMPAH BESERTA PUSAT KITAR SEMULA
FASA 2
I) 16 UNIT RUMAH TERES 2 TINGKAT (24’ X 70’) - JENIS A2
II) 16 UNIT RUMAH KLUSTER 2 TINGKAT (34’ X 75’) - JENIS C1
III) 60 UNIT RUMAH KLUSTER 2 TINGKAT (34’ X 75’) - JENIS C2
IV) 2 UNIT RUMAH BERKEMBAR 2 TINGKAT (39’ X 90’) - JENIS B1
V) 34 UNIT RUMAH BERKEMBAR 3 TINGKAT (39’ X 90’) - JENIS B2
VI) 6 UNIT RUMAH BERKEMBAR 2 TINGKAT (39’ X 120’) - JENIS B3
VII) 16 UNIT RUMAH BERKEMBAR 3 TINGKAT (40’/45’ X 90’) - JENIS B4
VIII) 6 UNIT RUMAH BERKEMBAR 3 TINGKAT (39’ X 90’) - JENIS B5
IX) 4 UNIT RUMAH BERKEMBAR 2 TINGKAT (39’ X 120’) - JENIS B6
X) 1 UNIT PENCAWANG ELEKTRIK TNB
DI ATAS PTD 228020, PRESINT 1, TAMAN KEWS SENIBONG, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM UNTUK KEWS SENIBONG SDN. BHD.
SLIDE PB_K3_KEWS SENIBONG SDN. BHD.
 
Oleh
MD RAZIN BIN MAHMOOD
 
 

 

26. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN KE ATAS PELAN LULUS (NO.RUJ: MBIP(E1)OSC/12/3/2023 (A07)MBIP(JB)RP/8/3/2023) BERTARIKH 29.05.2023
BAGI CADANGAN PEMBANGUNAN PERUMAHAN BERSTRATA 454 UNIT RUMAH TERES DAN KLUSTER YANG MENGANDUNGI:
FASA 1:
I) 71 UNIT RUMAH TERES 2 TINGKAT JENIS A2 ( 30' X 65' )
II) 22 UNIT RUMAH TERES 3 TINGKAT JENIS A2A ( 30' X 65' )
III) 1 UNIT RUMAH KELAB 2 TINGKAT BERSERTA KOLAM RENANG, PEJABAT PENGURUSAN DAN
1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER)
IV) 1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER)
V) 1 UNIT PENCAWANG ELEKTRIK PADAT TNB (COMPACT SUBSTATION)
VI) 1 UNIT PONDOK PENGAWAL
VII) 1 UNIT KEBUK SAMPAH BERSERTA PUSAT KITAR SEMULA
FASA 2:
I) 74 UNIT RUMAH TERES 2 TINGKAT JENIS A2 ( 30' X 65' )
II) 40 UNIT RUMAH TERES 3 TINGKAT JENIS A2A ( 30' X 65' )
III) 9 UNIT RUMAH TERES 3 TINGKAT JENIS A3B ( 32' X 70' )
IV) 19 UNIT RUMAH TERES 3 TINGKAT JENIS A3C ( 32' X 75' )
V) 28 UNIT RUMAH KLUSTER 2 TINGKAT JENIS C3 ( 40' X 80' )
VI) 1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER)
FASA 3:
I) 89 UNIT RUMAH TERES 2 TINGKAT JENIS A2 ( 30' X65' )
II) 10 UNIT RUMAH TERES 3 TINGKAT JENIS A2A ( 30' X65' )
III) 19 UNIT RUMAH TERES 2 TINGKAT JENIS A3 ( 32' X65' )
IV) 17 UNIT RUMAH TERES 3 TINGKAT JENIS A3A ( 32' X65' )
FASA 4:
I) 56 UNIT RUMAH KLUSTER 2 TINGKAT JENIS C3A ( 40' X 80' )
DI ATAS LOT 141622, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
UNTUK TANAH SUTERA DEVELOPMENT SDN BHD
SLIDE SERENTAK_K14A_TANAH SUTERA DEVELOPMENT SDN. BHD.
 
