Mesyuarat Pra Jawatankuasa OSC

Majlis Bandaraya Subang Jaya


Mesyuarat Pra Jawatankuasa OSC, Majlis Bandaraya Subang Jaya

 

TAJUK MESYUARAT

:

MESYUARAT TEKNIKAL PELAN BIL. 07/2021 / 12 APRIL 2021

TARIKH

:

14 APRIL 2021 (RABU)

MASA

:

2:30 PM

TEMPAT

:

BILIK DATUK BANDAR MBSJ

PENGERUSI

:

DATUK BANDAR TPR HJH NORAINI BINTI ROSLAN

 

AGENDA MESYUARAT

 

1

PERUTUSAN PENGERUSI MESYUARAT PRA OSC

2

PENGESAHAN MINIT MESYUARAT MESYUARAT TEKNIKAL PELAN BIL. 06/2021 / 2 APRIL 2021 PADA 02-04-2021

3

PERKARA-PERKARA BERBANGKIT

4

PEMBENTANGAN PERMOHONAN

5

PEMBENTANGAN KERTAS PEMAKLUMAN

6

HAL-HAL LAIN BERKAITAN PERMOHONAN I

7

HAL-HAL LAIN BERKAITAN PERMOHONAN II

8

HAL-HAL LAIN

 

Kertas Pembentangan

A. PEMBENTANGAN PERMOHONAN PELAN JALAN DAN PERPARITAN

 

1. KERTAS MESYUARAT 4.7.2.1

 
CADANGAN PINDAAN KELULUSAN PELAN JALAN DAN PERPARITAN RUJ. NO. MPSJ.KEJ.BP7.600- 1/20/40 (26) BERTARIKH 8 JULAI 2019 BAGI MEMBINA SEBUAH STESEN MRT BERTINGKAT UPM (S29) YANG MENGANDUNGI:
1. SEBUAH BANGUNAN STESEN MRT 3 TINGKAT
2. SATU UNIT BANGUNAN ‘ENTRANCE BOX’ 2 TINGKAT
3. SATU UNIT BANGUNAN ‘TRACTION POWER SUBSTATION 33KV’ (JENIS A1) 2 TINGKAT
4. SATU UNIT BANGUNAN UTILITI (JENIS B2) 2 TINGKAT
5. SATU UNIT BANGUNAN ‘BULK POWER SUBSTATION’ (BSS) 4 TINGKAT
6. SATU UNIT BANGUNAN ‘PENCAWANG MASUK UTAMA’ (PMU)
7. SATU UNIT ‘SUBSURFACE SEWERAGE TREATMENT SYSTEM’ (SSTS) (BAWAH TANAH)
8. SATU PLOT KEMAJUAN AKAN DATANG (KAD)
9. SATU UNIT JEJANTAS PEJALAN KAKI YANG MENGHUBUNGKAN STESEN MRT KE PLOT KEMAJUAN AKAN DATANG (KAD)
DI ATAS SEBAHAGIAN PLOT 12, PLOT 13, LOT 27648, LOT 28173, LOT 5377 DAN SEBAHAGIAN RIZAB JALAN, PEKAN SERDANG, DAERAH PETALING, SELANGOR DARUL EHSAN.
MASS RAPID TRANSIT CORPORATION SDN. BHD.
 
Oleh
TETUAN MASS RAPID TRANSIT CORPORATION SDN. BHD.
 
 

 