Oleh
YAP YEW PENG
 
 

G. PEMBENTANGAN PERMOHONAN PELAN LANDSKAP

 

27. KERTAS MESYUARAT

 
PERMOHONAN PELAN PINDAAN LANDSKAP KE ATAS PELAN LULUS NO RUJ : MPJBT(JL) 02/02/048/2013 BAGI CADANGAN PEMBANGUNAN RUMAH SESEBUAH YANG MENGANDUNGI:

I. 67 UNIT LOT RUMAH SESEBUAH DI ATAS LOT 159269 - LOT 159335

EAST LEDANG, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
UNTUK HAVERSE QUEST SDN. BHD.
SLIDE PL_K1_HAVERSE QUEST SDN. BHD.
 
Oleh
LEE KWAI PHENG
 
 

H. PEMBENTANGAN PERMOHONAN TAMAN/JALAN/BANGUNAN

 

28. KERTAS MESYUARAT

 
PERMOHONAN NOMBOR PINTU BAGI CADANGAN PEMBANGUNAN BERSTRATA PANGSAPURI PERKHIDMATAN 2 BLOK 32 TINGKAT DAN 31 TINGKAT (802 UNIT) YANG MENGANDUNGI:
FASA 1
(I) 1 BLOK PANGSAPURI PERKHIDMATAN - TOWER A, 32 TINGKAT (405 UNIT)
(II) PODIUM TEMPAT LETAK KERETA 7 TINGKAT BERSERTA KEMUDAHAN DI TINGKAT 8
(III) 1 UNIT PONDOK PENGAWAL
FASA 2
(I) 1 BLOK PANGSAPURI PERKHIDMATAN - TOWER B,31 TINGKAT (397 UNIT)
DI ATAS PTD 200287 (PARCEL C11), MEDINI, ISKANDAR PUTERI,MUKIM PULAI, DAERAH JOHOR
BAHRU, JOHOR DARUL TA'ZIM.
UNTUK : CI MEDINI SDN. BHD.
SLIDE KM_K4_CI MEDINI SDN. BHD.
 
Oleh
TAN CHOON KIAT
 
 

 

29. KERTAS MESYUARAT

 
PERMOHONAN NOMBOR BANGUNAN BAGI CADANGAN PEMBANGUNAN PUSAT DATA (DATA CENTRE) YANG MENGANDUNGI :
FASA 1
I) 1 BLOK PUSAT DATA 3 TINGKAT DAN PEJABAT 2 TINGKAT BESERTA ARAS MEZANIN
II) 1 BLOK PENCAWANG ELEKTRIK (CONSUMER SUBSTATION) 3 TINGKAT
III) 1 UNIT PONDOK PENGAWAL DAN RUMAH SAMPAH BESERTA RUANG KITAR SEMULA 1 TINGKAT
IV) 1 UNIT RUMAH PAM 1 TINGKAT
V) 1 UNIT RUMAH PAM BESERTA TANGKI AIR BAWAH TANAH

FASA 2
I) 1 BLOK PUSAT DATA 3 TINGKAT DAN PEJABAT 2 TINGKAT BESERTA ARAS MEZANIN
II) 1 BLOK PENCAWANG ELEKTRIK (CONSUMER SUBSTATION) 2 TINGKAT
III) 1 UNIT PONDOK PENGAWAL DAN RUMAH SAMPAH BESERTA RUANG KITAR SEMULA 1 TINGKAT
IV) 1 UNIT RUMAH PAM 1 TINGKAT

DI SEBAHAGIAN PTD 227197, JALAN MEGA 2/8, TAMAN PERINDUSTRIAN NUSA CEMERLANG, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
UNTUK NANDA DIGITAL SDN BHD
SLIDE KM_K5_NANDA DIGITAL SDN BHD
 
Oleh
CHEAH KAH LIP
 
 

 