2. KERTAS MESYUARAT 4.7.2.2

 
CADANGAN PINDAAN KEPADA PELAN LULUS
[NO. FAIL: MPSJ.KEJ.BP5.600-1/20/8(22)] BERTARIKH 10 OGOS 2017 KE ATAS CADANGAN KELULUSAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN PENDIRIAN BANGUNAN 2 BLOK PANGSAPURI BERBILANG TINGKAT YANG TERDIRI DARIPADA:
A. 1 BLOK PANGSAPURI KOS TINGGI 37 TINGKAT (255 UNIT) TERMASUK 1 TINGKAT KEMUDAHAN 'SKY TERRACE' DAN 2 TINGKAT KEMUDAHAN AMENITI DI ATAS BUMBUNG DAN 1 TINGKAT TEMPAT LETAK KERETA, KEMUDAHAN LIF DAN LOBI DI ARAS BAWAH (LG);
B. 1 BLOK PANGSAPURI KOS TINGGI 37 TINGKAT (255 UNIT) TERMASUK 1 TINGKAT KEMUDAHAN 'SKY TERRACE' DAN 2 TINGKAT KEMUDAHAN AMENITI DI ATAS BUMBUNG;
C. 1 BLOK BANGUNAN KEMUDAHAN 4 TINGKAT YANG MENGANDUNGI 3 TINGKAT KEMUDAHAN DAN PEJABAT PENGURUSAN DI ARAS BAWAH DAN 1 TINGKAT RUMAH KELAB DI ARAS 4 BESERTA 1 TINGKAT KEMUDAHAN TEMPAT LETAK KERETA DI ARAS BAWAH RENDAH (LG);
D. 1 BLOK BANGUNAN TEMPAT LETAK KERETA 4 TINGKAT YANG MENGANDUNGI 3 TINGKAT TEMPAT LETAK KERETA, KEMUDAHAN BERKAITAN, RUANG PERNIAGAAN DI ARAS 1 DAN 1 TINGKAT TAMAN REKREASI & LANSKAP, GELANGGANG TENIS, BADMINTON, KOLAM RENANG, SURAU DI ARAS 4 BESERTA 1 TINGKAT KEMUDAHAN TEMPAT LETAK KERETA DI ARAS BAWAH RENDAH (LG);
SELUAS 7.58 EKAR, DI ATAS LOT PT 7359 (LOT LAMA 6045 & 6046), JALAN PUCHONG UTAMA 1, TAMAN PUCHONG UTAMA, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN
HILLCREST GARDENS SDN. BHD.
 
Oleh
TETUAN HILLCREST GARDENS SDN. BHD.
 
 

 

3. KERTAS MESYUARAT 4.7.2.3

 
CADANGAN KELULUSAN PINDAAN PELAN JALAN DAN PERPARITAN BAGI CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI:
1. PERUMAHAN STRATA PETAK BERTANAH ( 46 UNIT)
I.) RUMAH SESEBUAH 3 TINGKAT - 2 UNIT
II.) RUMAH BERKEMBAR 3 TINGKAT - 40 UNIT
III.) RUMAH KLUSTER 3 TINGKAT - 4 UNIT
IV.) SEBUAH PONDOK PENGAWAL
V.) SEBUAH PENCAWANG ELEKTRIK

2) PERUMAHAN STRATA BERTINGKAT,
I.) BLOK 1, 16 TINGKAT - 45 UNIT
II.) BLOK 2 , 12 TINGKAT - 46 UNIT
III.) BLOK 3 - 22 , 3 TINGKAT - 20 UNIT
IV.) TEMPAT LETAK KERETA
V.) TEMPAT LETAK MOTOSIKAL
VI.) SEBUAH PONDOK PENGAWAL
VII.) 2 UNIT PENCAWANG ELEKTRIK ( DOUBLE CHAMBER)
VIII.) 1 UNIT RUMAH PUMP KUMBAHAN

3) PERUMAHAN BERSEPADU KOS SEDERHANA, SEDERHANA RENDAH DAN KOS RENDAH,
I.) PERUMAHAN KOS SEDERHANA - 32 UNIT
II.) PERUMAHAN SEDERHANA RENDAH - 63 UNIT
III.) PERUMAHAN KOS RENDAH - 63 UNIT
IV.) 1 UNIT PENCAWANG ELEKTRIK

DI ATAS LOT PT 12602 ( HS(D) 124468) , LOT 1088 ( HS(D) 124669) PERSIARAN PUTRA PERDANA, PUTRA HEIGHTS, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN
MARVELANE HOME SDN. BHD.
 
Oleh
TETUAN MARVELANE HOME SDN. BHD.
 