30. KERTAS MESYUARAT

 
PERMOHONAN PINDAAN NAMA JALAN DAN NOMBOR BANGUNAN (SKIM BERSTRATA) DI ATAS PELAN LULUS RUJ NO. MBIP(PB)2/15/11-6 BERTARIKH 29.02.2024 BAGI CADANGAN PEMBANGUNAN
PERUMAHAN BERSTRATA 454 UNIT RUMAH TERES DAN KLUSTER YANG MENGANDUNGI:
FASA 1:
I) 71 UNIT RUMAH TERES 2 TINGKAT JENIS A2 ( 30' X 65' )
II) 22 UNIT RUMAH TERES 3 TINGKAT JENIS A2A ( 30' X 65' )
III) 1 UNIT RUMAH KELAB 2 TINGKAT BERSERTA KOLAM RENANG, PEJABAT PENGURUSAN DAN 1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER)
IV) 1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER)
V) 1 UNIT PENCAWANG ELEKTRIK PADAT TNB (COMPACT SUBSTATION)VI) 1 UNIT PONDOK PENGAWAL
VII) 1 UNIT KEBUK SAMPAH BERSERTA PUSAT KITAR SEMULA
FASA 2:
I) 74 UNIT RUMAH TERES 2 TINGKAT JENIS A2 ( 30' X 65' )
II) 40 UNIT RUMAH TERES 3 TINGKAT JENIS A2A ( 30' X 65' )
III) 9 UNIT RUMAH TERES 3 TINGKAT JENIS A3B ( 32' X 70' )
IV) 19 UNIT RUMAH TERES 3 TINGKAT JENIS A3C ( 32' X 75' )
V) 28 UNIT RUMAH KLUSTER 2 TINGKAT JENIS C3 ( 40' X 80' )
VI) 1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER)
FASA 3:
I) 89 UNIT RUMAH TERES 2 TINGKAT JENIS A2 ( 30' X65' )
II) 10 UNIT RUMAH TERES 3 TINGKAT JENIS A2A ( 30' X65' )
III) 19 UNIT RUMAH TERES 2 TINGKAT JENIS A3 ( 32' X65' )
IV) 17 UNIT RUMAH TERES 3 TINGKAT JENIS A3A ( 32' X65' )
FASA 4:
I) 56 UNIT RUMAH KLUSTER 2 TINGKAT JENIS C3 ( 40' X 80' )
DI ATAS LOT 141622, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM
UNTUK TANAH SUTERA DEVELOPMENT SDN BHD
SLIDE SERENTAK_K14B_TANAH SUTERA DEVELOPMENT SDN. BHD.
 
Oleh
YAP YEW PENG
 
 

I. PERBENTANGAN PERMOHONAN PERMIT SEMENTARA BANGUNAN RUMAH PEKERJA TAPAK BINA

 

31. KERTAS MESYUARAT

 
PERMOHOHAN PERMIT SEMENTARA PUSAT PENEMPATAN PEKERJA DI TAPAK BINA YANG MENGANDUNGI :-

1) 5 BLOK PUSAT PENEMPATAN PEKERJA 2 TINGKAT (20 UNIT BILIK)
2) 1 BLOK DAPUR PEKERJA
3) 1 BLOK KANTIN
4) 2 BLOK TANDAS PEKERJA (20 UNIT TANDAS DAN 20 UNIT BILIK MANDI)
5) 1 UNIT STOR
6) 1 UNIT RUMAH SAMPAH
7) PAPAN DENDENG (HOARDING)

DI ATAS KAWASAN LAPANG PTD 221865

UNTUK CADANGAN PEMBANGUNAN 379 UNIT RUMAH TERES 2 TINGKAT DAN 42 UNIT KEDAI PEJABAT 2 & 3 TINGKAT, DI ATAS SEBAHAGIAN PTD 208515, MUKIM PULAI, DAERAH JOHOR BHARU, JOHOR DARUL TA'ZIM. UNTUK KIMLUN SDN BHD
SLIDE PB_K4_KIMLUN SDN. BHD.
 
Oleh
KHAIRIL HALIM BIN MOHAMAD