 

 

4. KERTAS MESYUARAT 4.7.2.4

 
CADANGAN PINDAAN KEPADA PELAN KELULUSAN PELAN JALAN DAN PERPARITAN NO RUJUKAN: (MPSJ.KEJ.BP4.600-1/20/29( ) TARIKH 12 JULAI 2019 BAGI CADANGAN MEMBINA 356 UNIT RUMAH TERES 3 TINGKAT YANG MENGANDUNGI: -

FASA 1 (136 UNIT):

1. 7 UNIT JENIS 1A1 (INTERMEDIATE LOT) 9. 15 UNIT JENIS 1C (CORNER LOT)
2. 6 UNIT JENIS 1A2 (INTERMEDIATE LOT) 10. 2 UNIT JENIS 1D3 (END LOT)
3. 5 UNIT JENIS 1A3 (INTERMEDIATE LOT) 11. 2 UNIT JENIS 1D4 (END LOT)
4. 5 UNIT JENIS 1A4 (INTERMEDIATE LOT) 12. 1 UNIT JENIS 1E1 (INTERMEDIATE LOT)
5. 25 UNIT JENIS 1B1 (INTERMEDIATE LOT) 13. 1 UNIT JENIS 1E2 (INTERMEDIATE LOT)
6. 24 UNIT JENIS 1B2 (INTERMEDIATE LOT) 14. 3 UNIT JENIS 1E3 (INTERMEDIATE LOT)
7. 18 UNIT JENIS 1B3 (INTERMEDIATE LOT) 15. 3 UNIT JENIS 1E4 (INTERMEDIATE LOT)
8. 18 UNIT JENIS 1B4 (INTERMEDIATE LOT) 16. 1 UNIT JENIS 2D (CORNER LOT)

DI ATAS LOT 64235 – LOT 64370 SAHAJA UNTUK FASA 1 (FASA 1A)

FASA 2 (100 UNIT):

1. 12 UNIT JENIS 1A1 (INTERMEDIATE LOT) 10. 1 UNIT JENIS 1D1 (END LOT)
2. 10 UNIT JENIS 1A2 (INTERMEDIATE LOT) 11. 2 UNIT JENIS 1D2 (END LOT)
3. 8 UNIT JENIS 1A3 (INTERMEDIATE LOT) 12. 3 UNIT JENIS 1D3 (END LOT)
4. 9 UNIT JENIS 1A4 (INTERMEDIATE LOT) 13. 2 UNIT JENIS 1D4 (END LOT)
5. 10 UNIT JENIS 1B1 (INTERMEDIATE LOT) 14. 2 UNIT JENIS 1G1 (INTERMEDIATE LOT)
6. 9 UNIT JENIS 1B2 (INTERMEDIATE LOT) 15. 2 UNIT JENIS 1G2 (INTERMEDIATE LOT)
7. 11 UNIT JENIS 1B3 (INTERMEDIATE LOT) 16. 2 UNIT JENIS 2A (CORNER LOT)
8. 11 UNIT JENIS 1B4 (INTERMEDIATE LOT) 17. 2 UNIT JENIS 2E (CORNER LOT)
9. 4 UNIT JENIS 1C (CORNER LOT)

DI ATAS LOT 64015 – LOT 64114 SAHAJA UNTUK FASA 2 (FASA 1A)

FASA 3 (120 UNIT):

1. 6 UNIT JENIS 1A1 (INTERMEDIATE LOT) 12. 2 UNIT JENIS 1D3 (END LOT)
2. 8 UNIT JENIS 1A2 (INTERMEDIATE LOT) 13. 2 UNIT JENIS 1D4 (END LOT)
3. 9 UNIT JENIS 1A3 (INTERMEDIATE LOT) 14. 1 UNIT JENIS 1F1 (INTERMEDIATE LOT)
4. 7 UNIT JENIS 1A4 (INTERMEDIATE LOT) 15. 1 UNIT JENIS 1F2 (INTERMEDIATE LOT)
5. 17 UNIT JENIS 1B1 (INTERMEDIATE LOT) 16. 2 UNIT JENIS 1G1 (INTERMEDIATE LOT)
6. 14 UNIT JENIS 1B2 (INTERMEDIATE LOT) 17. 2 UNIT JENIS 1G2 (INTERMEDIATE LOT)
7. 16 UNIT JENIS 1B3 (INTERMEDIATE LOT) 18. 3 UNIT JENIS 2A (CORNER LOT)
8. 17 UNIT JENIS 1B4 (INTERMEDIATE LOT) 19. 1 UNIT JENIS 2B (CORNER LOT)
9. 6 UNIT JENIS 1C (CORNER LOT) 20. 1 UNIT JENIS 2C (CORNER LOT)
10. 2 UNIT JENIS 1D1 (END LOT) 21. 1 UNIT JENIS 2E (CORNER LOT)
11. 2 UNIT JENIS 1D2 (END LOT)

DI ATAS LOT 64115 – LOT 64234 SAHAJA UNTUK FASA 3 (FASA 1A).

DAN DI ATAS LOT 64015 HINGGA LOT 65412 (DAHULUNYA PT 25068), PT 17048 DAN 17049 (DAHULUNYA LOT 1675 DAN LOT 1676), SERTA PEMBANGUNAN PERINDUSTRIAN DI ATAS PT 25067, DI TAMAN PUCHONG LEGENDA, 47170 PUCHONG, SELANGOR DARUL EHSAN.
HUGES DEVELOPMENT SDN. BHD. (198830-W)
 
Oleh
UNTUK: HUGES DEVELOPMENT SDN. BHD. (198830-W)
 
 

B. PEMBENTANGAN PERMOHONAN PELAN LAMPU JALAN

 

5. KERTAS MESYUARAT 4.7.4.1

 
CADANGAN KELULUSAN PELAN LAMPU JALAN UNTUK CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH MENARA PEJABAT 31 TINGKAT YANG MENGANDUNGI:-
A) BANGUNAN PEJABAT 22 TINGKAT (TINGKAT 10-TINGKAT 31) YANG TERDIRI DARIPADA:
I) 52 UNIT PEJABAT JENIS A
II) 87 UNIT PEJABAT JENIS B1
III) 43 UNIT PEJABAT JENIS B1A
IV) 16 UNIT PEJABAT JENIS B2
V) 28 UNIT PEJABAT JENIS C1
VI) 8 UNIT PEJABAT JENIS C2
VII) 26 UNIT PEJABAT JENIS D1
VIII) 8 UNIT PEJABAT JENIS D2
IX) 42 UNIT PEJABAT JENIS F
X) 32 UNIT PEJABAT MAMPU MILIK JENIS E1 DAN E2
XI) BERSERTA KEMUDAHAN-KEMUDAHAN SAMPINGAN-BILIK MESYUARAT 1 DAN 2, BILIK PENGARAH, PEJABAT PENGURUSAN, GIMNASIUM, BILIK KAKITANGAN DAN BILIK WAP-(TINGKAT 14)
B) 8 UNIT RUANG PERNIAGAAN (TINGKAT 1)
C) 8 TINGKAT PODIUM TEMPAT LETAK KENDERAAN (TINGKAT 2-TINGKAT 9)
D) PENCAWANG ELEKTRIK DAN RUANG SOKONGAN (TINGKAT BAWAH TANAH)

DIATAS LOT 115900 (DAHULUNYA ADALAH PT 73040 (HSD 312791) JALAN PUTERI 4/7, BANDAR PUTERI SELANGOR DARUL EHSAN
FLORA DEVELOPMENT SDN BHD
 
Oleh
TETUAN FLORA DEVELOPMENT SDN BHD
 
 

C. PEMBENTANGAN PERMOHONAN PELAN BANGUNAN

 

6. KERTAS MESYUARAT 4.1.1

 
CADANGAN TAMBAHAN DAN PERUBAHAN DI SEBAHAGIAN TINGKAT BAWAH (NUCLEAR MEDICINE) PADA SEBUAH HOSPITAL PAKAR 7 TINGKAT DENGAN 1 TINGKAT BASEMEN SEDIADA DI ATAS LOT 4247, NO. 1, JALAN SS 12/1A, 47500 SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
RSD HOSPITALS SDN BHD
 
Oleh
UNTUK TETUAN: RSD HOSPITALS SDN BHD
 
 

 

7. KERTAS MESYUARAT 4.1.2

 
CADANGAN TAMBAHAN DAN UBAHSUAI PADA KILANG TERES 2 TINGKAT SEDIADA DI ATAS LOT P.T 33503 (P.T 0000773) & P.T 33504 (P.T 00007704), NO.29 & NO.31, JALAN PBS 14/2, TAMAN PERINDUSTRIAN BUKIT SERDANG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
NG TET KONG
 
Oleh
UNTUK: NG TET KONG